    • 2. 发明专利
    • Soil improvement method
    • 土壤改良方法
    • JP2006336219A
    • 2006-12-14
    • JP2005159316
    • 2005-05-31
    • Shimizu Corp清水建設株式会社
    • KAWASAKI HIROTAKA
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a soil improvement method capable of economically and rationally preparing a soil improvement body having a large diameter, by preventing mixing of a curing material in sludge, by uniformly mixing the curing material and a reaction material.
      SOLUTION: A tip part of an injection rod 1 has an upper stage part 2 for injecting cutting water and compressed air, and a lower stage part 3 for injecting the curing material and the reaction material. A side surface of the upper stage part 2 is provided with an upper stage injection hole 12 composed of a first injection hole 12a for injecting the cutting water and a second injection hole 12b arranged in an outer peripheral part of the first injection hole 12a and injecting the compressed air, and the cutting water surrounded by the compressed air is injected from the upper stage injection hole 12. While, a side surface of the lower stage part 3 is provided with a curing material injection hole 13 and a reaction material injection hole 14 in close vicinity in the substantially same height so that the reaction material injection hole 14 becomes the downstream side of the curing material injection hole 13 in the rotational direction R of the injection rod 1. The curing material and the reaction material are respectively simultaneously injected from the curing material injection hole 13 and the reaction material injection hole 14.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:通过将固化材料和反应材料均匀混合,通过防止污泥中固化物质的混合,提供能够经济合理地制备具有大直径的土壤改良体的土壤改良方法。 解决方案:注射杆1的顶端具有用于喷射切割水和压缩空气的上部部分2,以及用于注射固化材料和反应材料的下部分部分3。 上段部2的侧面设置有由用于喷射切割水的第一喷射孔12a和布置在第一喷射孔12a的外周部分的第二喷射孔12b构成的上部喷射孔12, 压缩空气和被压缩空气包围的切割水从上段喷射孔12喷射。另外,下段3的侧面设有固化材料喷射孔13和反应物喷射孔14 在大致相同的高度附近,使得反应材料注入孔14成为注入棒1的旋转方向R上的固化材料注入孔13的下游侧。固化材料和反应材料分别同时从 固化材料注入孔13和反应材料注入孔14。版权所有(C)2007,JPO&INPIT
    • 5. 发明专利
    • Water-stopping layer and method for forming the same
    • 止水层及其形成方法
    • JP2003010809A
    • 2003-01-14
    • JP2001201298
    • 2001-07-02
    • Shimizu Corp清水建設株式会社
    • YONENAGA HIROSHIYASUKOCHI TAKASHITAMURA SHINSUKESUGA TADASHIKAWASAKI HIROTAKAISE JUICHI
    • E02D3/026B09B1/00
    • PROBLEM TO BE SOLVED: To form an water-stopping layer having a high performance at a low manufacturing cost.
      SOLUTION: A mixed soil is prepared by using a dehydrated cake as a viscous soil and mixing the viscous soil with the excavated soil of a crushed stone with a maximum particle diameter of not more than 30 mm as gravel material so that the blending ratio of fine particles which are smaller in a size than that of silt is set within the range of a weight ratio of 55 to 65%. The water-stopping layer is formed by compacting the mixed soil at a degree of compacting of not less than 95%. Following this procedural step, a cement curing material is added to the mixed soil at a blending ratio of 3 to 10% in terms of weight ratio. Next, the previously prepared mixed soil is evenly laid at the site and compacted with a tamping roller or a vibratory roller to form the water-stopping layer with a thickness of 15 to 30 cm. Finally, the water-stopping layers are sequentially piled up.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:以低制造成本形成具有高性能的止水层。 解决方案:通过使用脱水饼作为粘性土壤制备混合土壤,并将粘性土壤与最大粒径不超过30毫米的碎石开挖土壤作为砾石材料混合,使混合比例 尺寸小于淤泥的粒子的重量比设定在55〜65%的范围内。 止水层通过以不低于95%的压实度压实混合土而形成。 按照该步骤,将混合土壤中的水泥固化材料按重量比计为3〜10%的混合比例添加。 接下来,将预先制备的混合土壤均匀铺设在现场并用捣实辊或振动辊压实,形成厚度为15至30cm的止水层。 最后,依次堆积止水层。
    • 7. 发明专利
    • Multi-shaft composite stirring construction method
    • 多轴复合材料施工方法
    • JP2008088731A
    • 2008-04-17
    • JP2006271913
    • 2006-10-03
    • Shimizu Corp清水建設株式会社
    • KAMIMURA KAZUYOSHIMITSUYAMA TEIJIKAWASAKI HIROTAKATONISHI YUKIOKUROSAKI FUJIMI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide an effective and proper device and a construction method for improving soil by the combined stirring of mechanical stirring and injection stirring economically and efficiently.
