会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Framework for managing complex operations
    • 管理复杂操作的框架
    • US08887123B2
    • 2014-11-11
    • US12182199
    • 2008-07-30
    • Tao LinMing-Chien ShanSuresh BabuChuan Li
    • Tao LinMing-Chien ShanSuresh BabuChuan Li
    • G06F9/44G06Q10/06
    • G06Q10/06
    • An operations management environment is integrated with an information technology infrastructure through an adaptor, the integration occurring while the information technology infrastructure performs one or more tasks. Data from the information technology infrastructure is received through the adapter. Relationships between the artifacts included in the information technology infrastructure are modeled based on the received data. A proposed modification to the information technology infrastructure is determined based on an external change. While the information technology infrastructure performs the one or more tasks, the response of the artifacts to the proposed modification is simulated using the modeled relationships. The response of the artifacts is monitored to determine if the proposed modification implements the external change. A modification is generated based on the proposed modification if the proposed modification implements the external change, and the information technology infrastructure is updated while the information technology infrastructure performs the one or more tasks.
    • 操作管理环境通过适配器与信息技术基础设施集成,信息技术基础架构执行一个或多个任务时发生集成。 通过适配器接收信息技术基础设施的数据。 基于接收到的数据,对信息技术基础设施中包含的工件之间的关系进行建模。 基于外部变化确定对信息技术基础设施的修改。 当信息技术基础设施执行一个或多个任务时,使用建模的关系模拟人造物对所提出的修改的响应。 监视工件的响应以确定所提出的修改是否实现外部变化。 如果提出的修改实施外部变更,则基于所提出的修改生成修改,并且在信息技术基础设施执行一个或多个任务的同时更新信息技术基础设施。
    • 2. 发明申请
    • FRAMEWORK FOR MANAGING COMPLEX OPERATIONS
    • 管理复杂操作的框架
    • US20090144694A1
    • 2009-06-04
    • US12182199
    • 2008-07-30
    • Tao LinMing-Chien ShanSuresh BabuChuan Li
    • Tao LinMing-Chien ShanSuresh BabuChuan Li
    • G06F9/44G06Q10/00
    • G06Q10/06
    • An operations management environment is integrated with an information technology infrastructure through an adaptor, the integration occurring while the information technology infrastructure performs one or more tasks. Data from the information technology infrastructure is received through the adapter. Relationships between the artifacts included in the information technology infrastructure are modeled based on the received data. A proposed modification to the information technology infrastructure is determined based on an external change. While the information technology infrastructure performs the one or more tasks, the response of the artifacts to the proposed modification is simulated using the modeled relationships. The response of the artifacts is monitored to determine if the proposed modification implements the external change. A modification is generated based on the proposed modification if the proposed modification implements the external change, and the information technology infrastructure is updated while the information technology infrastructure performs the one or more tasks.
    • 操作管理环境通过适配器与信息技术基础设施集成,信息技术基础架构执行一个或多个任务时发生集成。 通过适配器接收信息技术基础设施的数据。 基于接收到的数据,对信息技术基础设施中包含的工件之间的关系进行建模。 基于外部变化确定对信息技术基础设施的修改。 当信息技术基础设施执行一个或多个任务时,使用建模的关系模拟人造物对所提出的修改的响应。 监视工件的响应以确定所提出的修改是否实现外部变化。 如果提出的修改实施外部变更,则基于所提出的修改生成修改,并且在信息技术基础设施执行一个或多个任务的同时更新信息技术基础设施。
    • 5. 发明申请
    • Interfaces between enterprise customers and suppliers
    • 企业客户与供应商之间的接口
    • US20070027740A1
    • 2007-02-01
    • US11475322
    • 2006-06-26
    • Suresh BabuYouneng XiaoJie ZhaoChristiane Kuntz-MayrHeinz KagermannRamshankar Venkatasubramanian
    • Suresh BabuYouneng XiaoJie ZhaoChristiane Kuntz-MayrHeinz KagermannRamshankar Venkatasubramanian
    • G06Q99/00G06F15/02G06F9/46
    • G06Q10/00G06Q30/0633
    • Methods and apparatuses for interfacing an enterprise customer with a supplier are described herein. In one embodiment, in response to a request received from an enterprise customer via a first interface (e.g., a common or universal interface) of a Web service over the Internet for a service provided by a supplier, processing logic is configured to map the request from a first format compatible with the first interface to a second format compatible with a second interface coupling with a backend system of the supplier. Processing logic invokes a method of the backend system of the supplier via the second interface (e.g., supplier specific interface) to provide the requested service to the enterprise customer using information of the mapped request. The first interface is compatible with the requesting customer and the second interface is a specific interface to the backend system of the supplier. Functionality of mapping and the second interface are maintained by the supplier. Other methods and apparatuses are also described.
