    • JP2011127398A
    • 2011-06-30
    • JP2009289429
    • 2009-12-21
    • Fujita Corp株式会社フジタ
    • YOSHIKAWA KAZUYUKICHICHIBU AKIYOSHI
    • E21D11/06
    • PROBLEM TO BE SOLVED: To prevent lowering in the durability of block lining after repair by preventing occurrence of joint cavities in joints, and to facilitate execution of construction of a structure for draining leaked water without lowering the durability of the block lining.
      SOLUTION: The joint portions with reduced thickness occurred in the joints 14 of the block lining 12 are cleaned, and a joint material 16a of a first layer is filled in the cleaned joint portions with reduced thickness. Then, stainless metal fittings 24 formed in a clip shape are mounted in the joint portions with a part of the respective metal fittings elastically deformed to be embedded in the first-layer joint material 16a, and a joint material 16b of a second layer is filled in the joint portions in which the metal fittings 24 are mounted. In case the water leaks from the block lining 12, a hose for water drainage is placed in the joint portions within a range where the water leaks, and then the first-layer joint material 16a, the metal fittings 24 and the second-layer joint material 16b are filled in the joint portions, so as to have a structure with the hose for water drainage embedded in the joint 14.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了防止修理后的块体衬里的耐久性通过防止接头处的接合腔发生而降低,并且便于执行用于排出泄漏的水的结构的结构,而不降低块体衬里的耐久性。 解决方案:在块体衬垫12的接头14处发生的具有减小的厚度的接合部被清洁,并且第一层的接合材料16a以减小的厚度填充在清洁的接合部分中。 然后,将形成为夹子形状的不锈钢金属配件24安装在接合部中,使各个金属配件的一部分弹性变形以嵌入第一层接合材料16a中,并且填充第二层的接合材料16b 在其中安装金属配件24的接合部分中。 如果水从块体衬里12泄漏,则在漏水的范围内,在接头部分放置用于排水的软管,然后将第一层接合材料16a,金属配件24和第二层接头 材料16b填充在接合部分中,以便具有嵌入在接头14中的排水软管的结构。版权所有(C)2011,JPO&INPIT
    • 2. 发明专利
    • Reinforcing method for tunnel lining
    • 隧道衬砌加固方法
    • JP2010077747A
    • 2010-04-08
    • JP2008249668
    • 2008-09-29
    • Fujita CorpRailway Technical Res Inst株式会社フジタ財団法人鉄道総合技術研究所
    • OKANO NORIYUKIUEMURA YOSHIYUKINAKANISHI YUSUKEYOSHIKAWA KAZUYUKIHIRANO KATSUNORIOKAYA SHUJICHICHIBU AKIYOSHI
    • E21D11/00
    • PROBLEM TO BE SOLVED: To provide a reinforcing method for tunnel lining, which facilitates installation work and can achieve great cost reduction.
      SOLUTION: In this reinforcing method for tunnel lining, an anchor hole 10 is formed on the tunnel inner-space side of the tunnel lining 2, and an anchor bolt 5 is arranged in the anchor hole 10. Further, there are provided a fastening fitting 4, which comprises a connecting hole 4A and a fixing hole 4B for being fixed to the connecting hole 4A and the anchor bolt 5, and a fastening fitting assembly 3, which comprises a continuous thread stud 7 fixed to the connecting hole 4A so as to connect the fastening fittings 4 to each other and a connecting nut 8 for connecting the continuous thread stud 7 to the fastening fitting 4. The fastening fitting 4 is fixed by means of a fixing nut 6 in such a manner that the fixing hole 4B of the fastening fitting 4 is aligned with the anchor bolt 5 in such a state that the fastening fitting assembly 3 is temporarily assembled by means of the connecting nut 8, and subsequently, the fastening fittings 4 are fixed to each other by means of the connecting nut 8 of the fastening fitting assembly 3.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供隧道衬砌的加固方法,其有利于安装工作并且可以实现极大的降低成本。 解决方案:在隧道衬砌的这种加固方法中,在隧道衬砌2的隧道内空间侧形成有锚定孔10,锚定孔10中设置有锚定螺栓5。另外, 紧固配件4包括连接孔4A和用于固定到连接孔4A和锚定螺栓5的固定孔4B和紧固配件组件3,该紧固配件组件3包括固定到连接孔4A上的连续螺纹螺柱7 以将紧固配件4彼此连接,以及用于将连续螺纹螺栓7连接到紧固配件4的连接螺母8.紧固配件4通过固定螺母6固定,使得固定孔 在紧固配件组件3通过连接螺母8临时组装的状态下,紧固配件4的4B与锚定螺栓5对准,随后,紧固配件4通过 connecti 紧固配件组件3的螺母8。版权所有(C)2010,JPO&INPIT
    • 3. 发明专利
    • Configuration of underground structure and construction method thereof
    • 地下结构的构造及其施工方法
    • JP2009235831A
    • 2009-10-15
    • JP2008085224
    • 2008-03-28
    • Fujita Corp株式会社フジタ
    • YOSHIKAWA KAZUYUKI
    • E21D9/04E21D9/06
    • PROBLEM TO BE SOLVED: To suppress ground subsidence of ground surface at the time of construction of underground structure such as a crossing structure under road-railway without using a chemical grouting method.
      SOLUTION: In a construction of underground structure such as a crossing structure under road-railway, an burial process of tabular member for burying a tabular member 530 along with both sides of top face of the underground structure which forms a space under the ground for construction and facing to the ground surface. By burying the tabular member 530, ground subsidence of the ground surface is prevented by suppressing collapse of peripheral ground, for example, at the time of construction of a pipe roof method as an auxiliary method.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:在不使用化学灌浆方法的情况下,在道路铁路上的交叉结构等地下结构施工时,抑制地面的地面沉降。 解决方案:在道路铁路下的交叉结构等地下结构的构造中,将板状构件530与地下结构的顶面的两侧一起埋设的平板状构件的埋藏过程,其形成下面的空间 地面施工,面向地面。 通过掩埋板状构件530,例如在作为辅助方法构成管道屋顶方法时,通过抑制外围地面的塌陷来防止地面的地面沉降。 版权所有(C)2010,JPO&INPIT
    • 6. 发明专利
    • Structure of underground structure
    • 地下结构的结构
    • JP2012107504A
    • 2012-06-07
    • JP2012039919
    • 2012-02-27
    • Fujita Corp株式会社フジタ
    • YOSHIKAWA KAZUYUKI
    • E21D9/04
    • PROBLEM TO BE SOLVED: To suppress ground subsidence on a ground surface side during construction of an underground structure such as an under-road/under-track crossing structure, without use of a chemical feeding method.SOLUTION: In a structure of an underground structure such as an under-road/under-track crossing structure, opposed plate-like members 530 are buried toward a ground surface side along both lateral sides on the top surface side of the underground structure that forms space in the ground; a pipe roof 520 is provided between the opposed plate-like members 530; and an upper end side of the plate-like member 530 positioned on the ground surface side goes over the pipe roof 520 so as to be elongated to a section between the pipe roof 520 and the ground surface.
    • 要解决的问题:在施工地下结构如道路下/轨道下交叉结构的情况下,抑制地表侧的地面沉降,而不使用化学进料方法。 解决方案:在地下结构如下路/下轨道交叉结构的结构中,相对的板状构件530沿着地下表面的两侧的两侧侧面向地面侧埋设 在地面上形成空间的结构; 在相对的板状构件530之间设置管顶520; 并且位于地面侧的板状构件530的上端侧越过管顶520,以便延伸到管顶520与地面之间的部分。 版权所有(C)2012,JPO&INPIT