    • 9. 发明专利
    • TUNNEL EXCAVATING DEVICE
    • JPH08232579A
    • 1996-09-10
    • JP4016295
    • 1995-02-28
    • NIPPON KOKI KK
    • SAKAGUCHI FUKUJUFUTAKI YUKIOASHIKAWA TOMOFUMI
    • E21D9/10E21B7/02E21B15/00E21B19/08E21C11/02
    • PURPOSE: To contrive the construction of a small-sized and light weight rack by dividing a self-traveling rack into an upper stage and a lower stage and constituting the rack so that both may be connectable and loading a main excavating machine on the lower stage and a post treatment machine and so forth on the upper stage and forming the lower stage under solid structure and the upper stage under soft structure. CONSTITUTION: A lower stage gantry 10 comprising a rack 18 traveling on a rail 17 is designed to be solid enough to withstand stress or vibration produced during excavation in structure on which an outrigger 26 and so forth required for excavation are loaded. On one hand, an upper stage gantry 12 comprising a traveling rack 30 is designed to be relatively light in structure. Main equipment required for post work treatment, such as a man cage 13, which serves as an erector, a spray robot 14, an excavating machine 14 and a support crane are loaded on the upper stage. The lower stage gantry 10 and the upper stage gentry 12 are separatively connected with a connection rod (equivalent to a train connector). This construction makes it possible to shorten the length of each gantry and reduce the total weight of the whole equipment dramatically.
    • 10. 发明专利
    • TUNNEL EXCAVATOR
    • JPH0396597A
    • 1991-04-22
    • JP23333489
    • 1989-09-08
    • NIPPON KOKI KKTEKKEN CONSTR CO
    • FUTAKI YUKIOSAKAGUCHI FUKUJUKONO TADASHI
    • E21D9/10E21D9/12E21D11/10
    • PURPOSE:To execute tunnel construction by one excavator by installing a folding type scaffold and a concrete sprayer onto the boom of the tunnel excavator with a cutter supported to the boom and muck shifter. CONSTITUTION:When a facing is excavated by driving a cutter 25 and excavation in a fixed section and the carrying-out of much are completed, booms 24 are held horizontally by hydraulic cylinders 28, and a scaffold 12 on the booms 24 is moved to the position of operation. Developing sections 12B are developed to the outside, handrails 13 are mounted, and timberings are assembled by using the scaffold 12 to which a chain 14 is connected. A hydraulic cylinder 9 is shrunk, an injection nozzle 2 is rotated to the position of usage, and the injection nozzle is directed toward each direction and ready-mixed concrete is sprayed against the wall surface of a tunnel. Rock bolts are driven to bedrock from the upper section of the scaffold 12. Accordingly, various work with tunnel construction can be executed by one excavator.