会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明公开
    • METHOD AND STRUCTURE FOR LAYING COMMUNICATION CABLE IN UNDERGROUND LINE, AND MEMBERS USED FOR LAYING
    • 方法和装置用于铺设电信电缆地下管线所使用的安装组件
    • EP1309054A4
    • 2005-07-20
    • EP01954478
    • 2001-08-07
    • ASHIMORI IND CO LTDSANKI ENG CO LTD
    • SETO ICHIROTSUCHIYA FUMIAKIYAGI ISABUROAZUMA KATSUHIKOKISHIBE NOBUYASUASO KOJIUEDA YASUHIRO
    • G02B6/50H02G1/06H02G1/08H02G9/06G02B6/00H02G9/00
    • H02G1/06G02B6/502G02B6/508H02G1/08H02G9/06
    • A method of laying a communication cable (16) capable of laying an optical fiber cable (20) in an underground line such as a sewage line without applying a direct tension to the cable and without loosening the cable, capable of laying the optical fiber cables (20) on the upper side of the line for a main line allowing a plurality of optical fiber cables (20) to be laid therein, and eliminating the need for an expensive robot in the laying operation, comprising the steps of disposing highly strong and low extendable tension members (25, 26, 27) slidably in longitudinal direction of the optical fiber cables (20, 21, 22), pulling the tension members (25, 26, 27) into the underground line (1) by pulling, and applying a tension to a trunk tension member (25) between manholes (2) and (3) to stretch the trunk tension member (25) generally linearly in the underground line (1) so as to lay the optical fibers (20, 21, 22) on the upper side of the underground line (1), wherein a tension is applied to the branch tension members (26, 27) in branch pipes (4, 5) so as to prevent the branch optical fiber cables (21, 22) from being loosened in the branch pipes.
    • 提供了一种用于铺设通信电缆的铺设方法(16),其允许铺设地下管道的光纤电缆(20):如污水管既不放置直接张力也不对它们允许松弛,以及用于主管,其中多个 要被铺设光缆(20)的,所述方法因此允许在管道内的上部空间铺设光缆(20)和以消除昂贵的机器人用于铺设操作的需要。 在所提出的敷设方法中,高强度低伸长张力构件被设置成沿着每个光纤电缆(20,21,22)和所述张力构件的长度方向上滑动(25,26,27)被绘制 入地下管线(1)以张紧躯干张力构件(25)由此拉伸躯干张力构件(25)基本上是直的在地下管道(1),因此,光纤电缆(20,21,22)被放置 在地下管道内的上部空间(1)。 所以分支张力构件(26,27)中的分支管被张紧(4,5)铺设在支管的光纤光缆(21,22)而不允许松弛。
    • 7. 发明专利
    • Method of constructing heat medium circulation system
    • 建立热介质循环系统的方法
    • JP2014088992A
    • 2014-05-15
    • JP2012238953
    • 2012-10-30
    • Chubu Electric Power Co Inc中部電力株式会社Sanki Eng Co Ltd三機工業株式会社Ashimori Ind Co Ltd芦森工業株式会社
    • SAKURABA ICHIROOKI SHIGEOMAEKAWA KOICHIROSHIBATA KAZUMATAKAI HIROKIUEMURA SATOSHINAKAOKA MASASHIAZUMA KATSUHIKOKISHI KOHEI
    • F24F5/00E04B1/76F25B41/00
    • PROBLEM TO BE SOLVED: To provide a method of constructing a heat medium circulation system capable of circulating a heat medium by using an air-cooled heat pump chiller while utilizing an existing piping space.SOLUTION: A heat medium circulation system 11 including an air-cooled heat pump chiller 12, is replaced for an existing heat medium circulation system 2 including an underground refrigeration machine 3, a roof floor cooling tower 4, a first circulation passage 6 for circulating a refrigerant cooled by the refrigeration machine 3 to each of air conditioners 5, and a second circulation passage 7 composed of a pair of vertical pipes 8 and circulating cooling water between the refrigeration machine 3 and the cooling tower 4. That is, the air-cooled heat pump chiller 12 is installed on a roof floor, an upper portion and a lower portion of each of the vertical pipes 8 are opened, a heating insulating hose 13 is inserted into each vertical pipe 8, and end portions of the hose 13 are fixed to connection fittings 21 mounted on both end portions of the vertical pipe 8, to connect the air-cooled heat pump chiller 12 or the first circulation passage 6.
    • 要解决的问题:提供一种构建能够利用空气冷却式热泵制冷机同时利用现有管道空间来循环热介质的热介质循环系统的方法。解决方案:一种热介质循环系统11, 冷却式热泵制冷机12被替换为现有的热介质循环系统2,其包括地下制冷机3,屋顶冷却塔4,用于将由制冷机3冷却的制冷剂循环到每个空调器的第一循环通道6 5,以及由制冷机3和冷却塔4之间的一对立管8和循环冷却水构成的第二循环通路7.也就是说,风冷式热泵冷水机12安装在屋顶, 每个垂直管8的上部和下部都被打开,加热绝缘软管13插入每个垂直管8中,软管13的端部固定 连接到安装在垂直管8的两端部的连接配件21,以连接风冷式热泵制冷机12或第一循环通道6。
    • 8. 发明专利
    • Method for laying optical fiber cable
    • 光纤电缆布线方法
    • JP2005346105A
    • 2005-12-15
    • JP2005207948
    • 2005-07-19
    • Ashimori Engineering Co LtdAshimori Ind Co LtdSanki Eng Co Ltd三機工業株式会社芦森エンジニアリング株式会社芦森工業株式会社
    • SEDO ICHIROTSUCHIYA FUMIAKIYAGI ISABUROAZUMA KATSUHIKO
    • G02B6/46H02G1/06
    • PROBLEM TO BE SOLVED: To provide a method for laying an optical fiber cable with which the optical fiber cable can be laid in an underground pipe line such as a sewer without applying tension directly to the optical fiber cable, and the optical fiber cables can be laid on the upper side in the pipe line to the sewer in which two or more optical fiber cables are to be laid, and moreover, an expensive robot is not necessary for laying work. SOLUTION: The optical fiber cable 20 is laid on the upper side in the underground pipe line 1 by arranging a tension member 25 of high strength and low elongation property so that it is slidable in the longitudinal direction, drawing the tension member 25 into the underground pipe line 1, and stretching the member almost linearly in the underground pipe line by applying tension to the tension member 25 between manholes 2, 3, and then, the tension member 25 and the optical fiber cable 20 are pressurized on the inner wall of the sewer 1 by a ring-form diameter expanders 50, 52. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种敷设光纤电缆的方法,可以将光纤电缆铺设在诸如下水道的地下管线中,而不会直接向光纤电缆施加张力,并且光纤 电缆可以放置在管线的上侧,到要铺设两根或更多条光纤电缆的下水道,此外,昂贵的机器人不需要铺设工作。 解决方案:通过布置具有高强度和低伸长率的张力构件25使光纤电缆20在纵向方向上可滑动,将拉伸构件25放置在地下管线1的上侧 进入地下管线1,并且通过向沙井2,3之间的张力构件25施加张力而在地下管线中几乎线性地拉伸构件,然后将张力构件25和光缆20在内部加压 (C)2006,JPO&NCIPI(C)2006年,JPO&NCIPI