    • PRODUCER WELL PLUGGING FOR IN SITU COMBUSTION PROCESSES
    • 在现场燃烧过程中生产出井口堵塞
    • US20100139915A1
    • 2010-06-10
    • US12328344
    • 2008-12-04
    • Wayne Reid Dreher, JR.Wendell Peter Menard
    • Wayne Reid Dreher, JR.Wendell Peter Menard
    • E21B43/24
    • E21B43/243
    • Methods and apparatus relate to controlling location of inflow into a production well during in situ combustion. The production well includes intervals closable to the inflow at identified times. Once a combustion front from the in situ combustion passes one of the intervals, a blockage conveyed from surface into the production well forms a barrier to the inflow at the interval that has been passed by the combustion front. An example of the blockage includes a cement plug delivered through coiled tubing into the production well, which may include production tubing that defines the intervals based on at least two consecutive alternating lengths of solid wall sections and slotted or perforated sections of the production tubing.
    • 方法和装置涉及在现场燃烧期间控制流入生产井的位置。 生产井包括在确定的时间可以流入的间隔。 一旦来自原位燃烧的燃烧前沿通过其中一个间隔,则从表面传送到生产井中的堵塞在以燃烧前沿通过的间隔处形成对流入物的阻挡。 堵塞的示例包括通过连续油管输送到生产井中的水泥塞,其可以包括限定基于至少两个连续交替长度的实心壁段和生产管的开槽或穿孔部分的间隔的生产管。
    • 4. 发明授权
    • Producer well lugging for in situ combustion processes
    • 生产井适用于原位燃烧过程
    • US07793720B2
    • 2010-09-14
    • US12328344
    • 2008-12-04
    • Wayne Reid Dreher, Jr.Wendell Peter Menard
    • Wayne Reid Dreher, Jr.Wendell Peter Menard
    • E21B43/243
    • E21B43/243
    • Methods and apparatus relate to controlling location of inflow into a production well during in situ combustion. The production well includes intervals closable to the inflow at identified times. Once a combustion front from the in situ combustion passes one of the intervals, a blockage conveyed from surface into the production well forms a barrier to the inflow at the interval that has been passed by the combustion front. An example of the blockage includes a cement plug delivered through coiled tubing into the production well, which may include production tubing that defines the intervals based on at least two consecutive alternating lengths of solid wall sections and slotted or perforated sections of the production tubing.
    • 方法和装置涉及在现场燃烧期间控制流入生产井的位置。 生产井包括在确定的时间可以流入的间隔。 一旦来自原位燃烧的燃烧前沿通过其中一个间隔,则从表面传送到生产井中的堵塞在以燃烧前沿通过的间隔处形成对流入物的阻挡。 堵塞的示例包括通过连续油管输送到生产井中的水泥塞,其可以包括限定基于至少两个连续交替长度的实心壁段和生产管的开槽或穿孔部分的间隔的生产管。