会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • SYSTEMS AND METHODS DETERMINING A BIT TRIPPING SCHEDULE AND BIT SELECTION BASED ON TOTAL COST OF DRILLING
    • 系统和方法根据钻探总成本确定位移程序和位选择
    • WO2015173657A2
    • 2015-11-19
    • PCT/IB2015/001499
    • 2015-04-27
    • KUESTERS, AndreaWINGATE, JohnISRAEL, RiazCOCKBURN, Colin
    • KUESTERS, AndreaWINGATE, JohnISRAEL, RiazCOCKBURN, Colin
    • G06Q10/06312E21B44/00G06Q10/06313
    • Some embodiments of a method for optimizing drilling include determining at least one section of a wellbore for which to determine a schedule for replacing one or more drill bits during drilling the wellbore. Some embodiments of the method also include determining one or more constraints on the schedule for replacing the one or more drill bits. Some embodiments of the method also include determining, based on the one or more constraints, a plurality of scenarios for replacing the one or more drill bits during drilling the at least one section. Some embodiments of the method include determining, by one or more processors, a total cost for each scenario in the plurality of scenarios. Some embodiments of the method include identifying at least one scenario in the plurality of scenarios that has the lowest cost compared to other ones of the plurality of scenarios.
    • 用于优化钻井的方法的一些实施例包括确定井眼的至少一个部分,以在钻井期间确定用于替换一个或多个钻头的计划表。 该方法的一些实施例还包括确定用于替换一个或多个钻头的计划的一个或多个约束。 该方法的一些实施例还包括基于所述一个或多个约束来确定在钻取所述至少一个部分期间替换所述一个或多个钻头的多个场景。 该方法的一些实施例包括由一个或多个处理器确定多个情景中的每个场景的总成本。 该方法的一些实施例包括识别与多个场景中的其他场景相比具有最低成本的多个场景中的至少一个场景。
    • 2. 发明申请
    • SYSTEMS AND METHODS DETERMINING A BIT TRIPPING SCHEDULE AND BIT SELECTION BASED ON TOTAL COST OF DRILLING
    • 系统和方法根据钻探总成本确定位移程序和位选择
    • WO2015173657A3
    • 2016-03-17
    • PCT/IB2015001499
    • 2015-04-27
    • KUESTERS ANDREAWINGATE JOHNISRAEL RIAZCOCKBURN COLIN
    • KUESTERS ANDREAWINGATE JOHNISRAEL RIAZCOCKBURN COLIN
    • E21B44/00
    • G06Q10/06312E21B44/00G06Q10/06313
    • Some embodiments of a method for optimizing drilling include determining at least one section of a wellbore for which to determine a schedule for replacing one or more drill bits during drilling the wellbore. Some embodiments of the method also include determining one or more constraints on the schedule for replacing the one or more drill bits. Some embodiments of the method also include determining, based on the one or more constraints, a plurality of scenarios for replacing the one or more drill bits during drilling the at least one section. Some embodiments of the method include determining, by one or more processors, a total cost for each scenario in the plurality of scenarios. Some embodiments of the method include identifying at least one scenario in the plurality of scenarios that has the lowest cost compared to other ones of the plurality of scenarios.
    • 用于优化钻井的方法的一些实施例包括确定井眼的至少一个部分,以在钻井期间确定用于替换一个或多个钻头的计划表。 该方法的一些实施例还包括确定用于替换一个或多个钻头的计划的一个或多个约束。 该方法的一些实施例还包括基于所述一个或多个约束来确定在钻取所述至少一个部分期间替换所述一个或多个钻头的多个场景。 该方法的一些实施例包括由一个或多个处理器确定多个情景中的每个场景的总成本。 该方法的一些实施例包括识别与多个场景中的其他场景相比具有最低成本的多个场景中的至少一个场景。