    • 本文描述了用于将企业用户与供应商接口的方法和装置。 在一个实施例中,响应于通过因特网针对由供应商提供的服务的经由因特网的Web服务的第一接口(例如,公共或通用接口)从企业客户接收的请求,处理逻辑被配置为映射请求 从与第一接口兼容的第一格式到与与供应商的后端系统耦合的第二接口兼容的第二格式。 处理逻辑通过第二接口(例如,供应商专用接口)来调用供应商后端系统的方法,以使用映射请求的信息向企业客户提供所请求的服务。 第一个接口与请求的客户兼容,第二个接口是供应商后端系统的特定接口。 供应商维护映射功能和第二个界面。 还描述了其它方法和装置。
    • 6. 发明申请
    • Automated recall management system for enterprise management applications
    • 企业管理应用自动召回管理系统
    • US20050004811A1
    • 2005-01-06
    • US10776619
    • 2004-02-12
    • Suresh Babu
    • Suresh Babu
    • G06Q10/00G06F17/60
    • G06Q10/08G06Q10/06395G06Q10/20G06Q30/014
    • A computerized recall management tool permits an organization to recognize and proactively manage events that can indicate a need to initiate a product recall. Product performance data often is made available to an organization through very diverse communication channels, including from customers, distributors, suppliers, governmental or industry agencies in addition to its internal manufacturing and testing sources. The recall management tool may include modules to recognize patterns of product defects from product performance data, to model an extent to which a product defect may proliferate throughout its distributed products, to alert operators when such patterns are detected, to manage regulatory reporting events and other notification milestones and to manage a recall itself.
    • 计算机化的召回管理工具允许组织识别并主动管理可指示需要启动产品召回的事件。 产品绩效数据通常通过非常多样化的沟通渠道向组织提供,包括来自客户,分销商,供应商,政府或行业机构以及其内部制造和测试来源。 召回管理工具可以包括用于从产品性能数据识别产品缺陷模式的模块,以模拟产品缺陷在其分布式产品中可能扩散的程度,以便在检测到这种模式时警告操作者,管理监管报告事件和其他 通知里程碑和管理召回本身。
    • 7. 发明申请
    • JOB SCHEDULING PROGRESS BAR
    • 工作进度条
    • US20130346986A1
    • 2013-12-26
    • US13528710
    • 2012-06-20
    • Thomas GoetzSuresh Babu
    • Thomas GoetzSuresh Babu
    • G06F9/46
    • G06F9/485G06F11/3003G06F11/3055G06F11/324G06F11/3419G06F11/3466G06F2201/865
    • Methods and apparatus, including computer program products, are provided for scheduling batch jobs. In one aspect there is provided a method. The method may receiving, at a progress engine, status information provided by a job scheduler controlling an execution of a plurality of jobs, the status information representative of the plurality of jobs of the batch job; receiving, at the progress engine implemented on at least one processor, reference information representative of past executions of batch jobs; determining, by the progress engine, a completion time for the batch job based on the received status information and the received reference information; and generating, by the progress engine, a page including the determined completion time. Related systems, methods, and articles of manufacture are also disclosed.
    • 提供方法和设备,包括计算机程序产品,用于调度批处理作业。 在一个方面,提供了一种方法。 该方法可以在进度引擎处接收由作业调度器提供的控制多个作业的执行的状态信息,该状态信息表示批处理作业的多个作业; 在至少一个处理器上执行的进程引擎处接收代表过去执行批处理作业的参考信息; 基于所接收的状态信息和接收的参考信息,由进度引擎确定批作业的完成时间; 以及由进度引擎产生包括确定的完成时间的页面。 还公开了相关系统,方法和制品。