会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • METHOD AND APPARATUS FOR MOLDING OBJECTS MADE OF ALUMINUM, ALUMINUM ALLOYS, LIGHT ALLOYS, BRASS AND THE LIKE
    • 方法和设备成型铝,铝合金,轻合金,黄铜等对象
    • EP3170582A1
    • 2017-05-24
    • EP16002450.1
    • 2016-11-17
    • IDRA S.R.L.
    • Boni, RobertoFerri, Ruggero
    • B22D18/02B22D18/04B22D18/08B22D17/20B22D17/22B22D27/11
    • B22D18/04B22D17/2069B22D17/2281B22D18/02B22D18/08B22D27/11F16F1/34F16F2224/0258
    • A method for molding objects made of aluminum, aluminum alloys, light alloys, brass and the like, includes the steps of: starting from a molding apparatus which includes a lower platen adapted to support a lower mold part connected to a duct for feeding liquid metal, an upper platen at which an upper mold part is arranged, a compaction plug arranged so that it can move coaxially with respect to the upper mold part and a flow control element that is arranged concentrically inside the compaction plug, closing the upper mold part onto the lower mold part in order to form a mold cavity; introducing liquid metal through the duct within the mold cavity; moving the compaction plug upward, in order to obtain an accumulation of liquid metal within the mold cavity and in a chamber formed by the space freed by the upward movement of the compaction plug; closing the duct for feeding liquid metal by moving downward the flow control element and depressurizing the liquid metal supply hole, causing the return of the liquid metal within the duct; forging the liquid metal within the mold cavity by feeding downward the compaction plug.
    • 一种用于由铝,铝合金,轻合金,黄铜等成型的物体,方法包括以下步骤:从一个成型装置,其包括一个下压板angepasst以支持连接到一个管道中的下模具部分用于供给液态金属开始 上上压板在其处上模具部分布置,压实插头布置并可以相对于上模具部分和一个流动控制元件同轴地移动并在所述压实插头内部同心地设置,关闭上模部分放置到 为了形成模腔的下模; 通过在模腔内的管道引入液体金属; 向上移动压实插头,以便获得到模具空腔内并在由压实插头的向上移动释放的空间形成的腔室的液态金属的积累; 关闭所述管道用于通过向下移动所述流量控制元件和减压的液态金属供给孔,使所述管道内的液体金属的返回馈送液体金属; 通过向下馈送压实插头锻模腔内的液体金属。
    • 4. 发明公开
    • PROCESS AND APPARATUS FOR CASTING TITANIUM ALUMINIDE COMPONENTS
    • 用于四元组件的方法和设备
    • EP2994256A4
    • 2016-11-30
    • EP14834940
    • 2014-04-30
    • BORGWARNER INC
    • SCHNEIDER WOLFGANGSCHERRER FRANK
    • B22D18/02
    • B22D18/02B22D21/005
    • A process for casting TiAl components, having the following process steps: producing a melt (S) of the TiAl material below an inert gas fill (IF); placing a casting mold (1) on a gate (2) in a gastight manner; flooding the casting mold (1) with inert gas (IG) by opening a closure mechanism (7) which is arranged at the gate (2) and is connected to an inert gas source (8); pressing the melt (S) through the gate (2) into the casting mold (1) by increasing the pressure (P) of the inert gas fill (IF) above the melt (S) while at the same time evacuating the inert gas (IG) from the casting mold (1), and stopping the inflow of inert gas (IG) as soon as it is determined that the melt (S) passes above the position of the closure mechanism (7).
    • 一种用于铸造TiAl组分的方法,具有以下工艺步骤:在惰性气体填充物(IF)下方生产TiAl材料的熔体(S); 以气密的方式将铸模(1)放置在闸门(2)上; 通过打开设置在闸门(2)处并连接到惰性气体源(8)的闭合机构(7),用惰性气体(IG)淹没铸模(1)。 通过增加熔体(S)上方的惰性气体填充物(IF)的压力(P),同时将惰性气体排出(S),将熔体(S)通过浇口(2)压入铸模(1) IG),并且一旦停止惰性气体(IG)的流入,则确定熔体(S)通过封闭机构(7)的位置之上。
    • 10. 发明公开
    • Casting process, upeer mold assembly and method of securing core to upper mold
    • Gießverfahren,Oberformanordnung und Verfahren zum Befestigen des Kerns an der Oberform
    • EP1927415A1
    • 2008-06-04
    • EP07120818.5
    • 2007-11-15
    • SINTOKOGIO, LTD.
    • Hashimoto, KunihiroIwasaki, JunichiHagata, YutakaKamasaka, Takeshi
    • B22D18/02B22C9/10B22C21/14
    • B22D18/02B22C9/108B22C21/14
    • The casting process includes the steps of: preparing an upper mold assembly (20) by securing a core to an upper mold; pouring a necessary minimum amount of a molten metal for obtaining a casting in the hollow of the lower mold; moving downwardly the upper mold assembly at a predetermined first speed to a predetermined height level just before the upper mold assembly comes into contact with a surface of the molten metal in the hollow of the lower mold; further moving downwardly the upper mold assembly, from the predetermined height level, at a predetermined second speed by changing the descending speed of the upper mold assembly from the first speed to the second speed; detecting a status information of the upper mold assembly in a state when the upper mold assembly is superimposed on the lower mold, or arrived at the lower mold; and stopping the descending movement of the upper mold assembly after detecting that the status information comes at a predetermined state. The upper mold assembly is prepared by securing the core to the upper mold with a mechanical means, an adhesive, frictional engagement of a projection (24a,24b) with a recess (22a,22b) or engagement of a projection (24C) with stamped molding sand of the upper mold.
    • 铸造方法包括以下步骤:通过将芯固定到上模上来准备上模组件(20); 浇注必要的最小量的熔融金属,以在下模具的中空部分中获得铸件; 在上模具组件与下模具的中空部分中的熔融金属表面接触之前,以预定的第一速度将上模具组件向下移动到预定的高度水平; 通过将上模具组件的下降速度从第一速度改变到第二速度,以预定的第二速度进一步从预定的高度水平向下移动上模具组件; 在上模组件重叠在下模上或到达下模的状态下检测上模组件的状态信息; 并且在检测到状态信息进入预定状态之后停止上模组件的下降运动。 通过用机械装置,粘合剂将突起(24a,24b)与凹部(22a,22b)的摩擦接合或突起(24C)与冲压件(24C)的接合来将芯固定到上模上来制备上模具组件 上模的型砂。