会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • OFFSHORE WIND TURBINE INSTALLATION
    • 海上风力发电机组安装
    • WO2011028102A2
    • 2011-03-10
    • PCT/NL2010/050525
    • 2010-08-23
    • ITREC B.V.ROODENBURG, JoopWIJNING, Diederick BernardusBEREZNITSKI, AlexeiSTIJNMAN, Theodorus Cornelis Joanes Maria
    • ROODENBURG, JoopWIJNING, Diederick BernardusBEREZNITSKI, AlexeiSTIJNMAN, Theodorus Cornelis Joanes Maria
    • B63B35/00
    • B63B35/003B63B1/107B63B27/10B63B27/16B66C23/185B66C23/52Y02E10/727
    • An offshore wind turbine installation vessel for installation of an offshore wind turbine, wherein the wind turbine is of the type to be installed on a foundation that is installed on the seabed prior to the installation of the wind turbine on the foundation, wherein the wind turbine is of the type with a vertical mast to be fitted with its lower end onto the foundation, and with a nacelle with a hub and blades supported on top of said mast, wherein said vessel comprises: - a hull; preferably a non-jack-up type floating hull; preferably a self-propelled floating hull; - a crane structure extending upward from said hull; wherein the crane structure is provided with a hoisting device having one or more wind turbine suspension elements and a wind turbine engagement device supported by said one or more suspension elements and adapted to engage with said wind turbine, said hoisting device being adapted to support and to raise and lower in controllable manner at least the mast of the wind turbine while in vertical orientation; preferably with the nacelle and preferably also with the hub and blades fitted on top of the mast.
    • 一种用于安装海上风力涡轮机的海上风力涡轮机安装容器,其中所述风力涡轮机的类型被安装在安装在海底上的基础上,在风力涡轮机安装在基础之前,其中风力涡轮机 是具有垂直桅杆的类型,其具有将其下端装配到基座上,并且具有支撑在所述桅杆顶部上的毂和叶片的机舱,其中所述船包括: - 船体; 优选非自升式浮式船体; 优选为自行式浮船; - 从所述船体向上延伸的起重机结构; 其中所述起重机结构设置有具有一个或多个风力涡轮机悬挂元件和由所述一个或多个悬架元件支撑并适于与所述风力涡轮机接合的风力涡轮机接合装置的提升装置,所述提升装置适于支撑和 至少在风力发电机的桅杆处于垂直取向时以可控的方式升高和降低; 优选地具有机舱,并且优选地还具有安装在桅杆顶部上的轮毂和叶片。
    • 4. 发明申请
    • MARINE PIPELAYING SYSTEM AND METHOD FOR INSTALLING AN OFFSHORE PIPELINE THAT INCLUDES ONE OR MORE ACCESSORIES
    • 海上管道系统和安装海上管道的方法,包括一个或多个附件
    • WO2006085739A1
    • 2006-08-17
    • PCT/NL2005/000093
    • 2005-02-08
    • ITREC B.V.ROODENBURG, JoopDE GROOT, Anne, KlaasWIJNING, Diederick, Bernardus
    • ROODENBURG, JoopDE GROOT, Anne, KlaasWIJNING, Diederick, Bernardus
    • F16L1/14
    • F16L1/19F16L1/14F16L1/207F16L1/23
    • Marine pipelaying method and system for installing an offshore pipeline (1) that includes one or more accessories (10). The method includes the steps of providing a vessel (2), launching the pipeline (1) in a firing line from the vessel (2) in the direction of the seabed, engaging the pipeline (1) with a clamping device (5b) that is connected to the vessel (2) and adapted to support the weight of the previously launched pipeline (1), and moving the accessory (10) into the firing line to a position above the clamping device (5b). Then the accessory (10) is connected to the pipeline (1) above the clamping (5b) device while the pipeline (1) is held by the clamping device (5b) Follow that the accessory (10) and the launched pipeline (1) connected thereto and releasably secured to a controlled load hoisting device (5) and the weight of the accessory (10) and the launched pipeline (1) connected thereto are transferred from the clamping device (5b) to the controlled load hoisting device (5) while the accessory (10) and the launched pipeline (1) connected thereto remain in the firing line. Finally the clamping device (5b) is disengaged from the pipeline (1) and moved away from firing line. Then the accessory (10) and the launched pipeline (1) connected thereto are lowered along the firing line by the controlled load hoisting device (5).
