会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • PRODUCER WELL PLUGGING FOR IN SITU COMBUSTION PROCESSES
    • 在现场燃烧过程中生产出井口堵塞
    • US20100139915A1
    • 2010-06-10
    • US12328344
    • 2008-12-04
    • Wayne Reid Dreher, JR.Wendell Peter Menard
    • Wayne Reid Dreher, JR.Wendell Peter Menard
    • E21B43/24
    • E21B43/243
    • Methods and apparatus relate to controlling location of inflow into a production well during in situ combustion. The production well includes intervals closable to the inflow at identified times. Once a combustion front from the in situ combustion passes one of the intervals, a blockage conveyed from surface into the production well forms a barrier to the inflow at the interval that has been passed by the combustion front. An example of the blockage includes a cement plug delivered through coiled tubing into the production well, which may include production tubing that defines the intervals based on at least two consecutive alternating lengths of solid wall sections and slotted or perforated sections of the production tubing.
    • 方法和装置涉及在现场燃烧期间控制流入生产井的位置。 生产井包括在确定的时间可以流入的间隔。 一旦来自原位燃烧的燃烧前沿通过其中一个间隔,则从表面传送到生产井中的堵塞在以燃烧前沿通过的间隔处形成对流入物的阻挡。 堵塞的示例包括通过连续油管输送到生产井中的水泥塞,其可以包括限定基于至少两个连续交替长度的实心壁段和生产管的开槽或穿孔部分的间隔的生产管。
    • 5. 发明申请
    • IN SITU CATALYTIC UPGRADING
    • 在现场催化升级
    • US20120227966A1
    • 2012-09-13
    • US13410891
    • 2012-03-02
    • Wayne Reid Dreher, JR.Joe D. AllisonWendell P. MenardThomas J. Wheeler
    • Wayne Reid Dreher, JR.Joe D. AllisonWendell P. MenardThomas J. Wheeler
    • E21B43/24E21B43/12
    • E21B43/243E21B36/04E21B43/305
    • A system and method for in situ upgrading of crude oil is provided. The system includes at least one injection well, at least two first production wells, and at least one second production well. The at least one injection well has a vertical portion and a plurality of non-vertical portions connected to the vertical portion. The at least two first production wells are preferably equi-spaced and each has a horizontal portion with a first axial direction, wherein each said horizontal portion of the first production wells is horizontally spaced apart. The at least one second production well has a horizontal portion with a second axial direction. The catalytic reactor is placed at the horizontal portion of the at least one second production well such that oil coming through the second production well will first go through the catalytic reactor for hydroprocessing.
    • 提供了原油原位升级的系统和方法。 该系统包括至少一个注入井,至少两个第一生产井和至少一个第二生产井。 至少一个注入井具有连接到垂直部分的垂直部分和多个非垂直部分。 所述至少两个第一生产井优选为等间隔的,并且每个具有第一轴向方向的水平部分,其中第一生产井的每个所述水平部分水平间隔开。 所述至少一个第二生产井具有具有第二轴向方向的水平部分。 将催化反应器放置在至少一个第二生产井的水平部分,使得通过第二生产井的油将首先经过用于加氢处理的催化反应器。
    • 7. 发明授权
    • Producer well lugging for in situ combustion processes
    • 生产井适用于原位燃烧过程
    • US07793720B2
    • 2010-09-14
    • US12328344
    • 2008-12-04
    • Wayne Reid Dreher, Jr.Wendell Peter Menard
    • Wayne Reid Dreher, Jr.Wendell Peter Menard
    • E21B43/243
    • E21B43/243
    • Methods and apparatus relate to controlling location of inflow into a production well during in situ combustion. The production well includes intervals closable to the inflow at identified times. Once a combustion front from the in situ combustion passes one of the intervals, a blockage conveyed from surface into the production well forms a barrier to the inflow at the interval that has been passed by the combustion front. An example of the blockage includes a cement plug delivered through coiled tubing into the production well, which may include production tubing that defines the intervals based on at least two consecutive alternating lengths of solid wall sections and slotted or perforated sections of the production tubing.
    • 方法和装置涉及在现场燃烧期间控制流入生产井的位置。 生产井包括在确定的时间可以流入的间隔。 一旦来自原位燃烧的燃烧前沿通过其中一个间隔,则从表面传送到生产井中的堵塞在以燃烧前沿通过的间隔处形成对流入物的阻挡。 堵塞的示例包括通过连续油管输送到生产井中的水泥塞,其可以包括限定基于至少两个连续交替长度的实心壁段和生产管的开槽或穿孔部分的间隔的生产管。