会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • METHOD AND APPARATUS FOR HANDLING A HSDPA HANDOVER WITHIN A MOBILE COMMUNICATIONS NETWORK
    • 用于在移动通信网络中处理HSDPA切换的方法和装置
    • WO2007039352A1
    • 2007-04-12
    • PCT/EP2006/065629
    • 2006-08-24
    • SIEMENS AKTIENGESELLSCHAFTGARTNER, BeateSTADLER, ThomasUNTEREGGER, Burghard
    • GARTNER, BeateSTADLER, ThomasUNTEREGGER, Burghard
    • H04L12/56
    • H04W36/02H04L49/90H04W28/14H04W36/0055H04W72/1242H04W88/08
    • The invention relates to a method and an apparatus for handling a handover of a transmission connection between a user equipment and a network node within a mobile communications network. An aspect of the invention is a method for handling a handover of a transmission connection between a user equipment and a network node within a mobile communications network, whose serving radio cells serving the user equipment provide control information on shared control channels, whereby during the handover a limited amount of shared control channels are monitored by the user equipment. Hereby a first part of the amount of shared control channels is associated with a first serving radio cell and a second part of said amount of shared channels is associated with a second serving radio cell, over that the transmission connection should be handed. In particular data packets regarding the transmission connection in priority queues (Prio 1, Prio 2) in the network node (Node B 2) are reordered with respect to said transmission connection. Preferably, corresponding reordering the content of the priority queues are maintained by the user equipment. A further aspect of the invention lies in corresponding network nodes and/or entities, e.g. control entity, base station (Node B), radio network controller (RNC) comprising means for performing the above mentioned method.
    • 本发明涉及一种用于处理移动通信网络内的用户设备与网络节点之间的传输连接切换的方法和装置。 本发明的一个方面是一种用于处理用户设备与移动通信网络内的网络节点之间的传输连接的切换的方法,移动通信网络中服务用户设备的服务无线小区提供共享控制信道上的控制信息,由此在切换期间 用户设备监视有限数量的共享控制信道。 因此,共享控制信道量的第一部分与第一服务无线电小区相关联,并且所述数量的共享信道的第二部分与第二服务无线电小区相关联,因为传输连接应该被传递。 特别地,关于网络节点(节点B 2)中的优先级队列(Prio 1,Prio 2)中的传输连接的数据分组相对于所述传输连接重新排序。 优选地,用户设备维护对应的优先级队列的内容的重新排序。 本发明的另一方面在于相应的网络节点和/或实体,例如, 控制实体,基站(Node B),无线电网络控制器(RNC),其包括用于执行上述方法的装置。
    • 5. 发明申请
    • A METHOD OF CONTROLLING UPLINK POWER LEVEL
    • 控制上电功率电平的方法
    • WO2005125040A2
    • 2005-12-29
    • PCT/GB2005002200
    • 2005-06-07
    • SIEMENS AGBREUER VOLKERCHAPMAN THOMASUNTEREGGER BURGHARD
    • BREUER VOLKERCHAPMAN THOMASUNTEREGGER BURGHARD
    • H04B7/005H04B7/00
    • H04W52/40H04W52/146H04W52/16H04W52/286
    • A method of controlling uplink power level in a terminal (1) of a communication system, wherein the terminal transmits on a first uplink channel type (8) to a first base station (2) and transmits in soft handover on a second uplink channel type (9) to the first base station and to a second or subsequent base station (3, 4) comprises receiving power control commands at the terminal on a downlink dedicated channel (5, 6, 7) from each base station. The uplink power level for the first and second uplink channel type (8, 9) is adapted, wherein the downlink dedicated channel (7) from the first base station provides power control commands for the first uplink channel type; and wherein the downlink dedicated channel (5, 6) from the second and subsequent base station (3, 4) provides power control commands for the second uplink channel type.
    • 一种在通信系统的终端(1)中控制上行链路功率电平的方法,其中所述终端在第一上行链路信道类型(8)上发送到第一基站(2),并以第二上行链路信道类型的软切换发送 (9)到第一基站和第二或后续基站(3,4)包括在每个基站的下行链路专用信道(5,6,7)上的终端处接收功率控制命令。 适用于第一和第二上行链路信道类型(8,9)的上行链路功率电平,其中来自第一基站的下行链路专用信道(7)为第一上行链路信道类型提供功率控制命令; 并且其中来自所述第二和后续基站(3,4)的所述下行链路专用信道(5,6)为所述第二上行链路信道类型提供功率控制命令。
    • 8. 发明申请
    • MITIGATION OF CELL SIGNALING LOAD CAUSED BY TRACKING AREA UPDATES
    • 通过跟踪区域更新导致的细胞信号负载减轻
    • WO2008006774A1
    • 2008-01-17
    • PCT/EP2007/056852
    • 2007-07-05
    • NOKIA SIEMENS NETWORKS GMBH & CO. KGFEHRINGER, ManfredUNTEREGGER, Burghard
    • FEHRINGER, ManfredUNTEREGGER, Burghard
    • H04Q7/38
    • H04W60/04H04W48/12
    • The invention concerns handling of a user equipment (UEl; UE2; UE3) moving within at least one cellular mobile telecommunication network from a first tracking area (TAl) to a further tracking area (TA2), wherein the user equipment, initially in a first tracking area (TAl) of a cellular mobile telecommunication network, receives from the network -first tracking area information (TAl), indicating a first area comprising a first group of cells (TAl: cell 1, cell 4, cell 5), -first cell ID information concerning the cell (cell 1) in which the user equipment is, and -first additional cell ID information (UE3 : -, UE2 : "cell 2", UE 1: "cell 2, cell 3") concerning cells which are outside the first tracking area wherein the user equipment, later in the further tracking area (TA2), only triggers a tracking area update if - the first tracking area information (TAl) and a further tracking area information (TA2) are not equal and - a further cell ID information (cell 2) is not found in a previously stored list of first additional cell ID information.
