    • 3. 发明专利
    • Method of joining steel column and precast pile
    • 钢管和预制桩的加工方法
    • JP2007255006A
    • 2007-10-04
    • JP2006078955
    • 2006-03-22
    • Maeda CorpToyo Constr Co LtdZenitaka Corp前田建設工業株式会社東洋建設株式会社株式会社錢高組
    • KONNO OSAMUYAMASHITA SHUNEINARUSE TADASHIFUJISHIMA TAISUKEMINE CHIKAHITOIGARASHI HARUTOITO HITOSHIAOKI MASAYAMAZAKI TORU
    • E02D27/12E02D27/00E04B1/24
    • PROBLEM TO BE SOLVED: To provide a method of joining a steel column and a precast pile shortening a construction period and reducing cost by dispensing with a base plate, an anchor frame, or the like unlike a conventional method and absorbing a construction error of the precast pile in a reliable manner to improve work efficiency.
      SOLUTION: In the method of joining the steel column and the precast pile, an erection frame comprising vertical frames, a lower frame and an upper frame is installed in a predetermined horizontal position of the upper end of the precast pile. A plurality of first main reinforcements and a plurality of second main reinforcements shorter than the first main reinforcements are fixed to the upper end of the precast pile, and after winding hoops, concrete is placed to the lower part of the upper frame. After erecting the steel column to be inserted in the erection frame, third main reinforcements are joined to the second main reinforcements, and the hoops are wound. Concrete is then placed above the upper frame.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种连接钢柱和预制桩,缩短施工周期并且通过分配基板,锚架等而不同于常规方法并且吸收结构来降低成本 预制桩的误差可靠,提高工作效率。 解决方案:在连接钢柱和预制桩的方法中,将包括垂直框架,下框架和上框架的竖立框架安装在预制桩上端的预定水平位置。 多个第一主加强件和比第一主加固件短的多个第二主加固件固定到预制桩的上端,并且在缠绕箍之后,将混凝土放置在上框架的下部。 在竖立架设框架后的钢柱后,将第三主加强件连接到第二主加强件上,并将环箍缠绕。 然后将混凝土放置在上框架的上方。 版权所有(C)2008,JPO&INPIT
    • 5. 发明专利
    • Seismic strengthening structure of existing building
    • 地震加强现有建筑结构
    • JP2013189802A
    • 2013-09-26
    • JP2012056639
    • 2012-03-14
    • Maeda Corp前田建設工業株式会社
    • NARUSE TADASHIKONNO OSAMU
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a seismic strengthening structure of an existing building, which enables earthquake-resistant strength to be sufficiently secured even in the existing building having stories with higher floor height.SOLUTION: A reinforcing rigid frame 2 having a plurality of reinforcing columns 3 and 6 and reinforcing beams 4, 5 and 7 for connecting the reinforcing columns 3 and 6 together is connected to an existing building 1 in such a manner that the reinforcing columns 3 and 6 and the reinforcing beams 4, 5 and 7 overlap columns and beams, which configure one plane of structure of the existing building 1, in a view from before the plane of structure. An intermediate reinforcing beam 10 is erected in an approximately central section of floor height between the reinforcing columns 3 and 3 of the reinforcing rigid frame 2. Thus, earthquake-resistant strength can be sufficiently secured even in the existing building 1 having stories with higher floor height.
    • 要解决的问题:提供现有建筑物的抗震结构,即使在具有较高楼层高度的故事的现有建筑物中也能够充分确保抗震强度。解决方案:具有多个加强件的加强刚性框架2 列3和6以及用于将加强柱3和6连接在一起的加强梁4,5和7以加强柱3和6以及加强梁4,5和7重叠的方式连接到现有建筑物1 以及从结构平面之前的视图中构成现有建筑物1的一个结构平面的梁。 中间加强梁10竖立在加强刚性框架2的加强柱3和3之间的地板高度的大致中央部分。因此,即使在具有较高楼层的故事的现有建筑物1中也可以充分确保抗震强度 高度。
    • 6. 发明专利
    • Curing sheet for concrete
    • 混凝土固化片
    • JP2003343086A
    • 2003-12-03
    • JP2002152224
    • 2002-05-27
    • Maeda Corp前田建設工業株式会社
    • KONNO OSAMUYAMAMOTO KENICHIRO
    • E04G21/02C04B40/04
    • PROBLEM TO BE SOLVED: To provide a curing sheet for concrete, which enables bleeding water generated from the concrete to be eliminated in a short period of time, can prevent poor quality and the appearance of a crack from being caused by drying during the curing of the concrete, and can suppress an increase in cost.
      SOLUTION: This curing sheet 1 is constituted by laminating a permeable sheet member 11 through which moisture can permeate, a water absorbing sheet member 12 which can absorb and retain the moisture, and a high-strength sheet member 13 with high strength, in this order. The curing sheet 1 is laid, for example, all over the concrete surface of a slab, so that the bleeding water, which is generated from the concrete, can be absorbed for elimination in a short period of time.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了提供一种能够在短时间内消除由混凝土产生的渗出水的混凝土固化片,可以防止由于干燥而导致的质量差和裂纹的出现 混凝土的固化,可以抑制成本的增加。 解决方案:该固化片1是通过层叠渗透片材11,水分可渗透的片材构件11,能够吸收和保持水分的吸水片材12,以及高强度的高强度片材13, 按此顺序 固化片1例如铺设在板坯的整个混凝土表面上,使得从混凝土产生的渗水可以在短时间内被吸收消除。 版权所有(C)2004,JPO
    • 7. 发明专利
    • Construction method of steel frame reinforced concrete column
    • 钢筋混凝土柱的施工方法
    • JP2005351078A
    • 2005-12-22
    • JP2005222912
    • 2005-08-01
    • Maeda Corp前田建設工業株式会社
    • YAMAMOTO KENICHIROKONNO OSAMUIMAIZUMI TAKAYUKI
    • E04C3/34E04C5/18
    • PROBLEM TO BE SOLVED: To provide a construction method of a steel frame reinforced concrete column endurable against a use under a high axial force by largely improving buckling strength.
      SOLUTION: This construction method of the steel frame reinforced concrete column for containing a steel frame having a flange 6 and a reinforcement arranged on its periphery includes a process of arranging a U-shaped reinforcing bar 5 so as to surround the flange 6 in the close vicinity of the flange of the steel frame by arranging webs 1 and 2 of the steel frame so as to be positioned at the center of its overlapping part, by overlapping the mutual U-shaped reinforcing bars in an non-joining state by inserting the U-shaped reinforcing bar 5 into a hole 4 even from the opposite side, by inserting the U-shaped reinforcing bar 5 molded in a U shape into the hole 4, and by forming the holes 4 in the webs 1 and 2 of the steel frame.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种钢框架钢筋混凝土柱的施工方法,其通过大大提高抗弯强度来抵抗在高轴向力下的使用。 解决方案:用于容纳具有凸缘6和布置在其周边上的加强件的钢框架的钢框架钢筋混凝土柱的施工方法包括将U形钢筋5布置成围绕凸缘6的工艺 通过将钢框架的腹板1和2布置成位于其重叠部分的中心处,通过将非互连状态的相互的U形钢筋重叠在一起,在钢框架的凸缘的附近 通过将模制成U形的U形钢筋5插入到孔4中,并且通过在腹板1和2中形成孔4,将U形钢筋5甚至从相对侧插入孔4中 钢框架。 版权所有(C)2006,JPO&NCIPI