会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • Concrete structure and joining method of concrete structure
    • 混凝土结构混凝土结构与接合方法
    • JP2008248648A
    • 2008-10-16
    • JP2007094084
    • 2007-03-30
    • Railway Technical Res Inst財団法人鉄道総合技術研究所
    • TAKAHASHI TAKAKURASEKINE ETSUO
    • E01B3/40E01B1/00E01B7/22E01B37/00E01D19/02
    • PROBLEM TO BE SOLVED: To provide a concrete structure and a joining method of a concrete structure, which enables a plurality of precast concrete members to be easily connected to one another.
      SOLUTION: Two precast panels 3 constituting the concrete structure 1 have a concavity 9 on the top surface 7, and a sheath conduit 15 is horizontally provided between the vertical surface 8 of the concavity 9 and the side 4 of the precast panel 3. In order to construct the concrete structure 1, first, the precast panel 3a is arranged in a predetermined position. A PC steel bar 11 is inserted to the sheath conduit 15 provided in the precast panel 3a, and a nut 13 is provided to the end of the PC steel bar 11 positioned in the concavity 9. Then the precast panel 3b is arranged while the PC steel bar 11 projected from the precast panel 3a is inserted to the sheath conduit 15. After the precast panel 3b has been arranged, the nut 13 is provided to the end of the PC steel bar 11 which is positioned in the concavity 9 of the precast panel 3b, and the PC steel bar 11 is fixed to the precast panel 3.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种混凝土结构的混凝土结构和接合方法,其能够使多个预制混凝土构件彼此容易地连接。 解决方案:构成混凝土结构1的两个预制板3在顶面7上具有凹部9,并且在凹部9的垂直表面8和预制板3的侧面4之间水平地设置护套导管15 为了构成混凝土结构体1,首先将预制面板3a配置在预定位置。 将PC钢棒11插入到设在预制面板3a中的护套导管15中,并且在位于凹部9的PC钢棒11的端部设置有螺母13.然后,预制板3b配置在PC 从预制板3a突出的钢筋11被插入到鞘导管15中。在预制板3b已经布置之后,螺母13设置在PC钢棒11的位于预制件的凹部9中的端部 面板3b,PC钢棒11固定在预制面板3上。版权所有(C)2009,JPO&INPIT
    • 6. 发明专利
    • Countermeasure method against freezing damage to concrete slab track and concrete slab track
    • 防止冷冻混凝土混凝土跟踪和混凝土沥青路面的对策措施
    • JP2013199807A
    • 2013-10-03
    • JP2012069849
    • 2012-03-26
    • Railway Technical Research Institute公益財団法人鉄道総合技術研究所
    • TAKAHASHI TAKAKURAFUCHIGAMI SHOTAMURAMOTO KATSUMI
    • E01B1/00E01B19/00E01B37/00
    • Y02A30/38
    • PROBLEM TO BE SOLVED: To provide a countermeasure method and the like against freezing damage to a concrete slab track, capable of suppressing deterioration of a padding layer of a concrete slab track due to freezing damage.SOLUTION: A concrete slab track 1 comprises: a track concrete slab 5; a CA mortar 7, which is a padding layer underneath the track concrete slab 5; and a concrete track bed 3 underneath the CA mortar 7. A part of or all of a deteriorated part 7a, which is an end part of the CA mortar 7 in a track width direction and is deteriorated by freezing damage, is removed, and an adiabatic material 8a is disposed on the outside of the remaining end part. An adiabatic material 8b is disposed on the CA mortar 7 in a gap 16 between the end parts of the track concrete slabs 5, which are adjacent to each other in a track direction. The adiabatic materials 8a and 8b suppress temperature change of the CA mortar 7 due to diurnal variation of ambient temperature, and suppress deterioration due to freezing damage or the progress of the deterioration.