    • 本发明涉及在至少一个蜂窝移动电信网络中从第一跟踪区域(TA1)移动到另一跟踪区域(TA2)的用户设备(UE1; UE2; UE3)的处理,其中,用户设备 蜂窝移动电信网络的跟踪区域(TA1)从网络接收指示包括第一组小区(TA1:小区1,小区4,小区5)的第一区域的第一跟踪区域信息(TA1),第一 关于用户设备的小区(小区1)的小区ID信息,以及关于小区的小区ID信息和关于小区的小区ID信息(UE3: - ,UE2:“小区2”,UE 1:“小区2,小区3”) 在第一跟踪区域之外,其中稍后在另一跟踪区域(TA2)中的用户设备仅在 - 第一跟踪区域信息(TA1)和另外的跟踪区域信息(TA2)不相等时才触发跟踪区域更新,并且 - 在之前没有找到另外的小区ID信息(小区2) 第一个额外的小区ID信息的存储列表。
    • 9. 发明申请
    • HANDOVER UND GLEICHZEITIG STATTFINDENDE NEUKONFIGURATION IN EINEM MOBILFUNKKOMMUNIKATIONSSYSTEM
    • 切换和并发的重新配置移动通信系统
    • WO2008003713A1
    • 2008-01-10
    • PCT/EP2007/056741
    • 2007-07-04
    • NOKIA SIEMENS NETWORKS GMBH & CO. KGFEHRINGER, ManfredKUNZ, WalterUNTEREGGER, BurghardVESELY, Alexander
    • FEHRINGER, ManfredKUNZ, WalterUNTEREGGER, BurghardVESELY, Alexander
    • H04Q7/38
    • H04W36/06
    • Die Erfindung betrifft ein Verfahren zum Betreiben eines Funkkommunikationssystems, bei welchem ein Handover einer Teilnehmerstation (UE) von einer ersten Funkzelle (S1) zu einer zweiten Funkzelle (S2) erfolgt. Zur Kommunikation mit der Teilnehmerstation (UE) wird in der ersten Funkzelle (S1) ein erstes Zuordnungsmuster und in der zweiten Funkzelle (S2) ein hiervon unterschiedliches zweites Zuordnungsmuster verwendet, wobei die Zuordnungsmuster jeweils eine Zuordnung von Teilen von an die Teilnehmerstation (UE) versendeten Nachrichten zu Kanälen ermöglichen. Während des Handovers überträgt eine Steuereinrichtung (RNC) an die Teilnehmerstation (UE) zu versendende Daten an eine gemeinsame Einrichtung (NodeB), welche die erste Funkzelle (S1) und die zweite Funkzelle (S2) versorgt. Hierbei sind die an die gemeinsame Einrichtung (NodeB) übertragenen Daten derart zusammengesetzt, dass eine Versendung an die Teilnehmerstation (UE) alternativ unter Verwendung des ersten Zuordnungsmusters oder unter Verwendung des zweiten Zuordnungsmusters möglich ist. Weiterhin betrifft die Erfindung ein Funkkommunikationssystem zur Durchführung des Verfahrens.
    • 本发明涉及一种操作无线通信系统的一种方法,其中从第一无线电小区(S1)用户站(UE)的到第二无线电小区(S2)的切换被执行。 用于与所述用户站(UE)(S1)的第一分配模式和第二无线电小区(S2)通信被用于在所述第一无线小区中的其不同的第二分配模式,其中在每种情况下所发送的用户台的部分的分配的分配模式(UE) 允许消息信道。 在切换控制装置(RNC)发送到用户站(UE)的数据要被发送到一个共同的设备(节点B),其提供第一无线电小区(S1)和第二无线电小区(S2)。 这里,对公共设备(节点B)是由使得传输到用户站(UE)另一种可能是使用第一映射图案或使用所述第二分配模式发送的数据的。 此外,本发明涉及一种无线通信系统,用于执行该方法。