会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明专利
    • SHIELD SEGMENT
    • JPH08177393A
    • 1996-07-09
    • JP32018194
    • 1994-12-22
    • KAJIMA CORP
    • MATSUSHIMA TERUONAGAMORI KUNIHIRO
    • E21D11/08
    • PURPOSE: To apply a single bolt type structure at the joint of a shield segment used in a shielding work, and maintain superiority in workability, including the half reduction of such a trouble as the appearance of a partial weak point in structure or a cause of water leakage due to a crack at the jointed point of a segment and a bolt box, and the elimination of a trouble for combining a bolt with a nut, and improper tightening due to the concurrent turn of a bolt and a nut. CONSTITUTION: Regarding shield segments 1 and 1 jointed to each other, one shield segment 1 has a coupling face with a bolt box 2 on the internal side of a coupling plate 3 having a bolt hole 2. Also, the other shield segment 1 faced thereto has a coupling face with an internally threaded hole 7 formed out of a buried threaded tube 6. Then, both segments 1 and 1 are jointed to each other by use of a coupling bolt 4.
    • 10. 发明专利
    • SHIELD CONSTRUCTION WORK
    • JPH01174795A
    • 1989-07-11
    • JP32998287
    • 1987-12-28
    • KAJIMA CORP
    • MITSUI TAKASHIMATSUSHIMA TERUO
    • E02D3/12E21D9/06E21D9/12
    • PURPOSE:To aim at stabilization for excavation and solution for a waste earth disposal problem by injecting a cellulose water soluble polymeric thickener independently, or adding bentonite to it, into diggings and then adding a cellulase agent to the diggings. CONSTITUTION:Excavation is put forward while injecting a cellulose water soluble polymeric thickener, for example, carboxymethyl cellulose(CMC) stored in a tank 6 to diggings in a chamber 3 of a closed type shield from a filler hole 5 by a pump 7, and the diggings, whose fluidity grows better, is conveyed via an earth-moving device 4 or the like. A cellulase agent 15 is mixed and added to the diggings in passing through mixing tube 14 installed a discharge end of a sediment pressurefeed pipe 13, and received in a hopper 17, then the CMC is completely decomposed whereby the diggings are restored to the original state. In this connection, injection may be done after adding the bentonite to the CMC.