    • Cast-in-place concrete filling steel pipe pile and construction method thereof
    • 钢管混凝土填充钢管及其施工方法
    • JP2004162414A
    • 2004-06-10
    • JP2002330473
    • 2002-11-14
    • Shimizu CorpSumitomo Metal Ind Ltd住友金属工業株式会社清水建設株式会社
    • TAKURA TAKASHIOTSUKI AKIRAISODA KAZUHIKOAOKI TAKASHIKOBAYASHI YOICHITANAKA HIROMASA
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide a cast-in-place concrete filling steel pipe pile having high earthquake resistant efficiency at a low cost, at the same time, capable of being easily reused with good workability and a construction method for the cast-in-place concrete filling steel pipe pile.
      SOLUTION: A general section 2 of the cast-in-place concrete filling steel pipe pile 1 is equipped with a small calibered steel pipe 4 having an approximately small external diameter in comparison with a sectional diameter of a hole 12 and concrete 5 filled inward of the steel pipe 4. While, the pile front end section 3 is constituted in a reinforced concrete construction consisting of a cage reinforcement 8 and the concrete 5, the neighborhood of the upper end section of vertically arranged main reinforcement 6 is fixed on the inner circumferential surface near-by the lower end section of the steel pipe 4 through a fixed means such as a welding or the like. A gap is made between a hole wall of a hole 12 in the ground 13 placing the cast-in-place concrete filling steel pipe pile 1 therein and the outer circumferential surface of the steel pipe 4. The gap is filled with a solidified filler 9, and sufficient frictional force is ensured between the gap and the hole wall of the hole 12.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了提供低成本地具有高抗震效率的现浇混凝土填充钢管桩,同时能够容易地重复使用,具有良好的可加工性和用于 现浇混凝土灌注钢管桩。 解决方案:现浇混凝土填充钢管桩1的一般部分2配备有与孔12和混凝土5的截面直径相比具有近似小的外径的小口径钢管4 填充钢管4的内侧。同时,桩前端部3由包括保持架加强件8和混凝土5的钢筋混凝土构造构成,垂直配置的主加强件6的上端部的附近被固定在 通过诸如焊接等的固定装置在钢管4的下端部附近的内周面。 在地面13中的孔12的孔壁之间形成有现浇混凝土填充钢管桩1和钢管4的外周面之间的间隙。间隙填充有凝固填料9 并且在孔12的间隙和孔壁之间确保足够的摩擦力。版权所有(C)2004,JPO
    • 5. 发明专利
    • Leveling machine and method of laying clay-based impermeable layer
    • 水泥机和铺设粘土层的可行性方法
    • JP2008266948A
    • 2008-11-06
    • JP2007109620
    • 2007-04-18
    • Shimizu Corp清水建設株式会社
    • ISHII TAKUAOKI TAKASHI
    • E02D3/046B09B1/00B65G65/44G21F9/36
    • Y02W30/32
    • PROBLEM TO BE SOLVED: To provide a leveling machine capable of leveling a clay-based material without damaging the existing structure. SOLUTION: This leveling machine 3 comprises a vibrating plate 31 for leveling a clay-based material and a vibrator 33 mounted on the vibration plate 31 and vibrating the vibration plate 31. A guide wheel 32, rotatable in the advancing direction, is so installed as to project to the side of the vibrating plate 31. Since the vibrating plate 31 runs, while being separated from a skeleton covering layer and the sidewall of a side wall body part 18 via the guide wheel 32. Since the leveling machine 3 will not damage the skeleton covering layer 17 and the sidewall body part 18, the leveling machine can perform efficient leveling. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种能够使粘土基材料流平而不破坏现有结构的流平机。 解决方案:该调平机3包括用于调平粘土类材料的振动板31和安装在振动板31上的振动器33并使振动板31振动。可沿前进方向旋转的导向轮32 安装成在振动板31的侧面突出。由于振动板31在从骨架覆盖层和侧壁主体部18的侧壁经由引导轮32分离的同时运行。由于整平机3 不会损伤骨架覆盖层17和侧壁体部18,因此能够进行有效的调平。 版权所有(C)2009,JPO&INPIT
    • 6. 发明专利
    • Jointing structure of pile head, and its construction method
    • 桩头接合结构及其施工方法
    • JP2006138096A
    • 2006-06-01
    • JP2004327789
    • 2004-11-11
    • Shimizu Corp清水建設株式会社
    • AOKI TAKASHI
    • E02D27/12E02D5/30E02D27/34
    • PROBLEM TO BE SOLVED: To provide a jointing structure of a pile head, which prevents destruction of a pile head by reducing stress occurring on the pile head and which can reduce a construction period and construction costs by virtue of good constructibility, and a construction method for the jointing structure of the pile head.
