    • OFFSHORE WIND TURBINE INSTALLATION
    • 海上风力发电机组安装
    • WO2011028102A2
    • 2011-03-10
    • PCT/NL2010/050525
    • 2010-08-23
    • ITREC B.V.ROODENBURG, JoopWIJNING, Diederick BernardusBEREZNITSKI, AlexeiSTIJNMAN, Theodorus Cornelis Joanes Maria
    • ROODENBURG, JoopWIJNING, Diederick BernardusBEREZNITSKI, AlexeiSTIJNMAN, Theodorus Cornelis Joanes Maria
    • B63B35/00
    • B63B35/003B63B1/107B63B27/10B63B27/16B66C23/185B66C23/52Y02E10/727
    • An offshore wind turbine installation vessel for installation of an offshore wind turbine, wherein the wind turbine is of the type to be installed on a foundation that is installed on the seabed prior to the installation of the wind turbine on the foundation, wherein the wind turbine is of the type with a vertical mast to be fitted with its lower end onto the foundation, and with a nacelle with a hub and blades supported on top of said mast, wherein said vessel comprises: - a hull; preferably a non-jack-up type floating hull; preferably a self-propelled floating hull; - a crane structure extending upward from said hull; wherein the crane structure is provided with a hoisting device having one or more wind turbine suspension elements and a wind turbine engagement device supported by said one or more suspension elements and adapted to engage with said wind turbine, said hoisting device being adapted to support and to raise and lower in controllable manner at least the mast of the wind turbine while in vertical orientation; preferably with the nacelle and preferably also with the hub and blades fitted on top of the mast.
    • 一种用于安装海上风力涡轮机的海上风力涡轮机安装容器,其中所述风力涡轮机的类型被安装在安装在海底上的基础上,在风力涡轮机安装在基础之前,其中风力涡轮机 是具有垂直桅杆的类型,其具有将其下端装配到基座上,并且具有支撑在所述桅杆顶部上的毂和叶片的机舱,其中所述船包括: - 船体; 优选非自升式浮式船体; 优选为自行式浮船; - 从所述船体向上延伸的起重机结构; 其中所述起重机结构设置有具有一个或多个风力涡轮机悬挂元件和由所述一个或多个悬架元件支撑并适于与所述风力涡轮机接合的风力涡轮机接合装置的提升装置,所述提升装置适于支撑和 至少在风力发电机的桅杆处于垂直取向时以可控的方式升高和降低; 优选地具有机舱,并且优选地还具有安装在桅杆顶部上的轮毂和叶片。
    • 4. 发明申请
    • DRILLING INSTALLATION AND OFFSHORE DRILLING VESSEL WITH DRILLING INSTALLATION
    • 钻井安装和离岸钻井钻机与钻井安装
    • WO2012087119A1
    • 2012-06-28
    • PCT/NL2011/050863
    • 2011-12-20
    • ITREC B.V.ROODENBURG, JoopWIJNING, Diederick Bernardus
    • ROODENBURG, JoopWIJNING, Diederick Bernardus
    • E21B15/02E21B19/00
    • E21B19/143E21B15/02E21B19/002
    • A dual firing line drilling installation has a drilling tower main structure with four frameworks that are each over a major portion of their height U-shaped in horizontal cross - section. A four-sided central (11) space is present, and along each side of the central space one framework is arranged with its opened vertical side facing the central space. First and second storage devices (25,27) are provided for vertically storing drilling tubulars. The first storage device is housed in a first framework, the second storage device in a second framework. A first hoisting device is supported by a third framework of the drilling tower main structure, to manipulate a string of drilling tubulars in a first firing line (21). A second hoisting device is supported by a fourth framework to manipulate a string of drilling tubulars in a second firing line (23). A first and second pipe racker (29,31) are housed within the drilling tower main structure and adapted to move drilling tubulars while supported in vertical orientation between a storage devices and a firing line.
    • 双点火钻井装置具有钻台主体结构,其四个框架各自在水平横截面上U形的大部分高度上。 存在四面中心(11)空间,并且在中心空间的每一侧上,一个框架被布置成其敞开的垂直侧面向中心空间。 提供第一和第二存储装置(25,27)用于垂直存储钻管。 第一存储设备被容纳在第一框架中,第二存储设备在第二框架中。 第一起重装置由钻塔主结构的第三框架支撑,以在第一起火线(21)中操纵一排钻管。 第二提升装置由第四框架支撑以在第二起火线(23)中操纵一串钻杆。 第一和第二管架(29,31)容纳在钻塔主结构内,并且适于移动钻管,同时在存储装置和起火线之间以垂直取向支撑。
    • 6. 发明申请
    • HOISTING DEVICE
    • 装置装置
    • WO2011034422A2
    • 2011-03-24
    • PCT/NL2010/050596
    • 2010-09-16
    • ITREC B.V.ROODENBURG, JoopWIJNING, Diederick Bernardus
    • ROODENBURG, JoopWIJNING, Diederick Bernardus
    • B66C13/02B63B27/10
    • A multi purpose hoisting device (2) for use on a floating vessel (1) having a deck (22), the hoisting device (2) comprising: - a load bearing structure (6) to be mounted on the vessel (1); - a main hoisting mechanism (8) for raising and lowering an object above the deck (22) of the vessel (1), the main hoisting mechanism (8) comprising: i. at least one main hoisting winch (15,16); ii. an upper cable pulley block (23) supported by the load bearing structure (6); said upper cable pulley block comprising multiple pulleys; iii. a travelling cable pulley block (24) comprising multiple pulleys, provided with an object connecting device for releasable connecting an object to the travelling cable pulley block (24); iv. a main hoisting cable (17) associated with the at least one main hoisting winch (15, 16), which main hoisting cable (17) is passed over the pulleys of the upper cable pulley block (23) and the pulleys of the travelling pulley block (24) in a multiple fall configuration, such that the travelling cable pulley block (24) is moveable relative to the load bearing structure (6) by using the at least one main hoisting winch (15, 16); - a main hoist heave compensation mechanism (19,20,26) associated with the main hoisting cable (17) for damping the effect of sea-state induced motion of the vessel (1) onto an object supported by the main hoisting cable (17).
