会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 22. 发明专利
    • MEASURING METHOD OF AVERAGE FLOW VELOCITY WITHIN CONDUIT
    • JPH03108613A
    • 1991-05-08
    • JP24507689
    • 1989-09-22
    • JAPAN STEEL & TUBE CONSTR
    • MATSUO ATSUSHIIWASHITA FUMIHIKOIKEDA SHINTARO
    • G01F1/00G01F1/52
    • PURPOSE:To improve the measuring accuracy of an average flow velocity by obtaining an extra coefficient using a specific formula based on a hydraulic mean depth calculated from the depth of water and the diameter of a tube, equivalent roughness of the tube, mounting position of a sensor and the depth of water, and multiplying the obtained extra coefficient with the flow velocity. CONSTITUTION:A sensor 1 is placed at a fixed position (y) from the bottom of a tube 11 by a sensor holder 15. A flow velocity V at the position (y) is detected by a flow velocity sensor of the sensor 1. At the same time, a depth of water H to the surface of water 12 is measured by a level gauge. A cross sectional area A of the flowing water within the tube 11 and a peripheral length L of the tube 11 in contact with the flowing water are calculated from a diameter D of the tube 11 and the depth of water H, and a hydraulic mean depth R is calculated from the cross sectional area A and peripheral length L. Moreover, an extra coefficient alpha is calculated from an equivalent roughness Ks determined by the hydraulic mean depth R, depth of water H, position (y) and kind of the tube 11 with using a formula. The average flow velocity within the tube 11 can be obtained by multiplying the flow velocity V with the coefficient alpha.
    • 23. 发明专利
    • REPLACING CONSTRUCTION FOR ALREADY LAID PIPE
    • JPH0235286A
    • 1990-02-05
    • JP18284688
    • 1988-07-22
    • JAPAN STEEL & TUBE CONSTRKOKEN KOGYO KK
    • IWASHITA FUMIHIKOSATO KIMIOEGUCHI TAKUMI
    • E21D9/06F16L1/024
    • PURPOSE:To replace an already laid pipe to a newly constructed pipe from the ground surface by advancing a screw part having a cutting edge revolving rod into an already laid pipe and fitting a newly constructed pipe onto the periphery of the cutting edge revolving rod and breaking the already laid pipe by the cutting edge and advancing the newly constructed pipe at the same time. CONSTITUTION:The screw part 17a of an auger rod 17 is advanced into an already laid pipe 2 from a starting vertical hole 22, and when said screw part 17a reaches a prescribed position, a rod part 17b is connected. A cutting edge revolving rod 19 having a cutting edge 18 is fitted onto the outer periphery of the rod part 17b. A newly constructed pipe 3 is fitted onto the outer periphery of the cutting edge revolving rod 19 through a center holding tool 24, and the auger rod 17 and the cutting edge revolving rod 19 are revolved and advanced, and the already laid pipe 2 is broken by the cutting edge 18. At the same time, the newly constructed pipe 3 is advanced, and after the cutting edge 18 and the newly constructed pipe 3 reach a final vertical hole 23, the cutting edge 18, etc., are removed. Therefore, the gas pipes, etc., in the vicinity can be protected from being broken. Further, since the construction can be carried out through the dry method, the need of pumps, etc., is obviated, and the generation of muddy soil is prevented.
