会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Movable type form device, and construction method of lining concrete
    • 可移动型式装置,以及混凝土结构施工方法
    • JP2013087514A
    • 2013-05-13
    • JP2011229837
    • 2011-10-19
    • Kajima Corp鹿島建設株式会社Gifu Kogyo Co Ltd岐阜工業株式会社
    • NISHIOKA KAZUNORIFUKUYA YOSHINORIKONDO KEIJISHIGENAGA AKIHIROSAKAI GOROOKUBO TSUNEHIDE
    • E21D11/10
    • PROBLEM TO BE SOLVED: To improve quality of lining concrete and to improve efficiency of construction.SOLUTION: A movable type form device 1 includes a portal movable carriage 4 capable of traveling on a bottom surface 3 of a tunnel in a tunnel axial direction, and an arch-shaped form 5 arranged so as to cover the carriage 4 from the upper part and capable of being expanded/reduced in diameter. The form 5 has a two-layer structure comprising a wall 52 connected to the carriage 4 through jacks 55-57, and a panel form 53 detachably attached thereto. The panel form 53 forms a space S for placing concrete with a tunnel inner peripheral surface when expanded. The panel form 53 is supported by the carriage 4 through the wall 52 and supports the concrete inside the space S when mounted on the wall 52. Also, the panel form 53 is placed at a position where the concrete is placed and protects the concrete at the position when detached from the wall 52.
    • 要解决的问题:提高衬砌混凝土的质量,提高施工效率。 解决方案:可移动式成形装置1包括能够沿隧道轴向方向在隧道的底面3上行进的入口移动托架4和拱形形式5,其布置成从托架4覆盖托架4 上部并且能够扩大/缩小直径。 形式5具有两层结构,其包括通过插座55-57连接到托架4的壁52和可拆卸地附接到其上的板形式53。 面板形式53在膨胀时形成用于放置具有隧道内周面的混凝土的空间S. 面板53通过壁52由滑架4支撑,并且当安装在壁52上时将混凝土支撑在空间S内。另外,面板形式53被放置在混凝土放置的位置,并保护混凝土 离开墙壁的位置52.版权所有(C)2013,JPO&INPIT
    • 5. 发明专利
    • Concrete lining installment equipment on tunnel inside wall
    • 隧道内墙混凝土衬砌设备
    • JP2012112200A
    • 2012-06-14
    • JP2010263532
    • 2010-11-26
    • Gifu Kogyo Co LtdKajima Corp岐阜工業株式会社鹿島建設株式会社
    • KAMASHIRO TAKASHIUESUGI YOSIFUMISAKAI GOROTANASE TOMIHIROAOI MASATO
    • E21D11/10
    • PROBLEM TO BE SOLVED: To enable downsizing a concrete injection apparatus that injects concrete to a concrete supply apparatus in the longitudinal direction X of a tunnel by downsizing a feed apparatus 16 of transfer means 15, as a result of the movable distance of a movable supply pipe 4 being made longer than that of a movable pulley 20.SOLUTION: Concrete lining installment equipment on a tunnel inside wall comprises transfer means 15 for moving a concrete supply apparatus which supplies concrete to a wall concrete lining installation frame 2 disposed inside a tunnel in the longitudinal direction X of the tunnel. In the transfer means 15, a feed apparatus 16 having a movable pulley 20 where a flexible pipe 21 connected to a movable supply pipe 4 is looped over, is provided movably in the longitudinal direction X of the tunnel, and in the state where a concrete injection port 25 of the flexible pipe 21 is kept at a fixed position, the movable supply pipe 4 and two movable discharge pipes 11 of the concrete supply apparatus as well as the movable pulley 20 of the feed apparatus 16 are moved in the longitudinal direction X of the tunnel.
    • 要解决的问题:为了通过缩小转移装置15的进给装置16来缩小在隧道的纵向X上将混凝土注入混凝土供应装置的混凝土注射装置,由于可移动距离 可动供给管4制成比可动滑轮20更长的时间。解决方案:隧道内壁上的混凝土衬砌装置设备包括用于移动供应混凝土的混凝土供应装置的转移装置15,该混凝土供应装置将混凝土供应给墙体混凝土衬砌安装框架 2设置在隧道的纵向X的隧道内。 在传送装置15中,具有可移动滑轮20的进给装置16,其中连接到可动供应管4的柔性管21环绕,在隧道的纵向方向X上可移动地设置,并且在混凝土 柔性管21的注入口25保持在固定位置,混合物供给装置的可动供给管4和两个可移动排出管11以及进给装置16的可动滑轮20沿纵向X 的隧道。 版权所有(C)2012,JPO&INPIT
    • 6. 发明专利
    • Method and device for placing lining concrete wall inside tunnel
    • 用于安装内衬混凝土墙的隧道内的方法和装置
    • JP2012036564A
    • 2012-02-23
    • JP2010174438
    • 2010-08-03
    • Kajima Corp鹿島建設株式会社
    • KAMASHIRO TAKASHIUESUGI YOSIFUMISAKAI GORO
    • E21D11/10
    • PROBLEM TO BE SOLVED: To easily place a lining concrete wall inside a tunnel 1.SOLUTION: While moving, in the longitudinal direction of the tunnel 1, a movable supply pipe 4 provided on a peak part of a lining concrete wall placing form 2 disposed inside the tunnel 1 and movable discharge pipes 11 connected to the movable supply pipe 4 on both sides in the width direction Y of the tunnel 1 orthogonal to the longitudinal direction of the tunnel 1 and extended along the lining concrete wall placing form 2 in the circumferential direction R of the tunnel 1 in a placing chamber 3 inside the lining concrete wall placing form 2; concrete supplied by the movable supply pipe 4 is discharged from both movable discharge pipes 11 to the placing chamber 3 inside the lining concrete wall placing form 2; and the concrete is placed successively toward the peak part from the lower side to the upper side of the placing chamber 3. At the time, respective division pipes 14 of both movable discharge pipes 11 are attached and detached at appropriate parts in the circumferential direction R of the tunnel 1 to adjust positions of discharge port parts 11b of both movable discharge pipes 11 in the circumferential direction R of the tunnel 1.
