会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Light source module and projection apparatus
    • 光源模块和投影设备
    • US09152031B2
    • 2015-10-06
    • US13606013
    • 2012-09-07
    • Ching-Chuan WeiShu-Min ChenHao-Wei ChiuKo-Shun Chen
    • Ching-Chuan WeiShu-Min ChenHao-Wei ChiuKo-Shun Chen
    • G03B21/00G03B21/20G02B26/00G02B27/10G03B33/08G02B27/28H04N9/31
    • G03B21/2073G02B26/008G02B27/1033G02B27/283G02B27/286G03B21/204G03B33/08H04N9/3167H04N9/3197
    • A light source module includes a light-emitting device, a wavelength conversion device and a polarization and color separation unit. The light-emitting device provides an excitation beam including a first portion beam having a first polarization direction. The wavelength conversion device includes a first wavelength conversion area and a polarization conversion area. When the first portion beam irradiates the first wavelength conversion area, the first portion beam is converted into a first color beam. When the first portion beam irradiates the polarization conversion area, the first polarization direction of the first portion beam is converted to a second polarization direction. The polarization and color separation unit is disposed between the wavelength conversion device and the light-emitting device, and transmits the first portion beam with the first polarization direction, and reflects the first portion beam with the second polarization direction and the first color beam to the same direction.
    • 光源模块包括发光器件,波长转换器件和偏振和颜色分离单元。 发光装置提供包括具有第一偏振方向的第一部分光束的激发光束。 波长转换装置包括第一波长转换区域和偏振转换区域。 当第一部分光束照射第一波长转换区域时,第一部分光束被转换成第一彩色光束。 当第一部分光束照射偏振转换区时,第一部分光束的第一偏振方向被转换为第二偏振方向。 偏振和分色单元设置在波长转换装置和发光装置之间,并且透射具有第一偏振方向的第一部分光束,并将具有第二偏振方向的第一部分光束和第一彩色光束反射到 同方向
    • 5. 发明申请
    • WRENCH WITH SLIDBALE OPERATION MEMBERS FORMING MULITPLE CLAMPING OPTIONS
    • 带有滑动操作部件的扳手形成多重夹紧选项
    • US20170001285A1
    • 2017-01-05
    • US14790000
    • 2015-07-02
    • Shu-Min Chen
    • Shu-Min Chen
    • B25B13/18
    • B25B13/12B25B13/08
    • A wrench includes a body having two openings. The body has a chamber in which two operation members are movably located. Each operation member has a first jaw and a second jaw respectively formed on two ends thereof. The first jaws each have a first face protruding out from the first opening. The second jaws each have a second face protruding out from the second opening. Two resilient members are located in the chamber and bias the two operation members to let the two first jaws and the two second jaws are opened wide. The first and second jaws each have slots which are engaged with the lips on each of the openings. The first jaws protruding from the opening form an open wrench, and the second jaws protruding from the other opening form another open wrench.
    • 扳手包括具有两个开口的主体。 主体具有一个室,其中两个操作构件可移动地定位。 每个操作构件具有分别形成在其两端的第一钳口和第二钳口。 第一夹爪各自具有从第一开口突出的第一面。 第二钳口各自具有从第二开口突出的第二面。 两个弹性构件位于腔室中并且偏置两个操作构件以使两个第一钳口和两个第二钳口打开得很宽。 第一和第二钳口各自具有与每个开口上的唇缘接合的槽。 从开口突出的第一个夹爪形成一个开放的扳手,而另一个开口的第二个卡爪形成另一个开放的扳手。
    • 10. 发明授权
    • Heuristics for efficient supply chain planning in a heterogeneous production line
    • 在异质生产线上实现高效供应链计划的启发式
    • US06920366B1
    • 2005-07-19
    • US10793406
    • 2004-03-04
    • Ann LuhShu-Min ChenAndy HongOliver WuKathy Wang
    • Ann LuhShu-Min ChenAndy HongOliver WuKathy Wang
    • G06F19/00
    • G06Q10/06
    • A computer integrated manufacturing system executes a program process that performs a capacity planning method that allocates usage of a plurality of manufacturing elements of a manufacturing enterprise by major and minor apparatus, squeezing for overhead cost consideration, and site balance for maintain basic operation. The program process begins by receiving at least one fabrication forecast describing scheduling and types of product lots that are predicted to be fabricated within a first period of time by the manufacturing enterprise from at least one order management system of the manufacturing enterprise. Rolling statistics of products lots fabricated during a second period of time are retrieved from a data retention device of the computer integrated manufacturing system. Capacity planning for the allocation of the product lot predicted to be fabricated by the manufacturing elements is performed.
    • 计算机一体化制造系统执行程序处理,该程序执行通过主要和次要装置分配制造企业的多个制造要素的使用的容量规划方法,挤压间接成本考虑以及用于维持基本操作的场地平衡。 程序过程开始于接收至少一个制造预测,描述由制造企业从制造企业的至少一个订单管理系统预测在第一时间段内制造的调度和类型的产品批次。 从计算机集成制造系统的数据保持装置检索在第二时间段期间制造的产品批次的滚动统计。 执行预期由制造元件制造的产品批次的分配的容量规划。