    • 2. 发明专利
    • Segment for tunnel
    • 隧道分段
    • JP2007327174A
    • 2007-12-20
    • JP2006156862
    • 2006-06-06
    • Kajima CorpMeiden Ceramics Corp明電セラミックス株式会社鹿島建設株式会社
    • SUZUKI YOSHINOBUFURUICHI KOSUKEOGITA KIYOBUMIIIDA KENNAGATSU NOBUAKI
    • E21D11/08E21D11/04E21D11/38
    • PROBLEM TO BE SOLVED: To enhance the durability of a segment for a tunnel by effectively suppressing a rapid increase in the temperature of a grouting hole constituting member, a material for constituting a portion to be held, and a concrete layer which is positioned around them.
      SOLUTION: This segment 1 for the tunnel is equipped with a lid member 13 for closing a portion (a member 11 to be held) which is opened on the side of the inner surface of the segment. The lid member 13 is formed of an inorganic material with fireproof/heat-resistant characteristics, and a heat absorbing material composed of an inorganic material is infilled into the backside of the lid member 13. The opened portion functions as at least a grout injection port or a portion to be held.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了通过有效地抑制灌浆孔构成构件的温度的快速增加,用于构成待保持的部分的材料和混凝土层来提高隧道的段的耐久性,该混凝土层是 位于他们周围。 解决方案:用于隧道的该段1装备有用于封闭在段的内表面侧开口的部分(待保持的构件11)的盖构件13。 盖构件13由具有耐火/耐热特性的无机材料形成,并且由无机材料构成的吸热材料填充到盖构件13的背面。开口部至少起着浆料注入口的作用 或要保留的部分。 版权所有(C)2008,JPO&INPIT
    • 3. 发明专利
    • Tunnel segment and tunnel structure
    • 隧道段和隧道结构
    • JP2007177547A
    • 2007-07-12
    • JP2005378403
    • 2005-12-28
    • Kajima CorpMeiden Ceramics Corp明電セラミックス株式会社鹿島建設株式会社
    • SUZUKI YOSHINOBUFURUICHI KOSUKEHAYAKAWA YASUYUKIOGITA KIYOBUMIIIDA KENNAGATSU NOBUAKI
    • E21D11/00E21D11/04E21D11/38
    • PROBLEM TO BE SOLVED: To provide a tunnel segment and a tunnel structure which prevent the outflow of grout, and have a grout injection hole improving fire resistance, heat resistant property, and corrosion resistant property. SOLUTION: The tunnel segment 1 has the grout injection hole 101 penetrating a concrete layer 10, where at least a grout injection inlet (ceramic member 2) of the grout injection hole 101 is made of a ceramic. The tunnel structure is constructed by assembling a plurality of tunnel segments 1a each having the grout injection hole 101 penetrating the concrete layer 10, where at least the grout injection inlet (ceramic member 2) of the grout injection hole 101 is made of a ceramic. When the tunnel segment 1 is used for the tunnel structure, the grout injection hole 101 is sealed with a sealing member (sealing plug 3). COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种防止灌浆流出的隧道段和隧道结构,并且具有提高耐火性,耐热性和耐腐蚀性的注浆孔。 解决方案:隧道段1具有穿透混凝土层10的灌浆注入孔101,其中灌浆注入孔101的至少一个注浆入口(陶瓷构件2)由陶瓷制成。 隧道结构通过组装多个具有渗透注入孔101的混凝土层10的隧道段1a构成,其中至少灌浆注入孔101的注浆入口(陶瓷构件2)由陶瓷制成。 当隧道段1用于隧道结构时,灌浆注入孔101用密封构件(密封塞3)密封。 版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Segment for tunnel and tunnel structure
    • 隧道和隧道结构部分
    • JP2007162432A
    • 2007-06-28
    • JP2005364069
    • 2005-12-16
    • Kajima CorpMeiden Ceramics Corp明電セラミックス株式会社鹿島建設株式会社
    • SUZUKI YOSHINOBUFURUICHI KOSUKEHAYAKAWA YASUYUKIOGITA KIYOBUMIIIDA KENNAGATSU NOBUAKI
    • E21D11/08E21D11/04
    • PROBLEM TO BE SOLVED: To provide a segment for a tunnel which can be grasped and carried and is improved in fire resistance, heat resistance characteristics and corrosion resistance, and also to provide a concrete structure.
      SOLUTION: The segment 1 for the tunnel is provided with an insert member 2 as a coupling member with which a carrying means 5 or an assembling means is coupled. The insert member 2 is formed of ceramic and the coupling member is embedded in a concrete layer of the segment for the tunnel. The tunnel structure is formed by assembling a plurality of the segments 1 for the tunnel. The segment 1 for the tunnel is provided with the insert member 2 formed of ceramic with which the carrying means 5 or the assembling means is coupled. When a female screw 211 of the insert member 2 with which the carrying means 5 or the assembling means is coupled forms an opening in the tunnel, an opening of at least a part of the insert member 2 is sealed by a sealing plug 3 of a sealing member.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种可被抓住并承载的隧道的段,并提高耐火性,耐热性和耐腐蚀性,并提供一种混凝土结构。 解决方案:用于隧道的段1设置有作为联接构件的插入构件2,搭载装置5或组装装置与该构件联接。 插入构件2由陶瓷形成,并且联接构件嵌入在用于隧道的段的混凝土层中。 隧道结构通过组合用于隧道的多个段1而形成。 用于隧道的段1设置有由陶瓷形成的插入构件2,其中承载装置5或组装装置与其相连。 当携带装置5或组装装置与其相连接的插入件2的阴螺纹211形成隧道中的开口时,插入件2的至少一部分的开口被密封塞3密封 密封件。 版权所有(C)2007,JPO&INPIT
    • 5. 发明专利
    • Construction method for fireproof layer, and fireproof structure
    • 防火墙结构方法及防火墙结构
    • JP2007039958A
    • 2007-02-15
    • JP2005224819
    • 2005-08-03
    • Kajima CorpMeiden Ceramics Corp明電セラミックス株式会社鹿島建設株式会社
    • SUZUKI YOSHINOBUFURUICHI KOSUKEHAYAKAWA YASUYUKIOGITA KIYOBUMIIIDA KEN
    • E21D11/10
    • PROBLEM TO BE SOLVED: To enable the film thickness of a fireproof layer to be checked in the construction of the fireproof layer, and to efficiently perform construction without decreasing fire resistance.