      SOLUTION: This device is provided with the odd number of rotary shafts 1, namely, three shafts or more provided with stirring blades at tips, each of these rotary shafts is composed of at least two main rotary shafts 1A and at least one auxiliary rotary shaft 1B, and the main rotary shafts and the auxiliary rotary shafts are alternately arranged in parallel while the main rotary shafts are arranged on both sides. A main injection port 4 for jetting an improving agent is provided at the tip of the main rotary shaft, an auxiliary injection port 9 for jetting the improving agent is provided at the tip of the auxiliary rotary shaft, and a spiral 8 for pushing up and discharging the soil around a shaft part of the auxiliary rotary shaft is provided at the shaft part of the auxiliary rotary shaft. An improved body 10 having a shape having a main injection stirring improving part 10b and an auxiliary injection stirring improving part 10c is constructed on the outer side of a mechanical stirring improving part 10a.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:经济有效地通过机械搅拌和注射搅拌的组合搅拌来提供有效和适当的装置和用于改善土壤的施工方法。 解决方案:该装置具有奇数个旋转轴1,即在尖端处具有搅拌叶片的三个或更多个轴,这些旋转轴中的每一个由至少两个主旋转轴1A和至少一个 辅助旋转轴1B,并且主旋转轴和辅助旋转轴在主旋转轴布置在两侧时交替布置成平行。 在主旋转轴的顶端设置有用于喷射改进剂的主喷射口4,在辅助旋转轴的前端设置有用于喷射改进剂的辅助喷射口9,以及用于向上推 在辅助旋转轴的轴部设置辅助旋转轴的轴部周围的土壤排出。 具有主喷射搅拌改善部10b和辅助喷射搅拌改善部10c的形状的改进体10构成在机械搅拌改善部10a的外侧。 版权所有(C)2008,JPO&INPIT
    • 8. 发明专利
    • Ground measuring method, ground measuring program and ground measuring instrument
    • 地面测量方法,地面测量程序和地面测量仪器
    • JP2007163275A
    • 2007-06-28
    • JP2005359306
    • 2005-12-13
    • Shimizu Corp清水建設株式会社
    • KAWASAKI HIROTAKANAGASAWA MASAAKI
    • G01N3/303E02D1/02G01N3/00
    • PROBLEM TO BE SOLVED: To precisely evaluate the rigidity of the ground by measuring the original accurate rigidity of the ground without exerting the effect of load history on the ground and enhancing the correlation with another on-the-spot testing method such as a flat plate loading test or the like.
      SOLUTION: A dropping height is changed so as to become high gradually and a weight is continuously dropped on a loading surface one by one at the respective changed dropping heights. Since the ground is gradually consolidated by finely dividing the dropping height to perform only main loading one by one without performing preparatory loading, the original accurate rigidity of the ground can be measured. Impact load is instantaneous load but, since the main loading is continuously perform one by one by gradually increasing the dropping height to measure the cumulative displacement of the ground, initial loading rigidity having high correlation with respect to the loading rigidity at the time of monotonous loading of the flat plate loading test can be acquired by mutually connecting the displacement points to an applied load peak point.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:通过测量地面的原始精确刚度,而不会发生地面载荷历史的影响,并通过另一种现场测试方法(如 平板加载试验等。 解决方案:逐渐变高并且在各个改变的落下高度上一个接一个地在装载面上连续地下降重量,从而改变落下高度。 由于在不进行准备装载的情况下,通过将落下高度精细地分割为仅主要负载而逐渐固结地面,因此可以测量原始的精确刚度。 冲击载荷是瞬时载荷,但是由于主载荷通过逐渐增加落下高度逐渐增加以测量地面的累积位移,所以初始载荷刚度与单调载荷时的载荷刚度具有高相关性 可以通过将位移点相互连接到施加的载荷峰值点来获得平板载荷试验。 版权所有(C)2007,JPO&INPIT
    • 9. 发明专利
    • Ground improvement construction method
    • 地基改良施工方法
    • JP2006336216A
    • 2006-12-14
    • JP2005159309
    • 2005-05-31
    • Shimizu Corp清水建設株式会社
    • KAWASAKI HIROTAKAYOKOYAMA KATSUHIKOYOSHIDA KOICHIISE JUICHI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a ground improvement construction method capable of reducing cost, and capable of increasing efficiency in construction, by rationally preparing an improvement body having a large diameter.