    • 一种用于具有甲板(22)的浮式船舶(1)上的多用途提升装置(2),所述起重装置(2)包括: - 要安装在所述船舶(1)上的承重结构(6); - 主提升机构(8),用于升高和降低在所述容器(1)的甲板(22)上方的物体,所述主提升机构(8)包括: 至少一台主升降绞车(15,16); II。 由所述承载结构(6)支撑的上缆索滑轮块(23); 所述上缆索滑轮组件包括多个滑轮; III。 包括多个滑轮的行进缆索滑轮块(24),设有用于将物体可释放地连接到行进缆索滑轮块(24)的物体连接装置; IV。 与所述至少一个主提升绞盘(15,16)相关联的主提升缆索(17),所述主提升缆索(17)穿过所述上缆索滑轮块(23)的滑轮和所述行进滑轮 (24),使得所述行进缆索滑轮块(24)能够通过使用所述至少一个主提升绞车(15,16)相对于所述承载结构(6)移动; - 主起重吊索补偿机构(19,20,26),其与主起重缆索(17)相关联,用于阻止船舶(1)的海洋状态引起的运动对主起重缆索(17)支撑的物体的影响 )。
    • 9. 发明申请
    • SEMI-SUBMERSIBLE DRILLING VESSEL, E.G. FOR USE IN A HARSH ENVIRONMENT
    • WO2019160420A1
    • 2019-08-22
    • PCT/NL2019/050108
    • 2019-02-19
    • ITREC B.V.
    • WIJNING, Diederick BernardusROODENBURG, Joop
    • B63B1/10B63B35/44E21B7/128E21B19/14
    • A semi-submersible drilling vessel has a deckbox structure, one or more pontoons, and multiple support columns extending upward from the one or more pontoons and supporting thereon the deckbox structure. An annular riser joints storage caisson extends downwardly from the deckbox structure, wherein the storage caisson delimits an annular storage space configured for storage therein of an annular array of riser joints in vertical orientation thereof. A riser joints carousel device is provided in the annular storage space, which riser joints carousel device is configured to carry an annular array of riser joints in vertical orientation thereof in a mobile manner relative to the annular storage caisson so that the array of riser joints is movable along an annular path through the storage spaced between the inner and outer wall of the storage caisson. The deckbox structure is provided with a riser joint transfer passage at a riser joint transfer location above the annular path of the riser joints carried by the riser joints carousel device through the storage space. The vessel is provided with a riser joint vertical transfer device configured to lift and lower a riser joint out of and into the riser joints carousel device, passing therein vertically through the riser joint transfer passage of the deckbox structure.
    • 10. 发明申请
    • COMBINATION OF A DRILLING INSTALLATION AND A CONTROL AND SIGNAL LINES DEPLOYMENT MODULE AND METHOD OF USE
    • 钻井安装和控制和信号线部署模块的组合以及使用方法
    • WO2017105241A1
    • 2017-06-22
    • PCT/NL2016/050884
    • 2016-12-16
    • ITREC B.V.
    • WIJNING, Diederick BernardusROODENBURG, Joop
    • E21B17/02E21B19/10
    • E21B17/026E21B19/10
    • The present invention relates to a combination a drilling installation for drilling a well and a control and signal lines deployment module, wherein the drilling installation comprises a rig floor slip device which is adapted to be cleared from a well centre opening to create a clear space around the well centre opening. The combination further comprises a temporary workspace floor, which is adapted to be mounted in the clear space at a level below a rig floor surface and to provide a workspace floor for an operator standing in said clear space on said work space floor, allowing said operator to secure at a securing level said one or more control/and or signal lines externally to a second tubulars string suspended from a module slip device.
    • 本发明涉及用于钻井的钻井设备和控制和信号线部署模块的组合,其中钻井设备包括钻井平台滑动装置,该钻井平台滑动装置适于从井中清除 中心开放以在井中心周围形成清晰的空间。 该组合还包括临时工作空间地板,该临时工作空间地板适于安装在钻台底面下方的清空空间中并且为站立在所述工作空间地板上的所述清空空间中的操作员提供工作空间地板,从而允许所述操作员 以将所述一个或多个控制/和/或信号线从外部固定到从模块滑动装置悬挂下来的第二管状物绳上。