    • 用于安装包括一个或多个附件(10)的海上管道(1)的海上管道铺设方法和系统。 该方法包括以下步骤:提供容器(2),在管线(1)上与管道(1)接合的装置(5b),在管线(1)的沿着海床方向的火线上从管道(2)发射管线(1) 连接到容器(2)并且适于支撑先前发射的管道(1)的重量,并且将附件(10)移动到击发线中到夹紧装置(5b)上方的位置。 然后,在管道(1)由夹紧装置(5b)保持的同时,附件(10)连接到夹紧(5b)装置上方的管道(1),随着附件(10)和推出的管道(1) 连接到其上并可释放地固定到受控负载提升装置(5),并且连接到其上的附件(10)和推出管线(1)的重量从夹紧装置(5b)传送到受控负载提升装置(5) 而附件(10)和与其连接的发射管道(1)保持在点火线中。 最后,夹紧装置(5b)从管道(1)脱离并远离射击线。 然后,连接在其上的附件(10)和发射管线(1)通过受控负载提升装置(5)沿着点火线降低。
    • 5. 发明申请
    • DRILLING INSTALLATION AND OFFSHORE DRILLING VESSEL WITH DRILLING INSTALLATION
    • 钻井安装和离岸钻井钻机与钻井安装
    • WO2012087119A1
    • 2012-06-28
    • PCT/NL2011/050863
    • 2011-12-20
    • ITREC B.V.ROODENBURG, JoopWIJNING, Diederick Bernardus
    • ROODENBURG, JoopWIJNING, Diederick Bernardus
    • E21B15/02E21B19/00
    • E21B19/143E21B15/02E21B19/002
    • A dual firing line drilling installation has a drilling tower main structure with four frameworks that are each over a major portion of their height U-shaped in horizontal cross - section. A four-sided central (11) space is present, and along each side of the central space one framework is arranged with its opened vertical side facing the central space. First and second storage devices (25,27) are provided for vertically storing drilling tubulars. The first storage device is housed in a first framework, the second storage device in a second framework. A first hoisting device is supported by a third framework of the drilling tower main structure, to manipulate a string of drilling tubulars in a first firing line (21). A second hoisting device is supported by a fourth framework to manipulate a string of drilling tubulars in a second firing line (23). A first and second pipe racker (29,31) are housed within the drilling tower main structure and adapted to move drilling tubulars while supported in vertical orientation between a storage devices and a firing line.
    • 双点火钻井装置具有钻台主体结构,其四个框架各自在水平横截面上U形的大部分高度上。 存在四面中心(11)空间,并且在中心空间的每一侧上,一个框架被布置成其敞开的垂直侧面向中心空间。 提供第一和第二存储装置(25,27)用于垂直存储钻管。 第一存储设备被容纳在第一框架中,第二存储设备在第二框架中。 第一起重装置由钻塔主结构的第三框架支撑,以在第一起火线(21)中操纵一排钻管。 第二提升装置由第四框架支撑以在第二起火线(23)中操纵一串钻杆。 第一和第二管架(29,31)容纳在钻塔主结构内,并且适于移动钻管,同时在存储装置和起火线之间以垂直取向支撑。
    • 8. 发明申请
    • OFFSHORE DRILLING VESSEL
    • 海上钻井船
    • WO2009102197A2
    • 2009-08-20
    • PCT/NL2009/000033
    • 2009-02-13
    • ITREC B.V.ROODENBURG, JoopWIJNING, Diederick, Bernardus
    • ROODENBURG, JoopWIJNING, Diederick, Bernardus
    • B63B35/03
    • E21B15/02B63B21/507B63B27/04B63B35/44B63B35/4413B63B2003/147E21B19/002E21B19/004E21B19/006E21B19/02E21B19/09E21B19/143E21B19/155E21B19/16
    • A monohull offshore drilling vessel comprising: a hull having a moonpool; - a multiple firing line hoist system mounted on the hull at said moonpool, the multiple firing line hoist system comprising: - a mast having a top side and a base connected to the hull of the drilling vessel, wherein the mast has a hollow construction with a first side and an opposed second side, - a first hoisting device supported by the mast and having load attachment means displaceable along a first firing line, which extends on the outside of and adjacent to the first side of the mast; - a second hoisting device supported by the mast and having load attachment means displaceable along a second firing line, which on the outside of and adjacent to the second side of the mast; wherein the first and second hoisting devices each include one or more cables and one or more associated winches, the winches preferably disposed in the hollow construction of the mast, to manipulate the position of each of the load attachment devices relative to the mast.
