会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Control apparatus of the absorption-type air-conditioning system
    • JP3728121B2
    • 2005-12-21
    • JP36367798
    • 1998-12-22
    • リンナイ株式会社大阪瓦斯株式会社
    • 紀夫 上殿寿洋 佐藤
    • F25B15/00
    • Y02A30/277Y02B30/62Y02B30/745
    • PROBLEM TO BE SOLVED: To prevent a cold/warm water flow passage from being frozen upon interruption of an absorption air conditioning apparatus. SOLUTION: An absorption air conditioning apparatus is adapted such that there are connected through a cold/warm water flow passage 46 having a cold/warm water pump P3 an absorption heat source machine where cooling operation is achieved with an absorption cycle composed of a regenerator, a condenser, an evaporator, an absorber, and an absorption pump, and a heated absorption solution is supplied from the regenerator to the evaporator through a heating absorption solution flow passage by opening a cold/hot changeover valve upon heating operation and an air conditioning heat exchanger 44 of an indoor machine RU. In the apparatus, when fresh air temperature is less than 3 deg.C, the number of revolutions of the cold/warm water pump is controlled more greatly as the number of the machines are more increased in response to the presence and the number of floor heating panels connected with an outdoor machine 100. In contrast, when no floor heating panel is connected, the revolutions are controlled more greatly in response to the number of indoor machines RU. When the floor heating panel is connected, cold/warm water is securely circulated at high revolutions for freezing prevention, while only the indoor machine RU is connected, noise is restricted.
    • 4. 发明专利
    • Control apparatus of the absorption-type air-conditioning system
    • JP3920979B2
    • 2007-05-30
    • JP1543298
    • 1998-01-28
    • リンナイ株式会社大阪瓦斯株式会社
    • 紀夫 上殿克也 大島
    • F24F11/02F25B15/00
    • Y02A30/277Y02B30/62
    • PROBLEM TO BE SOLVED: To positively maintain an operation when switching from a heating operation to a cooling operation. SOLUTION: Since a refrigerant liquid is stored at a refrigerant liquid storage part 53 on cooling operation, the concentration of an absorption liquid being supplied from absorbing equipment 3 to a high-temperature reproducer 1 increases. A cooling/heating switching valve 6 is opened on heating operation, thus supplying the absorption liquid from the high- temperature reproducer 1 into an evaporator 4. When the cooling operation is started, it is discriminated whether the last operation was a heating operation or not, the speed of an absorption liquid pump P1 is controlled to a normal control speed according to the absorption liquid temperature in the high-temperature reproducer 1 in the case of the cooling operation, and the speed of the absorption liquid pump P1 is controlled to an increment control speed that is obtained by increasing the normal control speed by a specific speed in the case of the heating operation. After the heating operation, the concentration of the absorption liquid in the high-temperature reproducer l decreases after the heating operation, and pressure increases for an absorption liquid temperature in the high-temperature reproducer 1 but the speed of the absorption liquid pump P1 increases, thus positively supplying the absorption liquid into the high-temperature reproducer 1.