会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明专利
    • Construction management method of landfills
    • JP4413420B2
    • 2010-02-10
    • JP2000398761
    • 2000-12-27
    • 東亜建設工業株式会社
    • 剛 上奥嘉彦 保坂稔 増田弘 平林光夫 植木健 深沢秀忠 行木
    • E02B3/18
    • Y02A10/21
    • PROBLEM TO BE SOLVED: To provide a work execution control method for reclaimed land, capable of calculating soil constant of the original ground from relation between surcharge to the water bottom surface in the material delivering area for reclaiming sediment and the settlement at the water bottom surface position. SOLUTION: Weight of sediment loaded from a borrow pits, where the specific gravity of soil particles was measured, volume and water content are measured, the ground height is surveyed at respective material delivering area immdiately before and after delivering sediment for each delivering work, the difference between the value obtained immediately after delivering material and the value obtained immediately prior is used as the volume of sediment delivered, a saturated bulk density in water is calculated from the specific gravity of soil particle measured at borrow pits, and weight, volume and water ratio of the sediment, when the sediment is loaded to a barge, the surcharge is calculated for each delivering work, its accumulative totals are indicated together with the accumulative totals in the past for each sediment delivering work, and the difference between the value obtained immediately prior to delivering work and the value obtained immediately after the preceding delivering work is indicated as the settlement of the accumulative totals for each sediment delivering work together with the accumulative totals in the past.