会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 18. 发明专利
    • Joining structure of pile head part and its construction method
    • 桩头接合结构及其施工方法
    • JP2006104886A
    • 2006-04-20
    • JP2004296376
    • 2004-10-08
    • Shimizu CorpSumitomo Metal Ind Ltd住友金属工業株式会社清水建設株式会社
    • ISODA KAZUHIKOOTSUKI AKIRANAKANISHI KEIJITANAKA HIROMASAKOBAYASHI YOICHIKURIO YUKIHIRO
    • E02D27/12E04B1/24E04B1/58
    • PROBLEM TO BE SOLVED: To provide a joining structure of a pile head part and its construction method, for improving workability and quality, and reducing cost. SOLUTION: In this joining structure of the pile head part for joining a pile wound with a steel pipe pile or a steel pipe to a foundation of a structure, a diametrally expansive member 5 is composed of an outer steel pipe 3 for surrounding the pile head part 3 from the periphery and a horizontal diaphragm 4 arranged on the lower end of clearance so as to block up the clearance between the outer steel pipe 3 and the pile head part 2. The diametrally expansive member 5 has a plurality of anchor reinforcements 8 embedded in a foundation beam 7 in an outer peripheral part, and is placed on a ring member 6 annularly installed in the pile head part 2. The horizontal diaphragm 4 is fixed to the pile head part 2, and a filler 9 is filled in the clearance between the outer steel pipe 3 and the pile head part 2. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种桩头部分的接合结构及其施工方法,用于提高加工性和质量,并降低成本。 解决方案:在用于将缠绕在钢管桩或钢管上的桩与结构的基础接合的桩头部分的接合结构中,直径膨胀构件5由用于包围的外部钢管3 来自周边的桩头部分3和布置在间隙下端的水平隔膜4,以便阻挡外钢管3和桩头部分2之间的间隙。直径膨胀构件5具有多个锚 加强件8嵌入到外周部的基础梁7中,并且被放置在环形安装在桩头部2中的环形构件6上。水平隔膜4固定到桩头部2,填充物9被填充 在外钢管3和桩头部2之间的间隙中。(C)2006年,JPO&NCIPI
    • 19. 发明专利
    • Joint structure of pile head part
    • 双头联合结构部分
    • JP2005155067A
    • 2005-06-16
    • JP2003392100
    • 2003-11-21
    • Shimizu CorpSumitomo Metal Ind Ltd住友金属工業株式会社清水建設株式会社
    • TANAKA HIROMASAKOBAYASHI YOICHIISODA KAZUHIKOOTSUKI AKIRA
    • E02D27/12
    • PROBLEM TO BE SOLVED: To provide a joint structure of a double-pipe type pile head part, which can reduce material costs by keeping the wall thickness and length of an outer steel pipe small in dimension, and which enables reduction in construction cost and the shortening of a construction period by reducing the amount of excavated soil in installation.
      SOLUTION: The conical outer steel pipe 3, where an anchor bar 5 is fixed on a large-diameter side, is arranged around the head part of a pile 1 which is installed in ground in such a manner that the large-diameter side is positioned on an upside; a solidification material 4 is infilled into a gap between the pipe 3 and the pile 1; and at least a large-diameter side end of the pipe 3 is embedded in an upper footing 2.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种双管式桩头部的接合结构,其可以通过保持外部钢管的壁厚和长度尺寸小而能够降低材料成本,并且能够减少结构 通过减少安装挖土量,缩短施工周期。 解决方案:将锚杆5固定在大直径侧的锥形外钢管3围绕安装在地面上的桩1的头部周围布置,使得大直径 侧面位于上方; 将固化材料4填充到管3和桩1之间的间隙中; 并且管3的至少大直径的侧端部嵌入在上脚底2中。版权所有(C)2005,JPO&NCIPI