    • 6. 发明专利
    • METHOD OF COMPACTING SANDY GROUND
    • JPS61200216A
    • 1986-09-04
    • JP22015784
    • 1984-10-19
    • HAZAMA GUMI
    • MIHARA MASAYANISHI KUNIO
    • E02D3/08
    • PURPOSE:To effectively transfer vertical vibration energy produced during penetration, by a method wherein a drain pipe and a support pile are penetrated into an upper sandy ground, the following support pile is added to the preceding pile to penetrate only the piles, and filling with a filling material is effected as the drain pipe is pulled off. CONSTITUTION:A drain pipe 1 and a support pile 9 are simultaneously penetrated into an upper sandy ground 8 by a pile driving machine, and gap water 10 entering a cylinder body 2 is discharged to a ground surface. After they are penetrated down to a given position, the following support pile 9 is added to the preceding pile, and only the support piles 9 are penetrated by a pile driving machine. After the pile is penetrated down to a support layer 13, a filling material 15, such as sand, is charged as, with a bottom cover 3 opened, the drain pipe 1 is pulled off, and the surrounding of the support piles 9 is filled with the filling material 15. This causes a drain with a blade to be penetrated together with the support piles, and enables vertical vibration energy, produced during penetration, to be repeatedly exerted as a shearing force throughout a wide range of the upper sandy ground.
    • 7. 发明专利
    • Method of improving sandy ground
    • 改善砂土地基的方法
    • JPS6198813A
    • 1986-05-17
    • JP22015684
    • 1984-10-19
    • Hazama Gumi Ltd
    • MIHARA MASAYANISHI KUNIO
    • E02D3/08E02D3/10
    • E02D3/10
    • PURPOSE:To effectively compact a sandy ground through effective propagation of vertical vibration of a pipe to a sandy ground, by a method wherein, during penetration of a pipe, gap water is collected in the pipe to drain the water to a ground surface. CONSTITUTION:A casing pipe 1 is penetrated into a sandy ground 7 through application of vertical vibration, and gap water 8, entering the pipe 1 through slit formed in and a filter attached to the peripheral surface of a pipe 1, is drained through a hose 10. A given amount of a filler 12, such as sand, is charged into the pipe 1, the bottom cover 3 of the pipe 1 is opened, and the pipe is lifted to a given position. By re-driving the pipe 1, the bottom cover 3 is closed, the filler 12 is compacted, and the pipe is pressed in the sandy ground 7 therearound. This causes the gap water to be collected in the pipe 1 during penetration of the pipe 1 to drain the water to a ground surface, resulting in the possibility to effectively propagate vertical vibration of the pipe 1 to the sandy ground to effectively compact the sandy ground.
    • 目的:通过有效地将管道的垂直振动传播到沙地来有效地压实沙地,通过一种方法,其中在管道穿透期间,将间隙水收集在管道中以将水排出到地面。 构成:通过施加垂直振动,套管1穿过沙地7,并且通过形成在其中的狭缝形成的狭缝8和连接到管1的外周表面的过滤器的间隙水8通过软管排出 将一定量的填料12(例如砂)装入管1中,管1的底盖3打开,并将管提升到给定位置。 通过重新驱动管1,底盖3关闭,填料12被压实,并且管被压在其周围的沙地7中。 这导致在管道1渗透期间在管道1中收集间隙水以将水排放到地表面,导致有效地将管1的垂直振动传播到沙地以有效地压实沙地 。