      SOLUTION: This ground improvement construction method prepares the columnar improvement body 14 in the ground G by filling a curing material in the ground G by injecting the curing material from a lower stage injection hole 3 while cutting the ground G by injecting cutting water from an upper stage injection hole 2 when pulling up while rotating an injection rod 1 inserted into the ground. Unset pw or qw is determined by setting any of ϕc and pw or qw from a correlation between cutting capacity pw×qw and a cutting diameter ϕc of the ground expressed by the product of injection pressure pw of the cutting water and a delivery quantity qw per unit time of the cutting water. Unset ps or Qs is determined by setting any of ϕ and ps or Qs from a correlation between improvement body preparing capacity ps×Qs and a diameter ϕ of the improvement body expressed by the product of injection pressure ps of the cutting material and an injection quantity Qs per the unit depth of the curing material.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:通过合理地制备具有大直径的改进体,提供能够降低成本并且能够提高施工效率的地面改进施工方法。 解决方案:该地面改进施工方法通过从下阶段注入孔3注入固化材料,同时通过注入切割水切割地面G来填充地面G中的固化材料来制备地面G中的柱状改良体14 当上升阶段的注射孔2在旋转插入地面的注射杆1的同时向上拉。 通过从切割能力pw×qw与切割水的注入压力pw的乘积表示的地面的切割直径φc和每次输送量qw之间的相关性来设定φc和pw或qw中的任何一个来确定未设定的pw或qw 单位时间的切割水。 通过根据改进体准备容量ps×Qs与切削材料的注射压力ps的乘积表示的改进体的直径φ和注射量之间的相关性来设定φ和ps或Qs中的任何一个来确定未设定的ps或Q 固化材料的单位深度为Qs。 版权所有(C)2007,JPO&INPIT
    • 10. 发明专利
    • Ground execution method
    • 地面执行方法
    • JP2006016921A
    • 2006-01-19
    • JP2004197906
    • 2004-07-05
    • Bridgestone CorpShimizu Corp株式会社ブリヂストン清水建設株式会社
    • FUKUTAKE TAKEYOSHIHORIUCHI SUMIOKAWASAKI HIROTAKAASHOKA KUMAR KARMOKARTAKEICHI HIDEO
    • E02D17/18E02D29/02
    • PROBLEM TO BE SOLVED: To reduce an earth pressure or a hydraulic pressure acting on an abutment, an earth retaining wall, etc. and prevent a back-filling material ground or an embankment ground from settling.
      SOLUTION: An expanded cylindrical laminate body is made by filling granular material into a cylindrical laminated body of waste tires until waste tires expands in the volume. The method includes a process forming a back-filling material ground 150 by using expanded cylindrical laminated structures 110
      1 ,110
      2 , 110
      3 formed of a plurality of expanded cylindrical laminate body 120 having connection clips cylindrically laminated while mutually connecing the waste tires with a little deformed curvature of beads and the beads to cylindrically laminate.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:减少作用在基台,土挡土墙等上的土压力或液压压力,防止回填材料地面或堤防地面沉降。

      解决方案:通过将颗粒材料填充到废轮胎的圆柱形层叠体中直到废轮胎在体积中膨胀来制造扩展的圆柱形层压体。 该方法包括通过使用由下列方式形成的膨胀圆柱形层压结构110,SBB,110S,SBB, 多个膨胀圆柱形层压体120具有圆柱形层叠的连接夹,同时相互连接废轮胎,其具有小的变形曲率的珠和珠到圆柱形层压。 版权所有(C)2006,JPO&NCIPI