      SOLUTION: In this construction method for the fireproof layer, the fireproof layer 3 is formed by spraying and applying a refractory onto the surface of a structure (segment 2). The structure is provided with a thickness-of-layer measuring means 4 with fire resistance, which is embedded in the fireproof layer 3; the installation height of the means 4 is set equal in dimension to the preset thickness of the fireproof layer 3; and the means 4 indicates the thickness of the fireproof layer 3, which is formed in the structure, during spraying and application. The plurality of means 4 are provided. In terms of the means 4, the fireproof layer 3 is formed, for example, in the structure after the provision of a reinforcing material 5 for reinforcing the fireproof layer 3. A surface of the means 4 is appropriately roughened.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了在防火层的结构中检查防火层的膜厚度,并且在不降低耐火性的情况下有效地进行施工。 解决方案:在这种防火层的施工方法中,防火层3通过将耐火材料喷涂并施加在结构体(区段2)的表面上而形成。 该结构设置有耐火层的厚度测量装置4,其被嵌入防火层3中; 装置4的安装高度被设定为与防火层3的预设厚度相等; 装置4表示在喷涂和施加期间在结构中形成的防火层3的厚度。 设置多个装置4。 就装置4而言,防火层3例如形成在设置用于加强防火层3的增强材料5之后的结构中。装置4的表面被适当地粗糙化。 版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • Segment for tunnel
    • 隧道分段
    • JP2010242307A
    • 2010-10-28
    • JP2009088968
    • 2009-04-01
    • Kajima Corp鹿島建設株式会社
    • FURUICHI KOSUKEARAI TAKAHIROTAKIMOTO KUNIHIKOSUZUKI YOSHINOBU
    • E21D11/08E21D11/04E21D11/38
    • PROBLEM TO BE SOLVED: To provide a segment for a tunnel, which can prevent an increase in a repairing portion of a segment body by preventing a temperature rise to the great depth of the segment body, when the temperature of the inside of the tunnel becomes high due to fire etc.
      SOLUTION: The segment for the tunnel is provided with a holding member 11 in which an inside space serving as a hole is formed. A ceramic lid member 20 is attached to the holding member 11. A space filler 23 is provided in the inside space of the holding member 11. The transfer of heat, which is associated with the convection of air in the inside space of the holding member 11, is suppressed with the space filler 23.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了提供一种用于隧道的段,其可以通过防止温度升高到节段主体的大深度来防止段体的修复部分的增加,当内部的温度 隧道由于火等而变高。解决方案:隧道段设有保持构件11,其中形成有用作孔的内部空间。 陶瓷盖构件20附接到保持构件11.在保持构件11的内部空间中设置有空隙填充物23.与保持构件的内部空间中的空气对流相关联的热传递 11,被空间填充物23抑制。版权所有(C)2011,JPO&INPIT
    • 9. 发明专利
    • Joint structure between rings of segment
    • 分支环之间的联合结构
    • JP2008169612A
    • 2008-07-24
    • JP2007003544
    • 2007-01-11
    • Geostr CorpKajima Corpジオスター株式会社鹿島建設株式会社
    • SUZUKI YOSHINOBUARAI TAKAHIROSAITO YUSUKEFUJINO YUTAKASAKUMA YASUSHIYOKOI NOBUAKIONOE SATOSHI
    • E21D11/04
    • PROBLEM TO BE SOLVED: To provide a joint structure between rings of a segment capable of reducing the number of joint hardware arranged on a joint surface between the rings to reduce cost and provided with a mortise requiring no special reinforcing bar for reinforcement.
      SOLUTION: This joint structure 1 divides the performance for sharing load in such a way that the joint hardware 4 shares tensile performance and a partial mortise 3 shares shearing performance. The tensile performance is the performance required at assembly time and demanding only aseismatic performance to reduce the number of joint hardware 4 partially and achieve economical joint structure. A shearing key having a gentle angle of the partial mortise 3 is provided in the vicinity of the center of height of the segment to reduce the number of reinforcing bars to cope with occurrence of crack.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了提供能够减少布置在环之间的接合表面上的接合硬件的数量的节段的环之间的接合结构,以降低成本并提供不需要用于加强的特殊钢筋的榫眼。 解决方案:该联合结构1以共同的硬件4共享拉伸性能和部分榫眼3份剪切性能的方式分割负载的性能。 拉伸性能是组装时所需的性能,并且仅要求抗震性能,部分地减少接头硬件4的数量并实现经济的接头结构。 在片段的高度中心附近设置具有部分榫眼3的平缓角度的剪切键,以减少钢筋的数量以应对裂纹的发生。 版权所有(C)2008,JPO&INPIT