会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • DE3105962A1
    • 1981-11-26
    • DE3105962
    • 1981-02-18
    • HITACHI LTD
    • KISHI TUNEOTAKEDA YASUHIDETSUBAKI TORUTAKAHASHI TAKESHI
    • H01H33/88H01H33/02H01H33/42H01H33/64
    • A three-phase combined type circuit breaker is disclosed which comprises a common housing, three-phase interrupting units in said common housing, movable contacts of the interrupting units connected through link mechanisms to operating devices for three phases respectively provided outside of the common housing, the switching operation thus being performed by phase. Rotary shafts are disposed in substantially the same plane in the link mechanisms. Each of the rotary shafts is provided with a connector for the movable contact, a connector for the operating device, and a sealing arrangement positioned between the two connectors for allowing the rotary shaft to rotate while holding the common housing in hermetic condition. This construction makes up a three-phase combined type circuit breaker capable of being operated by phase. The arrangement and construction of the three-phase rotary shafts simplifies maintenance and inspection of the interrupting units and the operating devices.
    • 2. 发明专利
    • FR2476382A1
    • 1981-08-21
    • FR8103092
    • 1981-02-17
    • HITACHI LTD
    • KISHI TUNEOTAKEDA YASUHIDETSUBAKI TORUTAKAHASHI TAKESHI
    • H01H33/02H01H33/88H01H33/42
    • A three-phase combined type circuit breaker is disclosed which comprises a common housing, three-phase interrupting units in said common housing, movable contacts of the interrupting units connected through link mechanisms to operating devices for three phases respectively provided outside of the common housing, the switching operation thus being performed by phase. Rotary shafts are disposed in substantially the same plane in the link mechanisms. Each of the rotary shafts is provided with a connector for the movable contact, a connector for the operating device, and a sealing arrangement positioned between the two connectors for allowing the rotary shaft to rotate while holding the common housing in hermetic condition. This construction makes up a three-phase combined type circuit breaker capable of being operated by phase. The arrangement and construction of the three-phase rotary shafts simplifies maintenance and inspection of the interrupting units and the operating devices.
    • 5. 发明专利
    • GAS-BLAST CIRCUIT BREAKER AND FLUID PRESSURE DRIVE DEVICE THEREOF
    • JPH09161623A
    • 1997-06-20
    • JP32142595
    • 1995-12-11
    • HITACHI LTDHITACHI ELECTRIC SYSTEMS
    • TAKEDA YASUHIDEDAIMON GORONOGAMI TADAHIKOKAWAMOTO HIDEOSADO KOICHIFUKUOKA MASARUTSUBAKI TORU
    • H01H33/34
    • PROBLEM TO BE SOLVED: To eliminate the possibility of a circuit closing operation after opening the circuit even in the case where the circuit opening operation is performed in the imperfect reset condition of a circuit closing pilot valve, and to eliminate the possibility of the pumping operation so as to improve the reliability by providing an unit-pumping valve. SOLUTION: An unti-pumping valve A having a spool 91 is provided, and a drive mechanism 50 of a circuit closing pilot valve 40 is reset by a reset mechanism after a main valve 20 is operated to a circuit closing side at the time of closing the circuit. At this stage, in any condition that a ball valve 41 of the valve 40 is not reset or reset, when the circuit opening command is input in the condition that a circuit closing side operating valve 34 is not reset, a circuit opening pilot drive valve 80 is driven. Consequently, when each valve is operated and the main valve 20 is operated for opening and the circuit closing side operating valve 34 is not reset, the high-pressure fluid is supplied to the valve A, but in the condition that the spool 91 is moved upward, the valve A is driven upward. A flow passage between a secondary side of the valve 34 and a main valve pilot chamber 21 is interrupted, and a main valve spool 22 is operated for opening by the circuit opening operation so as to lower the pressure of the chamber 21. Pumping operation is thereby eliminated so as to improve the reliability.