    • 32. 发明专利
    • Pile design system
    • 桩设计系统
    • JP2006161363A
    • 2006-06-22
    • JP2004352960
    • 2004-12-06
    • Shimizu CorpSumitomo Metal Ind Ltd住友金属工業株式会社清水建設株式会社
    • OTSUKI AKIRAISODA KAZUHIKONAKANISHI KEIJITANAKA HIROMASAKOBAYASHI YOICHIKURIO YUKIHIRO
    • E02D27/12E02D5/30E02D27/34
    • PROBLEM TO BE SOLVED: To construct a pile design system automating pile design work by a deformation-orientation type design method to considerably shorten design work of a pile foundation.
      SOLUTION: When load data, pile data and ground data are input in a first data input part 1, a first analytic model forming part 4 forms the linear ground and a pile model, and a first evaluation part 6 carries out a static analysis on the linear ground and the pile model to evaluate a pile against medium and small earthquakes. The result is output from a first output part 8. In succession, a second analytic model forming part 5 forms the nonlinear ground and a pile model, and a second evaluation part 7 carries out a static incremental analysis to seismic load on the nonlinear ground and pile model to evaluate the ultimate yield strength and the amount of deformation of the pile. The result is output from a second output part 9.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:通过变形取向型设计方法构建桩设计系统自动化桩设计工作,大大缩短桩基设计工作。

      解决方案:当第一数据输入部分1输入负载数据,桩数据和地面数据时,第一分析模型形成部分4形成线性地面和桩模型,第一评估部分6执行静态 对线性地面和桩模型进行分析,以评估中等和小型地震的桩。 结果是从第一输出部分8输出。接下来,第二分析模型形成部分5形成非线性地面和桩模型,第二评估部分7对非线性地面上的地震荷载进行静态增量分析, 桩模型来评估桩的极限屈服强度和变形量。 结果是从第二个输出部分9输出。版权所有(C)2006,JPO&NCIPI

    • 33. 发明专利
    • Joining structure of pile head part and its construction method
    • 桩头接合结构及其施工方法
    • JP2006045778A
    • 2006-02-16
    • JP2004223988
    • 2004-07-30
    • Shimizu CorpSumitomo Metal Ind Ltd住友金属工業株式会社清水建設株式会社
    • ISODA KAZUHIKOOTSUKI AKIRATANAKA HIROMASAKOBAYASHI YOICHI
    • E02D27/12E02D5/34
    • PROBLEM TO BE SOLVED: To provide a joining structure of a pile head part and its construction method, for shortening a construction period, and reducing cost, while improving work efficiency and quality.
      SOLUTION: A diametrally expanded member 3 is composed of an outer steel pipe 4 of a square shape in a plan view for surrounding the pile head part 2, an upper stiffener 5 and a lower stiffener 6 respectively arranged on an upper end surface and a lower end surface of clearance so as to block up the clearance between the outer steel pipe 4 and the pile head part 2; and is placed on a ring member 8 of a ring shape annularly installed in the pile head part 2; and the upper stiffener 5 is welded to the pile head part 2. A plurality of anchor reinforcements 7, etc. embedded in a foundation beam 11 are welded at a predetermined interval to an upper outer peripheral surface of the outer steel pipe 4. While, a filler 10 is filled in the clearance between the outer steel pipe 4 and the pile head part 2.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种桩头部分的接合结构及其施工方法,以缩短施工周期,降低成本,同时提高工作效率和质量。 解决方案:直径膨胀构件3由围绕桩头部2的平面图中的正方形的外侧钢管4,分别设置在上端面上的上部加强件5和下部加强件6构成 和下端面的间隙,以阻挡外钢管4和绒头头部2之间的间隙; 放置在环状安装在桩头部2的环状的环状部件8上; 并且将上加强件5焊接到桩头部2.将嵌入基础梁11中的多个锚固加强件7等以预定间隔焊接到外钢管4的上外周表面。 填料10填充在外钢管4和桩头部2之间的间隙中。版权所有(C)2006,JPO&NCIPI
    • 34. 发明专利
    • Connection structure of pipe pile head, and method of constructing pipe pile head
    • 管桩头的连接结构,以及管道桩头的构造方法
    • JP2005139731A
    • 2005-06-02
    • JP2003377331
    • 2003-11-06
    • Shimizu CorpSumitomo Metal Ind Ltd住友金属工業株式会社清水建設株式会社
    • KOBAYASHI YOICHITANAKA HIROMASAOTSUKI AKIRAISODA KAZUHIKO
    • E02D5/34E02D27/12
    • PROBLEM TO BE SOLVED: To provide a connection structure of a pipe pile head, which has a stable and high bending bearing force imparted thereto, and contributes to reduction of production costs of an outer steel pipe.
      SOLUTION: According to the connection structure of the pipe pile head, a concrete-filled pipe pile 1 is driven into the ground, and the outer steel pipe 2 having anchoring reinforcements 4 fixed thereto is arranged on the periphery of the head, followed by placing concrete in a gap between the outer steel pipe 2 and the concrete-filled pipe pile 1, and at least an upper peripheral area of the outer steel pipe 2, to thereby connect the concrete-filled pipe pile 1 and a foundation beam 6 together. In the connection structure, an anchoring member 3 is arranged at a lower edge of the outer steel pipe 2 in a manner protruding inward.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种具有稳定的高弯曲承受力的管桩头的连接结构,并且有助于降低外部钢管的生产成本。

      解决方案:根据管桩头的连接结构,将混凝土填充的管桩1驱动到地面中,将固定有锚固加强件4的外钢管2布置在头部的周边上, 随后将混凝土置于外钢管2和混凝土填充管桩1之间的间隙中,以及至少外钢管2的上周区域,从而连接混凝土填充管桩1和基础梁 6在一起 在连接结构中,锚定构件3以向内突出的方式布置在外钢管2的下边缘处。 版权所有(C)2005,JPO&NCIPI

    • 36. 发明专利
    • BURIED STEEL PIPE PILE
    • JP2004011171A
    • 2004-01-15
    • JP2002162771
    • 2002-06-04
    • SHIMIZU CONSTRUCTION CO LTDSUMITOMO METAL IND
    • ISODA KAZUHIKOKOBAYASHI YOICHI
    • E02D5/56
    • PROBLEM TO BE SOLVED: To provide an environmentally-friendly buried steel pipe pile at a low cost. SOLUTION: In this buried steel pipe pile 1, a pile body 2 is formed of a general part 3 consisting of a steel pipe, which is formed to have a constant sectional diameter; and a tip part 4 consisting of a steel pipe, which is tapered in a member longitudinal direction to have an upper end surface 4a having the same sectional diameter as the general part 3and a lower end surface 4b formed with a large diameter, compared with the upper end surface 4a. The lower end surface of the general part 3 is fixed to the upper end surface 4a of the tip part 4 through a fixing means. A wing part 5 is a doughnut-like disc larger in diameter than the lower end surface 4b of the tip part 4 of the pile body 2 and having a hole 5a having the same inside diameter as the general part 3 of the pile body 2 in the center, which is partially cut in the radial direction and molded in a spiral shape. The lower end surface 4b of the tip part 4 of the pile body 2 is also spirally cut, and one surface of the wing part 5 and the lower end surface 4b of the tip part 4 of the pile body 2 are mutually fixed in face to face through a fixing means such as welding to form the buried steel pipe pile 1. COPYRIGHT: (C)2004,JPO