会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Water drain structure of dew condensation water on glass wall
    • 玻璃墙上的DEW冷凝水的水排水结构
    • JP2005113378A
    • 2005-04-28
    • JP2003344790
    • 2003-10-02
    • Takechi Kogyo Gomu Co LtdYamaki Kogyo Kkタケチ工業ゴム株式会社ヤマキ工業株式会社
    • OKUBO KOICHITAKECHI YOSHIKA
    • E04B1/64E04B2/88E06B3/62E06B7/14
    • PROBLEM TO BE SOLVED: To satisfactorily drain dew condensation water on a glass wall which becomes an exterior wall of a building by effectively utilizing a gasket sealing between glass plates to be connected in a watertight manner and simplifying a configuration.
      SOLUTION: An abutting seal face 3 is formed on an outer face of the gasket 2 for watertight sealing provided along an end fringe of the glass 1, and a channel 4 is formed over the whole length of the gasket 2 on the abutting seal face 3. The abutting seal faces 3, 3 of the gaskets 2, 2 between the glasses 1 and 1 to be connected are brought into pressure-contact, and a water drain channel 5 is formed in the opposing channels 4, 4. An introduction passage 6 passing through from an indoor face of the gasket 2 on one side to the water drain channel 5 to introduce dew condensation water on an indoor face side of the glass 1 is formed. A water drain means 7 for draining dew condensation water introduced into the water drain channel 5 to the outside is communicated with the water drain channel 5.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过有效利用要以水密方式连接的玻璃板之间的密封垫密封并简化构造,将结露水排出成为建筑物外壁的玻璃壁上。 解决方案:在沿着玻璃1的端缘设置的水密密封垫圈2的外表面上形成邻接的密封面3,并且在邻接的垫圈2的整个长度上形成有通道4 将要连接的眼镜1和1之间的垫圈2,2的邻接密封面3,3进行压力接触,并且在相对的通道4,4中形成排水通道5。 导入通道6从一侧的垫圈2的室内面通过排水通道5,以在玻璃1的室内面侧引入结露水。 将排水通道5内的结露水排出到外部的排水装置7与排水通道5连通。(C)2005,JPO&NCIPI
    • 6. 发明专利
    • Expansion of building
    • 扩建建筑
    • JP2003313960A
    • 2003-11-06
    • JP2002125420
    • 2002-04-26
    • Norimitsu SukejimaTakechi Kogyo Gomu Co Ltdタケチ工業ゴム株式会社典光 祐島
    • SUKEJIMA NORIMITSUOTSUKA TORUISHIBASHI TAKANORI
    • E04B1/62
    • PROBLEM TO BE SOLVED: To provide an expansion of a building provided between buildings producing respectively separate swings and having a cut off function and an expansion/contraction function and hardly generating an incongruous feeling against a finishing member of the building. SOLUTION: The expansion of a building is provided with a rubber expansion body 1 expansible/contractible because of a bellows structure, a plurality of mounting parts 3 provided on at least one side face, a plurality of decoration boards 2 mounted to the body 1 through the mounting parts 3. The decoration board 2 covers substantially the whole one face of the body 1 and is respectively divided in the expansible direction of the body 1. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了提供在建筑物之间提供的建筑物的扩展,分别产生分开的摆动并具有切断功能和伸缩功能,并且几乎不产生对建筑物的整理构件的不协调的感觉。 解决方案:建筑物的膨胀设置有橡胶膨胀体1,其由于波纹管结构而可膨胀/收缩,多个安装部3设置在至少一个侧面上,多个装饰板2安装到 主体1通过安装部分3.装饰板2基本上覆盖主体1的整个一个面,并且分别在主体1的可扩展方向上分开。版权所有(C)2004,JPO
    • 8. 发明专利
    • Construction zipper gasket and mounting structure of plate
    • 建筑拉链垫片和板的安装结构
    • JP2005299179A
    • 2005-10-27
    • JP2004115652
    • 2004-04-09
    • Takechi Kogyo Gomu Co LtdTakenaka Komuten Co Ltdタケチ工業ゴム株式会社株式会社竹中工務店
    • HISABAYASHI MASAHARUMIZUNO YOSHIKISUGA JUNJIITO HIROKIHIROSHIMA MASAAKIUEMURA YUKIOSHIBATA YASUYUKIOTSUKA TORUIKEDA HIROSHIYAMASHITA SHUNICHI
    • E04B2/56
    • PROBLEM TO BE SOLVED: To provide a construction zipper gasket capable of increasing cut-off performance while satisfying the request in terms of a design of a skeleton window section by approaching a plate to the outside end face of a concrete section as near as possible.