    • 一种单体海上钻井船,包括:具有月球的船体; - 多重点火线葫芦系统,其安装在所述月球上的船体上,所述多膛线升降机系统包括:桅杆,其具有连接到所述钻井船体的船体的顶侧和底座,其中所述桅杆具有中空结构, 第一侧和相对的第二侧, - 由所述桅杆支撑并具有可沿着所述桅杆的第一侧的外侧延伸并沿着所述桅杆的第一侧延伸的第一起落架可移动的负载附接装置的第一起重装置; - 第二起重装置,其由所述桅杆支撑并且具有可沿着所述桅杆的第二侧的外侧并且与所述桅杆的第二侧相邻的第二起火线可移位的负载附接装置; 其中所述第一和第二提升装置各自包括一个或多个电缆和一个或多个相关联的绞车,所述绞盘优选地设置在所述桅杆的中空构造中,以操纵每个所述负载附接装置相对于所述桅杆的位置。
    • 9. 发明申请
    • INSTALLING AN EXPANDABLE TUBULAR IN A SUBSEA WELLBORE
    • 在一个井下安装一个可膨胀的管子
    • WO2009048319A2
    • 2009-04-16
    • PCT/NL2008/000214
    • 2008-10-03
    • ITREC B.V.WIJNING, Diederick, BernardusROODENBURG, Joop
    • WIJNING, Diederick, BernardusROODENBURG, Joop
    • E21B43/10
    • E21B19/22E21B17/20E21B19/143F16L1/202
    • A method and vessel for installing an expandable tubular in a subsea wellbore, wherein said expandable tubular is assembled from expandable tubular segments, said expandable tubular being adapted to be expanded diametrically when positioned in said wellbore by means of expansion tooling, wherein a multitude of expandable tubular segments are provided, and wherein use is made of a surface vessel, said vessel comprising: - at least one assembly station adapted for the assembly of at least one intermediate tubular assembly by interconnection of multiple expandable tubular segments, - an intermediate tubular assembly suspension storage device adapted for storage of one or more intermediate tubular assemblies, said intermediate tubular assemblies being suspended from the vessel into the water by said storage device, - a guide and handling system for intermediate tubular assemblies, said guide and handling system having an entry and an exit, said entry being spaced from said exit, the entry being arranged and adapted to receive a suspended intermediate tubular assembly from the storage device, the system being adapted for the upward feeding of said intermediate tubular assembly from the entry towards a top of the system, and then downwards to the exit, said system further being adapted for launching the intermediate tubular assembly downward from said exit into the water towards and into the wellbore, - a connecting station adapted for connecting an intermediate tubular assembly to another intermediate tubular assembly.
    • 一种用于在海底井筒中安装可膨胀管的方法和容器,其中所述可膨胀管由可膨胀管状管段组装,所述可膨胀管适于在通过膨胀工具定位在所述井眼中时沿径向扩径,其中多个可膨胀管 提供管状部分,并且其中使用表面容器,所述容器包括: - 至少一个组装工位,适于通过多个可膨胀管状部分的互连来组装至少一个中间管状组件, - 中间管状组件悬架 存储装置,其适于存储一个或多个中间管状组件,所述中间管状组件通过所述存储装置从容器悬挂到水中; - 用于中间管状组件的引导和处理系统,所述引导和处理系统具有入口和 出口,所述入口与所述出口间隔开,所述入口 被布置和适于从所述存储装置接收悬挂的中间管状组件,所述系统适于将所述中间管状组件从入口朝向所述系统的顶部向上进给,然后向下进入所述出口,所述系统还包括 适于将所述中间管状组件从所述出口向下发射到所述水中并进入所述井眼; - 适于将中间管状组件连接到另一中间管状组件的连接站。
    • 10. 发明申请
    • MARINE PIPELINE INSTALLATION SYSTEM AND METHODS
    • 海洋管道安装系统和方法
    • WO2007108673A1
    • 2007-09-27
    • PCT/NL2006/000153
    • 2006-03-22
    • ITREC B.V.ROODENBURG, JoopDE GROOT, Anne, KlaasWIJNING, Diederick, BernardusVEHMEIJER, Terence, Willem, August
    • ROODENBURG, JoopDE GROOT, Anne, KlaasWIJNING, Diederick, BernardusVEHMEIJER, Terence, Willem, August
    • F16L1/15F16L1/23
    • F16L1/15B63B35/03F16L1/19F16L1/203F16L1/23
    • A marine pipeline installation system for laying an offshore pipeline and/or installing a subsea riser, the system at least allowing to carry out the reel lay method, wherein the system comprises : one or more storage reels (8) for storage of pipeline (11), a pipeline launch tower (20), a pipeline guide (27) at an elevated position for guiding said pipeline along said tower, one or more tensioners (40,50), each tensioner comprising a tensioner frame and multiple tracks supported by said tensioner frame (41,51), said tracks being adapted for engaging the pipeline and supporting at least part of the weight of the launched pipeline, the tensioner frame (41,51) being supported by said tower via an associated support assembly. The support assembly is adapted to allow for displacement of the tensioner frame (41,51) between an active position, wherein the pipeline launch trajectory extends through the tensioner frame (41,51) between the tracks, and a retracted and non-operable position.
    • 一种用于铺设海上管道和/或安装海底立管的船用管道安装系统,所述系统至少允许执行卷筒铺设方法,其中所述系统包括:用于储存管道(11)的一个或多个存储卷轴(8) ),管道引导塔(20),在升高位置的管道引导件(27),用于沿着塔架引导所述管道,一个或多个张紧器(40,50),每个张紧器包括张紧器框架和由所述托架支撑的多个轨道 张紧器框架(41,51),所述轨道适于接合管道并且支撑所发射管道的重量的至少一部分,张紧器框架(41,51)由所述塔架经由相关联的支撑组件支撑。 支撑组件适于允许张紧器框架(41,51)在活动位置(其中管道发射轨迹延伸穿过轨道之间的张紧器框架(41,51))与收缩和不可操作位置之间的位移 。