会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 43. 发明专利
    • PULSE DOPPLER ULTRASONIC WAVE FLOW VELOCITY MEASURING EQUIPMENT
    • JPH11108721A
    • 1999-04-23
    • JP27083797
    • 1997-10-03
    • HITACHI LTD
    • OKAMURA TOMOYOSHIYAMADA MASAYUKIKATAKURA KAGEYOSHI
    • G01F1/66
    • PROBLEM TO BE SOLVED: To reduce the attenuation of an ultrasonic wave signal in a flow route wall and to increase the S/N of the signal so as to improve measuring accuracy by directly exposing an ultrasonic wave transmitting/receiving device in the flow route. SOLUTION: An ultrasonic wave transmitting/receiving device 5 is fixed to a flow route wall 1 by a screw or adhesive, the tip surface 5a thereof is exposed in the inner surface of the flow route wall 1 while being prevented from being projected from an inner surface wall 1a and set to a height equal to that of the inner surface wall 1a. A voltage pulse to be measured is outputted from a signal processor 3 according to a flow velocity and a measuring distance, converted into an ultrasonic wave 6 having the same frequency by a piezoelectric element 5b and then transmitted from the transmitting/receiving device end surface 5a. In this case, since the ultrasonic wave 6 is radiated into a fluid without being passed through the flow route wall 1, the attenuation of the ultrasonic wave caused by the flow route wall 1 is prevented, and the strong ultrasonic wave 6 is radiated into the fluid. The pulse-like ultrasonic wave 6 is dispersed and reflected by fine particles 7 in the fluid, and a reflected wave 8 is directly received by the transmitting/receiving device 5 without being attenuated by the flow route wall 1. Thus, S/N during measuring is increased, and flow velocity measuring accuracy is improved.
    • 45. 发明专利
    • PRECEDING STAND-BY VERTICAL PUMP
    • JPH1030588A
    • 1998-02-03
    • JP18751996
    • 1996-07-17
    • HITACHI LTD
    • YAMAGUCHI AKIRAYAZAWA SETSUOYAMADA MASAYUKIKIMURA JINJIMATSUI SHIRO
    • F04D13/00
    • PROBLEM TO BE SOLVED: To discharge water in a pump in an early stage during stand-by operation after pumping is stopped by arranging a first communicating hole on a pumping pipe and the like, and communicating one end of an air vent pipe whose the other end is connected to an air vent hole arranged on the front and rear parts of a discharging valve, with the atmosphere on the upper part of the maximum water level of a discharging tank. SOLUTION: A discharging pipe 7 is connected to a discharging elbow 6 connected to a pumping pipe 5 and an intermediate bearing support 9 through a discharging valve 8. An air vent pipe 16 provided with an opening part 19 is connected to an air vent hole 15 arranged on the rear downstream side of the heights discharging valve 8 of the discharging pipe 7. Openings 10 are arranged as a first opening on the pumping pipe 5 and the intermediate bearing support 9 respectively. When pumping is stopped and stand-by operation is carried out, water in a pump is held in the pumping pipe 5 by rotation of an impeller 1. But air flows from the air vent pipe 16, the inside of the pump is opened to the atmosphere in an earlier stage, and thereby, water held in the pump is rapidly discharged from the openings 10 arranged on the pumping pipe 5 and the intermediate bearing support 9.
    • 46. 发明专利
    • VERTICAL SHAFT PUMP AND PUMPING UNIT
    • JPH08284874A
    • 1996-10-29
    • JP8533595
    • 1995-04-11
    • HITACHI LTD
    • YAMAGUCHI AKIRAYAZAWA SETSUOYAMADA MASAYUKI
    • F04D15/00F04D13/00
    • PURPOSE: To provide a vertical shaft pump and a pumping unit, eliminating any delay in the start of pumping (discharge), reducing a burden to be imposed on an impeller, and making power consumption during standby operation reducible and capable of restraining a rise in water temperature in a lifting pipe. CONSTITUTION: A vertical shaft pump 20 set up in a pump suction tank 21 opens a drain hole 9 on top of an impeller 1 of a casing runner 2, and it is provided with a drainpipe 10 whose one end is connected to this drain hole 9 and the other end is connected to an on-off device opening or closing in linkage with a water level of the suction tank. In addition, an air vent hole 15 opening to an more upper part than the central line is installed in a horizontal part of a delivery pipe 7 of a pumping plant, and further it is provided with a bypass pipe 16 whose one end is connected to this air vent hole 15 and the other end is opened to an more upper part than a design highest water level DHWL of a delivery water tank.
    • 48. 发明专利
    • VERTICAL SHAFT PUMP PROVIDED WITH DOUBLE VOLUTE CASING
    • JPH0763196A
    • 1995-03-07
    • JP20625893
    • 1993-08-20
    • HITACHI LTD
    • AKIBA HIDEKIYAZAWA SETSUOTAKADA KUNIONAGASAWA SHIGENOBUYAMADA MASAYUKI
    • F04D5/00F04D29/44
    • PURPOSE:To reduce a required installation space and to smooth water flow by forming a partition wall, which is situated between two passages in a casing and separates them from each other, of steel material. CONSTITUTION:A double volute casing is provided with two passages, in which water flows setting a shaft center of a pump as the center, and these two passages are separated from each other by a partition wall 1 spirally extending from one point on the outside of an impeller. A passage outlet part of the casing consists of an upper partition wall supporting plate 2 and a lower partition wall supporting plate 3, each of which individually extends from the upper end or the lower end of the partition wall 1 to both of right and left sides, and an outside passage wall 4 and an inside passage wall 5, both of which are formed into U-shapes, while setting the steel thick partition wall 1 as the center. The outside passage wall 4 and the inside passage wall 5 consist of steel plates which is considerably thinner than the partition wall 1. Therefore, the thickness of the partition wall 1 can be reduced in comparison with a concrete wall, and the size of the casing can be reduced by this thinned portion. On the other hand, a change in flow velocity of water in the tip part of the partition wall 1 splitting the water flow is reduced, so that a loss in a pump head can be reduced.