会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明专利
    • AUTOMOBILE ERECTING CARRIER
    • JPH06212897A
    • 1994-08-02
    • JP2171793
    • 1993-01-14
    • YAMAUCHI KOGYO KK
    • TOKUGAWA JUNICHIYAMAUCHI NORIOHIRANO SHOJI
    • E21D11/40
    • PURPOSE:To reduce operators' works and make the work easy and fast, by mounting an erector and a carrier of support members which can change the deliverying posture on deliverying the support members to the erector, on an automobile carrier. CONSTITUTION:Two support members W, W are held in the state that both arms 4b, 4b of a carrier 4 of support members are directed toward the sides of a carrier 2 and transferred by an erecting carrier 1. When it arrives at the site the frame 4e of the carrier 4 is slid to protrude the support members W, W to the side of carrier 2. Thereafter, the support members are horizontally transferred backward. Next, arms 3a, 3a and catchers 3b, 3b are actuated to receive one support member W and erect the half side of the tunnel arch. And then the second support member is received to erect the rest half side. Then, the support carrier 4, the erector 3, 3, and respective arms 4b, 4b, 3a, 3b, 5a of deck 5 are all drawn in and outriggers 2b-2b are removed to travel for the next work.
    • 7. 发明专利
    • CARRIER FOR WORKING AT HIGH POSITION
    • JPH06212885A
    • 1994-08-02
    • JP2171893
    • 1993-01-14
    • YAMAUCHI KOGYO KK
    • TOKUGAWA JUNICHIYAMAUCHI NORIOHIRANO SHOJI
    • E21B7/02E21B15/00E21B19/08E21D9/10E21C11/02
    • PURPOSE:To increase the efficiency of drilling works or the like at a high position, by providing a horizontally rotatable base through a first rotary mechanism on the upper face of a travelling drive and lifting up the base by an outrigger and further, providing a boom on the base for working at high position. CONSTITUTION:A boom 6 which can transfer a working device up to maximum 25 meters in height is provided at the upper face of the base 4 of a working carrier 1. When the excavating direction of a tunnel is shifted by right angle to the left, after a vertical tunnel T is excavated down to a specified depth, at first, all outriggers 5-5 are projected downward to keep the stretched state of the base 4 against the ground and then the triggers 5-5 are stretched to raise the base 4 upward. Next, the travelling drive 2 is turned almost 90 deg. to the left side and the outriggers 5-5 are pulled in and the base 4 and the travelling drive 2 are lowered. And a first rotary mechanism 3 is turned 90 deg. to the left rotary direction to rotate the base 4 to the left right angle to arrange it in the same direction with the travelling drive 2. And then the horizontal tunnel 12 is excavated by a drilling machine 14.