会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • COMPUTER-BASED SUPPLIER KNOWLEDGE MANAGEMENT SYSTEM AND METHOD
    • 基于计算机的供应商知识管理系统和方法
    • WO2017182982A1
    • 2017-10-26
    • PCT/IB2017/052286
    • 2017-04-20
    • LAPIERRE, Stephany
    • LAPIERRE, Stephany
    • G06Q10/08G06F17/30
    • G06Q10/06313G06F16/24573G06Q10/067G06Q10/087
    • Provided is a computer-based supplier knowledge management method, system, and computer program product. The system embodies the computer program code which, when executed performs the method. The method includes establishing an electronic profile for one or more users from an entity; establishing an electronic supplier profile for each of a plurality of suppliers, each supplier profile comprising a set of supplier keywords; generating an electronic RFI by an entity user, the RFI comprising a set of user specified RFI keywords corresponding to a project; and electronically processing the RFI, including performing keyword matching between the RFI keywords and one or more of the supplier profiles and generating a list of candidate suppliers for the project based, at least in part, on the keyword matching.
    • 提供了一种基于计算机的供应商知识管理方法,系统和计算机程序产品。 该系统体现了当被执行时执行该方法的计算机程序代码。 该方法包括为来自实体的一个或多个用户建立电子配置文件; 为多个供应商中的每个供应商建立电子供应商简档,每个供应商简档包括一组供应商关键字; 由实体用户生成电子RFI,所述RFI包括对应于项目的一组用户指定的RFI关键字; 以及以电子方式处理RFI,包括执行RFI关键词与一个或多个供应商简档之间的关键字匹配,并至少部分地基于关键字匹配来生成项目的候选供应商列表。
    • 4. 发明申请
    • DEVICE, SYSTEM, AND METHOD FOR TRACKING JOB MANAGEMENT
    • 用于跟踪作业管理的设备,系统和方法
    • WO2017160532A1
    • 2017-09-21
    • PCT/US2017/021160
    • 2017-03-07
    • COOL WIND VENTILATION CORP.
    • GRASSO, DominicSULLIVAN, DavidJENNINGS, LindaMARIN, Joseph
    • G06Q10/00
    • G06Q10/063114G06F17/50G06Q10/06313
    • A device, system, and method tracks a job management. The method performed by a central processing server includes receiving a layout drawing of an installation job, the layout drawing including a plurality of components to be installed at a work site. The method includes receiving status information of the components as a status of the components is updated. The method includes dynamically updating a current status for each of the components upon receiving the status information. The method includes receiving a request for a status update from a user device for a selected component of the components. The method includes determining the current status of the selected component. The method includes transmitting, by the server, the current status of the selected component to the user device.
    • 设备,系统和方法追踪作业管理。 由中央处理服务器执行的方法包括接收安装作业的布局图,该布局图包括要安装在工作现场的多个部件。 该方法包括在组件的状态被更新时接收组件的状态信息。 该方法包括在接收到状态信息时动态更新每个组件的当前状态。 该方法包括从用户设备接收针对组件的选定组件的状态更新的请求。 该方法包括确定所选组件的当前状态。 该方法包括由服务器将所选组件的当前状态发送给用户设备。
    • 5. 发明申请
    • INFRASTRUCTURE BENCHMARKING BASED ON DYNAMIC COST MODELING
    • 基于动态成本建模的基础设施基准
    • WO2017003496A1
    • 2017-01-05
    • PCT/US2015/048697
    • 2015-09-04
    • APPTIO, INC.
    • AURADKAR, Rahul V.HAYMAN, Edward, MarkTIJERINA, DavidKRISHNAN, Venkatesh
    • G06Q10/06G06Q30/06
    • G06Q10/06313G06Q10/06375
    • Embodiments are directed towards infrastructure benchmarking based on dynamic cost modeling. Raw customer models that represent a customer's business system may be ingested into a benchmarking system and mapped to customer models based on one or more standard models. Benchmarking information that may be generated from one or more community models that are one or more customer models of other customers that may be available to the benchmarking application. Additional third-party information, such as, industry survey information may also be used for generating benchmarking information. The benchmarking information may be used to generate reports that include comparisons between one or more customer models and the one or more community models. The benchmarking information may be continuously updated based on changes to customer models and/or data, community models and/or data, external information.
