会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 42. 发明专利
    • Friction pile
    • 摩擦片
    • JP2009114846A
    • 2009-05-28
    • JP2008266024
    • 2008-10-15
    • Jfe Steel CorpJfeスチール株式会社
    • WAKIYA HIROSHIUSAMI SHUNSUKEKONO KENJITACHIKA HISAKAZU
    • E02D5/24E02D5/46E02D5/50
    • PROBLEM TO BE SOLVED: To form a protrusion with specifications, expressing great adhesion from a stage of small displacement, on a surface of a prefabricated pile penetrating a columnar body of soil cement.
      SOLUTION: This friction pile penetrates as a core material into the central portion of the columnar body of the soil cement, which is formed by excavating ground and agitating excavated sediment and cement milk, before the hardening of the columnar body. The plurality of linear protrusions 2 are vertically arranged on the prefabricated pile 1 with a small diameter of 300 mm or less.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了形成具有规格的突起,从小排量阶段表现出很大的粘附力,在穿过土体水泥的柱状体的预制桩的表面上。 解决方案:这种摩擦桩作为核心材料渗入土体水泥柱状体的中心部分,这是在柱状体硬化之前通过挖掘地面和搅拌挖掘的泥沙和水泥浆形成的。 多个线状突起2垂直地配置在预制桩1上,小直径为300mm以下。 版权所有(C)2009,JPO&INPIT
    • 43. 发明专利
    • Friction pile
    • 摩擦片
    • JP2009114845A
    • 2009-05-28
    • JP2008266023
    • 2008-10-15
    • Jfe Steel CorpJfeスチール株式会社
    • WAKIYA HIROSHIUSAMI SHUNSUKEKONO KENJITACHIKA HISAKAZU
    • E02D5/54E02D5/28E02D5/56
    • PROBLEM TO BE SOLVED: To form an economical protrusion, appropriate to a frictional force between ground and a columnar body, on a surface of a prefabricated pile penetrating the columnar body of soil cement. SOLUTION: A ratio between a space (s) between the protrusions of the friction pile, where the linear protrusions are provided on the surface of the prefabricated pile, and its height (h) is set at a predetermined value or below. The predetermined value is determined so that relative displacement between the prefabricated pile and the soil cement in the action of a vertical load on the friction load can be set at not more than a value obtained by subtracting the relative displacement between the soil cement and the ground from an allowance of displacement of a whole including the columnar body. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了形成适合于地面和柱状体之间的摩擦力的经济的突起,在穿过土壤水泥的柱状体的预制桩的表面上。 解决方案:在预制桩的表面上设置线性凸起的摩擦桩的突起与其高度(h)之间的空间之间的比率被设定为预定值或更低。 确定预定值,使得在垂直负载对摩擦载荷作用下,预制桩和土壤水泥之间的相对位移可以设定为不超过土壤水泥和地面之间的相对位移所获得的值 从包括柱状体的整体的位移津贴。 版权所有(C)2009,JPO&INPIT