热词
    • 3. 发明专利
    • CONSTRUCTION OF FOUNDATION OF UNDERGROUND CONTINUOUS WALL
    • JPS63176530A
    • 1988-07-20
    • JP776387
    • 1987-01-16
    • KAJIMA CORP
    • SUZUKI KAZUOMURATA TOSHIHIKOMURAO YOSHINORI
    • E02D5/18E02D27/32E02D27/42
    • PURPOSE:To eliminate damage to the cross section of top plate by shortening the setting depth of sheathing materials by a method in which a coping stone serving as guide wall in combination is connected to the top of a sheathing material, the inside of the sheathing material is excavated for an underground continuous wall to the lower end of the top plate, and the top plate is constructed on the head. CONSTITUTION:The ground on both sides of a place where an underground continuous wall is to be constructed is improved while mixing it with a hardener, and sheathing materials 8, e.g., H-steel, etc., are vertically set. Concrete for guide wall 6 in an underground continuous wall construction method is placed up to the height of the excavated face of a top plate 2 in such a way as to bury its head. A coping stone 4 serving as guide wall 6 is provided for the head of the material 3 for connecting and underground continuous wall 1 is constructed to the height of the top plate 2 until a given depth is reached inside of the material 3. The ground surrounded by the material 3 is excavated to the lower end of the top plate, and the top plate 2 is constructed on the wall 1. The needs for shoring strut construction can be eliminated during the excavation of top plate portion, and the construction work can thus be economized.
    • 4. 发明专利
    • Construction of underground wall
    • 地下室施工
    • JPS61142221A
    • 1986-06-30
    • JP26418884
    • 1984-12-14
    • Kajima Corp
    • KUBOTA MUNETAKASATO KAZUONISHIMURA SHIGEKAZUMIZOBUCHI AKIRAMURATA TOSHIHIKOMURAO YOSHINORI
    • E02D5/18E02D5/20
    • E02D5/18
    • PURPOSE:To exactly support horizontal forces to be applied by a method in which a bearing wall, a form box, and a reinforcing bag cage are set in a trench, the bearing walls on both ends of the form box are connected with tie rods, concrete is placed into the form box, and cover plates are set in front of the excavating direction. CONSTITUTION:A given depth of trench 1 is excavated in the ground, and a form box 2 consisting of a bearing wall 3 and side plates 4 and reinforcing bars 6 are integrally penetrated into the trench 1. The form box 2 is fixed with tie rods 10 through the wall 3 by using nuts 11. Concrete 13 is placed in the rare part of the excavating direction of the box 2, and cover plates 14 are set in front of the excavating direction of the box 2 to close the trench 1. The ground in front is excavated. The underground wall can thus be exactly constructed without causing the displacement of the form box because of support by the tie-rods and can withstand the horizontal forces such as soil pressure, etc.
    • 目的:为了通过将轴承壁,形式箱和加强袋保持架设置在沟槽中的方法来精确地支撑水平力,将成型箱两端的支承壁与拉杆连接, 混凝土被放置在形式箱中,并且盖板被设置在挖掘方向的前面。 构成:在地面上挖出一定深度的沟槽1,并将由轴承壁3和侧板4以及钢筋6构成的成形盒2整体地贯穿到槽1中。成型箱2用拉杆 通过使用螺母11,通过壁3将混凝土13放置在箱体2的挖掘方向的罕见部分中,并且将盖板14设置在箱体2的挖掘方向前方以封闭沟槽1。 前面的地面被挖掘。 因此,地下墙可以精确地构造,而不会由于拉杆的支撑而导致成型箱的位移,并能够承受水平力如土压力等。
    • 7. 发明专利
    • COUPLER OF UNDERGROUND CONTINUOUS WALL
    • JPH0790841A
    • 1995-04-04
    • JP24121293
    • 1993-09-28
    • KAJIMA CORP
    • ISHIZAKA MINEMURATA TOSHIHIKOMIYOSHI YUKINORI
    • E02D5/18
    • PURPOSE:To prevent instrusion of paste and debris into a bracket metal by connecting the bracket metal to a horizontal reinforcement, making it free to insert and remove an engagement fitting installed on a coupler into and from the bracket metal and attaching a thin iron plate to close a slit at the time of no insertion. CONSTITUTION:A thin iron plate 7 is fixed on both sides of a slit 3 of a bracket metal 1 by tapping screws 8. At that time, the head end of the thin iron plate 7 is projected in the direction of the slit 3, and both of them are reciprocally butted each other. At the time when an engagement fitting 2 is not inserted into the bracket metal 1, the head end of the thin iron plate 7 is adhered and the slit is closed. When the engagement fitting 2 is inserted from an opening of the bracket metal 1, a coupler plate 6 is adhered at the head end part of the thin iron plate 7. Consequently, at the time of depositing concrete of a following element and drilling, it is possible to prevent instrusion of paste and debris into the bracket metal 1.
