会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明申请
    • A PROCESS FOR THE PRODUCTION OF PANELS FOR CLADDING FORMED BY A CONGLOMERATE OF MINERALS AND SPECIAL AGGREGATES MIXED WITH TWO-COMPONENT ADHESIVE AND/OR THERMOSETTING RESINS
    • 一种生产由矿物和特殊聚集体形成的层压板与两组分粘合剂和/或热固性树脂混合的方法
    • WO2009005384A2
    • 2009-01-08
    • PCT/PT2008/000027
    • 2008-07-04
    • LABICER - LABORATÓRIO INDUSTRIAL CERÂMICO, S.A.SUTIL SARAIVA, Marco
    • SUTIL SARAIVA, Marco
    • B29C67/24C04B18/16
    • B29C67/243C04B26/10Y02W30/94Y02W30/95C04B18/14C04B18/16C04B40/0032C04B40/0259C04B40/0263C04B2103/54C04B18/165
    • The present invention relates to a process for the production of a plate or panel formed exclusively by the result of the agglomeration and compaction of selected minerals and special aggregates originating from the surplus or residues of the ceramic industry with two-component adhesives resulting from the mixture of two different resins and/or thermosetting resins, within the resinous conglomerate industry. During this process the residues are stored in silos (No.1), transported via belts (No.2) to intermediate silos (No.3) from where they are distributed to discontinuous mixers (No.4) in which they are added the two- component adhesive through a dosing pump (No.5) forming a compound. After homogenisation, the compound is transported via belts (No.6) and placed on a dosing machine (No.7), which distributes it onto a belt (No.8) where it is compressed in rollers (No.9), transported via a belt (No.10) into the press (No.11) where it is cold-pressed and then sent to the drier (No.12), where it hardens and from where it is placed in mobile storage (No.13) in order to achieve the specifications required in a high end product for paving and cladding.
    • 本发明涉及一种制造板或板的方法,其特征在于,所述板或板仅由所选择的矿物质的聚集和压实的结果形成,并且由来自陶瓷工业的剩余或残余物的特殊聚集体与由混合物产生的双组分粘合剂 的两种不同的树脂和/或热固性树脂,在树脂砾石工业中。 在此过程中,残留物储存在筒仓(No.1)中,通过皮带(No.2)运输到中间筒仓(No.3),从中分配到不连续混合器(No.4),将它们添加到 双组分粘合剂通过配料泵(5号)形成化合物。 均化后,化合物通过皮带(No.6)输送并放置在定量给料机(No.7)上,分配到带(8号)上,在辊(9号)中被压缩,运送 通过一个带(10号)进入压机(11号),在那里它被冷压,然后送到干燥器(No.12),在那里它变硬并从放置在移动存储器(13号) ),以达到用于铺路和包层的高端产品所需的规格。