    • 要解决的问题:提供一种对混凝土板坯轨道的冻结破坏的对策方法等,能够抑制由于冻结破坏引起的混凝土板坯轨道的衬垫层的劣化。解决方案:混凝土板坯轨道1包括: 轨道混凝土板5; CA砂浆7,其是轨道混凝土板5下面的填充层; 以及CA砂浆7下面的混凝土轨道床3。作为CA砂浆7的轨道宽度方向的端部的劣化部7a的一部分或全部被去除,并且被冷冻损坏退化,并且 绝热材料8a设置在剩余端部的外侧。 绝热材料8b在轨道方向上彼此相邻的轨道混凝土板5的端部之间的间隙16中设置在CA砂浆7上。 绝热材料8a和8b由于环境温度的日变化而抑制CA砂浆7的温度变化,并且抑制由于冻结损坏或劣化进行引起的劣化。
    • 7. 发明专利
    • Reinforcement method of slab track and projection replacement structure
    • SLAB跟踪和投影替代结构的加固方法
    • JP2013036303A
    • 2013-02-21
    • JP2011175733
    • 2011-08-11
    • Railway Technical Research Institute公益財団法人鉄道総合技術研究所
    • TAKAHASHI TAKAKURAFUCHIGAMI SHOTASEKINE ETSUO
    • E01B37/00E01B1/00
    • PROBLEM TO BE SOLVED: To provide a reinforcement method of a slab track capable of easily reinforcing the slab track when repair and reinforcement of projections are needed in the slab track or the like, and a projection replacement structure.SOLUTION: A hole 15 which passes through a track slab 5 and CA mortar 7 and reaches a prescribed depth of a concrete ballast 3 is perforated and formed from an upper surface 21 of the track slab 5. Then, a reinforcing bar 29 is inserted into the hole 15. Thereafter, a cement-based filler 27 is filled around the reinforcing bar 29 at a height position corresponding to the concrete ballast 3, and a lower end of the reinforcing bar 29 is fixed to the concrete ballast 3. Further, a resin-based filler 25 is filled around the reinforcing bar 29 at a height position corresponding to the track slab 5 and the CA mortar 7, and a projection replacement structure 13 is formed.
    • 要解决的问题:提供一种能够在板坯轨道等中需要突起的修补和加强时能够容易地加强板坯轨道的板坯轨道的加强方法以及投影替换结构。 解决方案:穿过轨道板5和CA砂浆7并到达混凝土压载物3的规定深度的孔15由轨道板5的上表面21穿孔并形成。然后,钢筋29 此后,在对应于混凝土压载物3的高度位置处,在钢筋29周围填充水泥基填料27,将钢筋29的下端固定在混凝土压载物3上。 此外,在对应于轨道板5和CA砂浆7的高度位置处,在钢筋29周围填充树脂系填料25,形成投影置换结构体13。 版权所有(C)2013,JPO&INPIT
    • 8. 发明专利
    • Restraining structure for track slab, restraining tool and method for forming restraining structure of track slab
    • 履带板的限制结构,限制工具和形成履带结构的方法
    • JP2014005604A
    • 2014-01-16
    • JP2012140012
    • 2012-06-21
    • Railway Technical Research Institute公益財団法人鉄道総合技術研究所
    • TAKAHASHI TAKAKURAFUCHIGAMI SHOTAMURAMOTO KATSUMI
    • E01B37/00
    • PROBLEM TO BE SOLVED: To provide the restraining structure of a track slab capable of easily restraining the horizontal movement of the track slab, and avoiding the possibility of the damage of the track slab itself.SOLUTION: A restraining tool 1 includes: a side member 3; a protruding member 5 protruding from the side member 3; a top member 7 and a bottom member 9 respectively disposed at the upper end and lower end of the side member 3 and the protruding member 5; a fixing section 11 and an auxiliary material 13 or the like. The restraining tool 1 is fixed to a concrete ballast 17 by inserting the protruding member 5 into a gap 21 between track slabs 19, and disposing the bottom member 9 so as to follow a lower face 37 of the track slab 19, and putting an anchor bolt 15 through the fixing section 11. Then, elastic materials 27 are disposed between the side member 3 and a side face 25 of the track slab 19, between the protruding member 5 and an end face 23 of the track slab 19, and between the top member 7 and an upper face 35 of the track slab 19 to form a restraining structure 33 of the track slab 19.
    • 要解决的问题:提供能够容易地限制轨道板的水平运动的轨道板的限制结构,并且避免轨道板本身的损坏的可能性。解决方案:约束工具1包括:侧构件 3; 从侧构件3突出的突出构件5; 分别设置在侧构件3和突出构件5的上端和下端的顶部构件7和底部构件9; 固定部11和辅助材料13等。 通过将突出部件5插入到轨道板19之间的间隙21中,将约束工具1固定到混凝土压载物17,并且设置底部构件9以跟随轨道板19的下表面37,并且将锚 螺栓15穿过固定部分11.然后,弹性材料27设置在侧部件3和轨道板19的侧面25之间,在突出部件5和轨道板坯19的端面23之间以及 顶部构件7和轨道板19的上表面35,以形成轨道板19的约束结构33。