    • 实施例针对基于动态成本建模的基础设施基准测试。 代表客户业务系统的原始客户模型可能会被吸收到基准测试系统中,并根据一个或多个标准模型映射到客户模型。 将可能由一个或多个社区模型生成的基准信息作为基准测试应用程序可用的其他客户的一个或多个客户模型。 另外的第三方信息,如行业调查信息也可用于生成基准信息。 基准信息可用于生成包括一个或多个客户模型与一个或多个社区模型之间的比较的报告。 可以基于对客户模型和/或数据,社区模型和/或数据,外部信息的改变来不断更新基准测试信息。
    • 9. 发明申请
    • Quoting Tool and Design Module for Continuous Emission Monitoring Systems
    • 引用连续排放监测系统的工具和设计模块
    • WO2016081497A1
    • 2016-05-26
    • PCT/US2015/061148
    • 2015-11-17
    • JM-STANLEY LLC
    • WANG, Shanglong
    • G06F17/50
    • G06Q10/06313G06Q30/018
    • Disclosed is a quoting tool and a design module for continuous emission monitoring system (CEMS). In one embodiment, the quoting tool is accessible via a website, and provides an interactive user interface for receiving user input and a request for a quote. When the quote is calculated and approved, the user input is used to automatically generate design drawings via the design module, which utilizes CAD API programming. Each of the quoting tool and the design module receives optimization input from a knowledge base to minimize errors and increase quality. The finalized design drawings are used to create bill of materials for assembling CEMS products. Because the instant invention streamlines the process of calculating quotes and drafting design drawings, the present system is configured to reduce project lead times and labor associated therewith.
    • 公开了连续排放监测系统(CEMS)的引用工具和设计模块。 在一个实施例中,引用工具可通过网站访问,并提供用于接收用户输入和报价请求的交互式用户界面。 当报价计算和批准时,用户输入用于通过使用CAD API编程的设计模块自动生成设计图纸。 引用工具和设计模块中的每一个都从知识库接收最优化输入,以最小化错误并提高质量。 最终的设计图纸用于组装CEMS产品的材料清单。 因为本发明简化了计算报价和绘制设计图纸的过程,所以本系统被配置为减少项目交货时间和与之相关联的劳动。
    • 10. 发明申请
    • SYSTEMS AND METHODS DETERMINING A BIT TRIPPING SCHEDULE AND BIT SELECTION BASED ON TOTAL COST OF DRILLING
    • 系统和方法根据钻探总成本确定位移程序和位选择
    • WO2015173657A3
    • 2016-03-17
    • PCT/IB2015001499
    • 2015-04-27
    • KUESTERS ANDREAWINGATE JOHNISRAEL RIAZCOCKBURN COLIN
    • KUESTERS ANDREAWINGATE JOHNISRAEL RIAZCOCKBURN COLIN
    • E21B44/00
    • G06Q10/06312E21B44/00G06Q10/06313
    • Some embodiments of a method for optimizing drilling include determining at least one section of a wellbore for which to determine a schedule for replacing one or more drill bits during drilling the wellbore. Some embodiments of the method also include determining one or more constraints on the schedule for replacing the one or more drill bits. Some embodiments of the method also include determining, based on the one or more constraints, a plurality of scenarios for replacing the one or more drill bits during drilling the at least one section. Some embodiments of the method include determining, by one or more processors, a total cost for each scenario in the plurality of scenarios. Some embodiments of the method include identifying at least one scenario in the plurality of scenarios that has the lowest cost compared to other ones of the plurality of scenarios.
    • 用于优化钻井的方法的一些实施例包括确定井眼的至少一个部分,以在钻井期间确定用于替换一个或多个钻头的计划表。 该方法的一些实施例还包括确定用于替换一个或多个钻头的计划的一个或多个约束。 该方法的一些实施例还包括基于所述一个或多个约束来确定在钻取所述至少一个部分期间替换所述一个或多个钻头的多个场景。 该方法的一些实施例包括由一个或多个处理器确定多个情景中的每个场景的总成本。 该方法的一些实施例包括识别与多个场景中的其他场景相比具有最低成本的多个场景中的至少一个场景。