      SOLUTION: A concrete-filled steel pipe 2, wherein concrete 4 is infilled into a cylindrical steel pipe 3, is installed on the pile head 1a of a prefabricated concrete pile 1. An upper end of the steel pipe 2 is inserted into a foundation 9 up to a depth of the order of 100 mm, and an annular bearing plate 5 with a width of the order of 50 mm is welded to a peripheral edge of an upper end surface of the steel pipe 2. A cushioning material 6 with a thickness of the order of 10 mm is interposed between contact surfaces of an outer peripheral surface of the upper end of the steel pipe 2 and the foundation 9. A rod-like anchor bar 8, which is restrained by a hoop bar 10, is arranged in the center, in a plane-cross-section view, of the steel pipe 2 in the axis-of-member direction of the pile, and elongated from the steel pipe 2 so as to be embedded in the foundation 9.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种桩头的接合结构,其通过减少桩头上的应力来防止桩头的破坏,并且由于良好的构造性而可以减少施工周期和施工成本,以及 桩头接头结构的施工方法。

      解决方案:将混凝土4填充到圆筒形钢管3中的混凝土填充钢管2安装在预制混凝土桩1的桩头1a上。将钢管2的上端插入 将基底9直到100mm的深度,并且宽度为50mm的环形支承板5焊接到钢管2的上端表面的周边边缘。缓冲材料6 在钢管2的上端的外周面和基座9的接触面之间插入有10mm左右的厚度。由环形杆10约束的杆状锚杆8, 在该钢管2的沿桩的方向的方向的中心部分的平面剖视图中,从钢管2伸长以嵌入基座9中。 P>版权所有(C)2006,JPO&NCIPI

    • 7. 发明专利
    • Joint structure of pile head section and its construction method
    • 桩头联合结构及其施工方法
    • JP2006070471A
    • 2006-03-16
    • JP2004252089
    • 2004-08-31
    • Shimizu Corp清水建設株式会社
    • AOKI TAKASHIISODA KAZUHIKO
    • E02D27/12E02D5/34E02D27/34
    • PROBLEM TO BE SOLVED: To provide a joint structure of a pile head section capable of preventing the destruction of the pile head section by reducing stress occurring in the pile head section and, at the same time, reducing a construction period of time and a construction cost with high workability.
      SOLUTION: A concrete mat 3 having a diameter smaller than the pile head section 2 is mounted on the pile head section 2, and a concrete foundation 6 is constructed on the concrete mat 3. A bar-shaped joint reinforcement 4 is arranged to the center section of a cross section of the pile head section 2, the joint reinforcement 4 is extended from the pile head section 2 to pass through the concrete mat 3, and it is anchored to the inside of the concrete foundation 6. On the other hand, a main bar 5 arranged on the circumferential section of a pile 1 is kept in the pile head section 2. The concrete mat 3 is so constituted that a vinyl or a thin rubber-made bag body, etc. formed in the shape of a tire of a vehicle is filled with a concrete, and a back-filling soil surrounding the concrete mat 3 uses sand 7 mixed with a granulated foaming agent such as high quality sand or a foam polyethylene beads, etc.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够通过减少桩头部分中产生的应力来防止桩头部分破坏的桩头部分的接合结构,并且同时减少施工周期 施工成本高,可加工性高。 解决方案:将具有小于桩头部分2的直径的混凝土垫3安装在桩头部分2上,并且在混凝土垫3上构造混凝土基础6。布置有条形接头加强件4 在桩头部分2的横截面的中心部分,接头加强件4从桩头部分2延伸穿过混凝土垫3,并且锚固在混凝土基座6的内部。在 另一方面,布置在桩1的圆周部分上的主杆5保持在桩头部分2中。混凝土垫3被构造成形成为形状的乙烯基或薄橡胶制成的袋体等 车辆的轮胎填充有混凝土,并且围绕混凝土垫3的回填土壤使用与造粒发泡剂(例如高品质砂或泡沫聚乙烯珠等)混合的砂7。版权所有: (C)2006,JPO&NCIPI
    • 8. 发明专利
    • Structure and method for joining steel pipe pile and upper structure
    • 钢管接头和上部结构的结构与方法
    • JP2005113453A
    • 2005-04-28
    • JP2003347195
    • 2003-10-06
    • Kubota CorpShimizu Corp株式会社クボタ清水建設株式会社
    • AOKI TAKASHIISODA KAZUHIKOOTSUKI MITSUGIHIROSE TOMOHARUMORI TAKASHI
    • E02D27/12E02D27/34
    • PROBLEM TO BE SOLVED: To provide a structure and a method for joining a steel pipe pile and an upper structure, which enable cost reduction and the shortening of a construction period by simply and surely installing a transferred stress reducing device.