    • 要解决的问题:在隧道1内容易地铺设衬里混凝土墙。解决方案:沿隧道1的纵向方向移动时,设置在衬套的顶部部分上的可动供应管4 设置在隧道1内的混凝土墙壁放置形式2和与隧道1的宽度方向Y两侧正交于隧道1的纵向并沿着衬里混凝土壁延伸的两侧连接到可动供应管4的可移动排放管11 将隧道1的圆周方向R的形式2放置在衬里混凝土墙壁放置形式2内的放置室3中; 由可动供给管4供给的混凝土从两个可移动排出管11排出到衬里混凝土墙放置形式2内部的放置室3; 并且混凝土从放置室3的下侧到上侧依次朝向峰部放置。此时,两个可移动排出管11的各个分隔管14在圆周方向R的适当部分被安装和拆卸 以调整两根可移动排出管11的排出口部分11b在隧道1的圆周方向R上的位置。版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Concrete for dike and method for constructing dike
    • 用于构建自行车的混凝土和方法
    • JP2010173928A
    • 2010-08-12
    • JP2009022021
    • 2009-02-02
    • Kajima Corp鹿島建設株式会社
    • SAKATA NOBORUOI ATSUSHISAKAI GOROOUCHI HITOSHIGOKAN JUNJITAMURA KAZUHISAYASUDA KAZUHIROTAKADA ETSUHISA
    • C04B28/02C04B18/00C04B24/18C04B24/32C04B24/34E02B7/08
    • PROBLEM TO BE SOLVED: To improve freeze thawing resistance of concrete using low quality aggregate, and to provide a concrete dike using the concrete as the surface layer part.
      SOLUTION: In the concrete for a dike in which a ratio of water to a binder is 40-60%, the ratio s/a of fine aggregate is 20-45%, and the total of unit aggregate quantity is 1,850-2,200 kg/m
      3 , the low quality aggregate whose water absorption prescribed in JIS A1110:2006 is >3% and ≤6%, is used as at least one or more kinds of coarse aggregate to be used. Further, an AE water reducing agent and an AE agent are added, and also, a defoamant of 0.001-0.05% is added by the mass ratio to the binder so as to adjust an air content to 4-7%. The concrete can be used for a part or the whole of the external concrete of the dike.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提高使用低质量骨料的混凝土的抗冻融性,并使用混凝土作为表层部分提供混凝土堤防。

      解决方案:在水与粘合剂的比例为40-60%的堤坝混凝土中,细骨料的比例s / a为20-45%,单体总量为1,850- 作为至少一种以上使用的粗骨料,使用JIS A1110:2006中规定的吸水率为3%以下且≤6%以下的低质量骨料,为2,200kg / m 3 。 此外,添加AE减水剂和AE剂,并且通过质量比与粘合剂相加,添加0.001-0.05%的消泡剂以将空气含量调节至4-7%。 混凝土可用于堤坝外部混凝土的一部分或全部。 版权所有(C)2010,JPO&INPIT

    • 10. 发明专利
    • Filling detection sensor and filling detection method
    • 填充检测传感器和填充检测方法
    • JP2004301616A
    • 2004-10-28
    • JP2003094049
    • 2003-03-31
    • Kajima Corp鹿島建設株式会社
    • SAKAI GOROYAMAGUCHI KENICHIROFUKUDA ATSUSHIIKETANI TAKESHI
    • G01F23/18
    • PROBLEM TO BE SOLVED: To surely detect a filled condition every time when concrete or the like touches a sensor or dissociates, even if the concrete or the like repeats touching/dissociating actions.
      SOLUTION: The sensor 1 composed of a differential pressure detection unit 23, pressure transmission pipes 19, pressure transmission materials 27, pressure sensing parts 37, an outer box 21, filling-in materials 29, etc., are put at a part where the detection of the concrete or the like is desired. When the concrete 7 is deposited in a mould, the sensing parts 37a, 37b in the sensor 1 sense pressures outside the sensor 1. The sensed pressures are transmitted via the transmission pipe 19a in which the transmission material 27a has been filled up and sealed, and the transmission pipe 19b in which the transmission material 27b has been filled up and sealed, to pressure sensing parts 41a and 41b. and the sensing unit 23 detects the differential pressure between the pressures by the two sensing parts 37. The detected differential pressure is recorded/displayed on a display unit, and on the basis of this the filled condition of the concrete 7 is determined.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:即使混凝土或类似物重复接触/解离动作,当混凝土等接触传感器或解离时,也可以确保检测填充状态。 解决方案:将由差压检测单元23,压力传递管19,压力传递材料27,压力感测部件37,外部箱体​​21,填充材料29等组成的传感器1放置在 需要检测混凝土等的部分。 当混凝土7沉积在模具中时,传感器1中的感测部分37a,37b感测传感器1外部的压力。所感测的压力经由传输管道19a传输,其中传输材料27a已被填充和密封, 和传输材料27b已经被填充和密封的传输管19b连接到压力传感部分41a和41b。 感测单元23检测由两个检测部件37的压力之间的差压。检测到的差压被记录/显示在显示单元上,并且基于此,确定混凝土7的填充状态。 版权所有(C)2005,JPO&NCIPI