    • 9. 发明专利
    • Cast-in-place construction method and excavator
    • 建筑施工方法和挖掘机
    • JP2005126922A
    • 2005-05-19
    • JP2003361012
    • 2003-10-21
    • Kajima CorpRailway Technical Res Inst財団法人鉄道総合技術研究所鹿島建設株式会社
    • YOSHIKAWA TADASHIMURATA TOSHIHIKOTAJIMA SHINICHIKOTAKI YUTAKASAITO SHIGERUKITAMOTO YUKIYOSHIKANDA MASAYUKITANAMURA SHIRONISHIOKA HIDETOSHI
    • E21B7/00E02D5/34
    • PROBLEM TO BE SOLVED: To provide a cast-in-place construction method according to which a stabilizing liquid in an excavated hole is maintained in a good quality condition, and adhesion of mud cake to a hole wall at excavation is prevented or suppressed.
      SOLUTION: The cast-in-place construction method is comprised of the following four steps. In the first step, a rod pipe 24 of an excavator 10 is driven for rotation and lowered, and excavation is carried out by a cutter head 26 arranged on a lower end of the rod pipe. In the second step, the stabilizing liquid is supplied from a lower opening of the rod pipe into the excavated hole 28. In the third step, the stabilizing liquid is supplied from the vicinity of a hole aperture of the excavated hole 28 to the excavated hole. In the fourth step, a suction port of a slurry lifting pump 60 is arranged in the excavated hole in a range of a predetermined height from a deepest bottom of the hole, and the slurry on the bottom of the excavated hole is recovered. According to the method, the above four steps are simultaneously carried out, and thereafter ready mixed-concrete is placed in the excavated hole. Therefore, according to the method, the stabilizing liquid in the excavated hole is maintained in a good quality condition.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种就地施工方法,根据该施工方法,挖掘孔中的稳定液体保持在良好的质量状态,并且防止泥饼粘附到挖掘孔壁上,或者 抑制。

      解决方案:现场施工方法由以下四个步骤组成。 在第一步骤中,驱动挖掘机10的杆管24进行旋转和降低,并且通过设置在杆管的下端的切割头26进行挖掘。 在第二步骤中,将稳定液从杆管的下部开口供给到挖掘孔28.第三工序中,将稳定液从挖掘孔28的孔孔附近供给到挖掘孔 。 在第四步骤中,从开孔的最深底部到预定高度的范围内,在挖掘孔内配置有浆料提升泵60的吸入口,回收挖掘孔底部的浆料。 根据该方法,同时进行上述四个步骤,然后将准备好的混凝土置于挖掘的孔中。 因此,根据该方法,挖掘孔中的稳定液保持在良好的质量状态。 版权所有(C)2005,JPO&NCIPI

    • 10. 发明专利
    • CUTTING METHOD FOR PRECEDING ELEMENT IN WORK EXECUTION METHOD OF UNDERGROUND CONTINUOUS WALL
    • JPH1121880A
    • 1999-01-26
    • JP18112997
    • 1997-07-07
    • KAJIMA CORP
    • MIYOSHI YUKINORIKAJIKURI FUKUTOMEMOTOHASHI KENICHIMURATA TOSHIHIKO
    • E02D5/20
    • PROBLEM TO BE SOLVED: To establish a method for constructing an underground continuous wall which can fabricate simply at a low cost a member to generate cracking when a cutting margin of a preceding element is cut by the crack formation method, resist satisfactorily the fluid pressure when concrete placing is made for the preceding element, does not bring about a drop of the quality of the skeleton, can arrange members equipped with function as a spacer for mild steel bar cages for use at work execution of the preceding element, and has excellent machining efficiency and can enhance the property of executing the machining works. SOLUTION: According to this method for cutting a preceding element, concrete at the end to the preceding element 1 is cut, and a following element is constructed in the space with respect to the preceding element 1. As a member to facilitate crushing the cutting part of the preceding element 1 through formation of cracking in the cutting part, a number of ring-shaped members 5 formed by bundling a plurality of short pipes of a material capable of being cut are installed at a certain spacing in the depth direction in the cutting part, and after the concrete of the preceding element 1 is hardened, the cutting part where the ring-shaped members 5 are arranged is cut.