      SOLUTION: In the structure for joining the steel pipe pile and the upper structure, the transferred stress reducing device 4 for reducing the transfer of stress is interposed between the steel pipe pile 1 and the upper structure 3 which is formed above the steel pipe pile 1; a filling concrete part 6 is formed in a pile head part 2 of the steel pipe pile 1; a first anchor material 7, which protrudes upward from inside the filling concrete part 6, is protrusively provided on an upper end surface of the filling concrete part 6; and the device 4 is fixed to the first anchor material 7, and fixed to the upper structure 3 by a second anchor material 15 which is fixed to the device 4.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 解决的问题:提供一种用于连接钢管桩和上部结构的结构和方法,通过简单且可靠地安装转移的应力降低装置,能够降低成本并缩短施工周期。 解决方案:在用于接合钢管桩和上部结构的结构中,用于减少应力传递的传递应力减小装置4插入在钢管桩1和形成在钢之上的上部结构3之间 管桩1; 在钢管桩1的桩头部2中形成有填充混凝土部6; 从填充混凝土部分6的内部向上突出的第一锚固材料7突出地设置在填充混凝土部件6的上端表面上; 并且装置4固定到第一锚固材料7上,并通过固定到装置4的第二锚定材料15固定到上部结构3上。(C)2005,JPO和NCIPI
    • 9. 发明专利
    • Base isolation foundation structure of structural body
    • 结构体的基础隔离基础结构
    • JP2003306951A
    • 2003-10-31
    • JP2002113811
    • 2002-04-16
    • Shimizu Corp清水建設株式会社
    • OTSUKI AKIRATAKURA TAKASHIAOKI TAKASHI
    • E02D27/34E02D27/12E04B1/36E04H9/02
    • PROBLEM TO BE SOLVED: To provide a base isolation foundation structure of a structural body capable of effectively using an existing pile.
      SOLUTION: In a foundation beam 4, pile heads of a plurality of existing piles 2 are connected to pile heads of new piles 3. A new structural body 1 is constructed on the upper part thereof. A sliding device 5 is formed on the upper face and connected to the foundation beam 4 through the sliding device 5. The new pile 3 is rigidly connected to the foundation beam 4, but the sectional diameter is set small by a design in which a vertical support force is taken into consideration. Since the bending rigidity is made small by making the sectional diameter small, when a horizontal force larger than a specified force acts on the new pile 3 from the foundation beam 4 by an earthquake or the like, a deflection occurs at the pile head of the new pile 3. Thereby, the pile head displacement becomes large but the sectional area becomes small and the section of the foundation beam 4 can be greatly reduced.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供能够有效地使用现有桩的结构体的基础隔离基础结构。 解决方案:在基础梁4中,多个现有桩2的桩头连接到新桩3的桩头上。新的结构体1在其上部构造。 滑动装置5形成在上表面上并且通过滑动装置5连接到基础梁4.新的桩3刚性地连接到基础梁4,但是通过垂直 支持力被考虑在内。 由于通过使截面直径小而使弯曲刚度变小,所以当大于特定力的水平力通过地震等从基础梁4作用在新的桩3上时,在桩的头部 因此,桩头位移变大,但截面积变小,能够大幅减小基础梁4的截面。 版权所有(C)2004,JPO
    • 10. 发明专利
    • Construction of pile head joint portion
    • 桩头接头部分的构造
    • JP2003027499A
    • 2003-01-29
    • JP2001218596
    • 2001-07-18
    • Shimizu Corp清水建設株式会社
    • AOKI TAKASHIISODA KAZUHIKO
    • E02D5/30E02D27/12
    • PROBLEM TO BE SOLVED: To provide a pile head stress-easing device, which can be fixed firmly to a ready made pile having a relatively large diameter, and also provide an excellent handling quality for a member interposed between the pile head portion and the pile head stress-easing device during the work and reducing the cost within reason.
      SOLUTION: A spherical seat 41 having a sliding surface, as a part of the spherical surface and a pile head stress easing device 4 equipped with an upper lid 42 fitted to the spherical seat, is interposed between the head of a hollow PHC pile 1 and the top of a foundation bottom slab 3. A cone head 7 is attached to the upper end opening 2a of the head portion 2 of a hollow PHC pile 1, by fitting the cone head 7 to the upper end opening 2a of the head portion 2 of the hollow PHC pile 1, and concrete 8 is filled inside the cone head 7. The pile head stress easing device 4 is attached to the upper side of the filled concrete 8 via non-shrinkable mortar 9. The pile head stress easing device 4 is supported as a single united body by the cone head 7 and concrete 8 filled inside, and thus high support strength can be obtained.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:提供一种可以牢固地固定在具有较大直径的现成的桩上的桩头应力松弛装置,并且还为插入在桩头部分和桩之间的构件提供优良的处理质量 头部应力消除装置在工作期间降低成本的原因。 解决方案:具有作为球面的一部分的滑动面的球形座41和装配有球形座的上盖42的桩头应力释放装置4插入在中空PHC桩1的头部和 底座底板3的顶部。锥头7通过将锥头7安装到头部2的上端开口2a而附接到中空PHC桩1的头部2的上端开口2a上 的中空PHC桩1,混凝土8填充在锥头7的内部。桩头应力释放装置4通过不可收缩的砂浆9附着在填充混凝土8的上侧。桩头应力释放装置4 通过锥头7和填充在内部的混凝土8作为单一联合体支撑,因此可以获得高的支撑强度。