      SOLUTION: A first anchor section 80 and a second anchor section 81 are projected from a rubber body 5 in an approximately parallel with each other and to positions separated in the direction of the thickness of plate glass 1. These anchor sections 80 and 81 are fitted to first and second mounting grooves 70 and 71 provided to the concrete section 6 to fix the rubber body 5 to the concrete section 6. A plate fitted groove 2 is provided to a slightly separated position to the second anchor section 81 side, the end of the plate glass 1 is fitted into the plate fitted groove 2 and, at the same time, a zipper 3 is fitted into a zipper groove 4 to push a part in the vicinity of the plate fitted groove 2 to the side of the plate glass 1.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够提高切断性能的结构拉链垫圈,同时通过将板材接近混凝土部分的外端面来满足关于骨架窗部分的设计的要求,使其接近 尽可能。 解决方案:第一锚固部分80和第二锚固部分81从橡胶本体5以大致平行的方式突出并且在平板玻璃1的厚度方向上分离的位置。这些锚固部分80和 81装配到设置在混凝土部分6上的第一和第二安装槽70和71,以将橡胶体5固定到混凝土部分6.板装配槽2设置到与第二锚固部分81侧稍微分离的位置, 平板玻璃1的端部装配到板装配槽2中,并且同时将拉链3装配到拉链槽4中,以将板装配槽2附近的部分推压到 平板玻璃1.版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • Structure for mounting solar cell panel
    • 安装太阳能电池板的结构
    • JP2005277260A
    • 2005-10-06
    • JP2004091242
    • 2004-03-26
    • Sharp CorpTakechi Kogyo Gomu Co Ltdシャープ株式会社タケチ工業ゴム株式会社
    • FURIKADO TSUTOMUSUZUKI YUUJI
    • H01L31/042
    • F24J2/5211Y02E10/47
    • PROBLEM TO BE SOLVED: To provide a structure for mounting solar cell panel which has improved sealing and supporting performances. SOLUTION: The solar cell panel mounting structure comprises a solar cell panel 3, having a multiplicity of raised and recessed portions on a surface 30f of an edge 30, a frame member 22 having a groove 29, and a gasket 1 inserted between the edge 30 of the solar cell panel 3 and the groove 29 of the frame member 2 for sealing between the solar cell panel 3 and the frame member 2 and also fixing the solar cell panel 3 to the frame member 3. The gasket 1 has a gasket body 10, mounted along the inner surface forming the groove of the frame member, and a first contact part 11 provided on the inside of the gasket main body 10. The gasket body 10 and the first contact part 11 have a nearly uniform transversal section and is integrally molded. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种具有改进的密封和支撑性能的太阳能电池板的安装结构。 太阳能电池面板安装结构包括太阳能电池板3,其在边缘30的表面30f上具有多个凸起和凹入部分,具有凹槽29的框架构件22和插入在第二区域30之间的垫圈1 太阳能电池板3的边缘30和框架构件2的槽29,用于密封太阳能电池板3和框架构件2,并且还将太阳能电池板3固定到框架构件3.垫圈1具有 衬垫体10,其沿着形成框架构件的槽的内表面安装,以及设置在衬垫主体10的内部的第一接触部11.垫片主体10和第一接触部11具有几乎均匀的横截面 并整体模制。 版权所有(C)2006,JPO&NCIPI