    • 26. 发明专利
    • CIVIL WORK METHOD OF UNDERGROUND PIPE
    • JPH02213537A
    • 1990-08-24
    • JP3265789
    • 1989-02-14
    • JAPAN STEEL & TUBE CONSTR
    • IWASHITA FUMIHIKOURAMOTO TOSHIAKISATO KIMIO
    • E03F3/06
    • PURPOSE:To shorten the periods of temporary restoring after temporary digging performed when an underground pipe is damaged, and real digging, and simplify a restoring work by positioning a form of foam styrene block on the underground pipe after temporarily digging the sediment over the underground pipe to restore temporarily the temporarily digged portion. CONSTITUTION:When a pipe 3 is damaged, the sediment over the upper side of the pipe 3 is digged temporarily and exposed, and the damaged portion of the pipe 3 is located and the damaged condition is confirmed. Then the upper side of the pipe 3 is restored temporarily to prevent trouble due to traffic, etc. In performing temporary restoring a semicircular groove 9 having a radius (r) corresponding to the outside diameter of the pipe 3 is formed on a frame 7a made of foam styrene block, which is set on the upper side of the exposed pipe 3. First, the falsework 7a is positioned and worked according to the size of the groove 2 digged temporarily. The form 9 is positioned so that the groove 9 may be applied tightly on the upper surface of the pipe 3. Then multiple forms 7b, 7c made of foam styrene block the upper and lower surfaces of which are formed flat, are stacked according to the degree of each covering depth over the buried pipe 3, and then the top of the groove 2 is covered by a protective steel plate 10. As a result, temporary restoring is completed.
    • 29. 发明专利
    • METHOD FOR LAYINGLY CHANGING EXISTING PIPE
    • JPH0243496A
    • 1990-02-14
    • JP19329688
    • 1988-08-02
    • JAPAN STEEL & TUBE CONSTRKOKEN KOGYO KK
    • IWASHITA FUMIHIKOSATO KIMIOEGUCHI TAKUMI
    • E21D9/06F16L55/165
    • PURPOSE:To improve the efficiency of the laying operation of an underground pipe by installing a cutting edge on the end of an auger rod fed and advanced from an arrival vertical shaft, rotating the cutting edge from a departure vertical shaft to break existing pipes, and advancingly feeding newly setting pipes to the rear of the cutting edge. CONSTITUTION:A departure vertical shaft 22 and an arrival vertical shaft 23 are dug on both sides of an existing pipe 2 and an auger rod 17 is rotated by means of a drill head 21 from the arrival vertical shaft 23 to be advanced up to the departure vertical shaft 22. At this time, the inside of the existing pipe 2 is swept by a spiral portion 17a. A cutting edge 18 is installed on the end of the auger rod 17, being rotatably installed on a drill head 20 via a cutting-edge rotating rod 19, and cutting edge 18 is advanced in the direction of the vertical shaft 23 while breaking the existing pipes by the rotation thereof. On the other hand, newly setting pipes 3 are fed via center holding members 24 from the rear of the cutting edge 18 while being fed and added from the departure vertical shaft 22. Thereby, working efficiency can be improved.
    • 30. 发明专利
    • BURIED OBJECT DETECTOR
    • JPS61271488A
    • 1986-12-01
    • JP11330485
    • 1985-05-28
    • JAPAN STEEL & TUBE CONSTRTOYOOKA DENKI KK
    • YAMAMURA TAKAOCHIBA SHUJIIWASHITA FUMIHIKOMATSUO ATSUSHISUZUKI ICHIAKI
    • G01V3/02
    • PURPOSE:To prevent possible accident against a buried conductive object, by safely detecting changes in the electric resistance which will be caused immediately after a metal crown or the like of a drilling machine gets in contact with the buried conductive object during the operation. CONSTITUTION:A drilling machine 2 is set up and ground electrodes 7 and 8 are driven into the ground 10. Then, the operation of the machine 2 is started while a power source switch 12 of a detector is turned ON. As a metal crown at the tip of a drilling rod 3 gets in contact with a buried pipe 9, the value of current flowing through a resistance 14 is increased. Changes in the current is separated with a signal separation circuit 15 and the DC current is amplified 17 to be displayed on a current meter 18. The AC component is amplified 20A and 20B to be inputted into an analog switch 20C. Then, when the output value of an amplifier 17C inputted into the switch 20C exceeds a fixed level, the AC component is outputted to a timer 21. When a timer 21 counts time with a time setting circuit 24 and a buzzer 25 are energized and a control switch 26 is operated as required to stop the machine 2.