会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • TRACK CIRCUIT POWER SUPPLY VITAL MONITOR
    • 跟踪电路电源监视器
    • WO2015019129A1
    • 2015-02-12
    • PCT/IB2013/056517
    • 2013-08-09
    • ALSTOM TRANSPORT TECHNOLOGIES
    • AISA, Pier Alessandro
    • B61L1/18B61L1/20
    • B61L1/181B61L1/187B61L1/188B61L1/20
    • A power supply vital monitor for track circuits for railway systems comprising a track segment (11), said track segment being separated from adjacent segments (12) by electric joints (2). Each track segment comprises a signal transmitting unit (3) and receiving units (4) for transmitting and receiving train presence detection signals and/or transmitting or receiving communication signals between the train (7) and the track segment (11). The transmitting unit (3) and receiving units (4) are connected to a common power supply line (5). To avoid an erroneous clearing of an occupied status caused by spurious signals on the power supply line affecting reception of the train detection signals, each receiving unit (4) comprises at least two parallel signal processing channels, a first (41) and a second (42) channel, which connects the receiver (411, 421) with the corresponding track circuit and with a power supply sensor (412, 422) connected to the power supply line (5). Switches enable and disable connections of the receivers to the corresponding track circuit and to the corresponding power supply sensor.
    • 一种用于铁路系统的轨道电路的电源重要监视器,包括轨道段(11),所述轨道段通过电接头(2)与相邻段(12)分离。 每个轨道段包括用于在列车(7)和轨道段(11)之间发送和接收列车存在检测信号和/或发送或接收通信信号的信号发送单元(3)和接收单元(4)。 发送单元(3)和接收单元(4)连接到公共电源线(5)。 为了避免由于影响列车检测信号的接收的电源线上的杂散信号引起的占用状态的错误清除,每个接收单元(4)包括至少两个并行信号处理通道,第一(41)和第二( 42)通道,其将接收器(411,421)与相应的轨道电路连接,以及连接到电源线(5)的电源传感器(412,422)。 开关启用和禁用接收器与对应的轨道电路和相应的电源传感器的连接。
    • 2. 发明申请
    • VERFAHREN UND VORRICHTUNG ZUR ERKENNUNG EINES SCHIENENBRUCHES
    • 方法和设备检测中的铁轨断裂的
    • WO2013010867A1
    • 2013-01-24
    • PCT/EP2012/063547
    • 2012-07-11
    • SIEMENS AKTIENGESELLSCHAFTDIETRICH, KlausDÄBRITZ, AndreasHUNGER, Steffen
    • DIETRICH, KlausDÄBRITZ, AndreasHUNGER, Steffen
    • B61L1/18B61L23/04
    • B61L1/181B61L23/044
    • Die Erfindung betrifft ein Verfahren zur Erkennung eines Schienenbruches in einer Fahrschiene eines Gleisabschnittes. Dabei wird ein durch die Fahrschiene verlaufender elektrischer Stromkreis gebildet. Ferner wird eine mit dem Stromkreis zusammenhängende elektrische Größe, die sich bei Vorliegen eines Schienenbruches messbar ändert, gemessen. Erfindungsgemäß wird der elektrische Stromkreis durch den Betriebsstromkreis für ein auf dem Gleisabschnitt betriebenes elektrisches Triebfahrzeug gebildet. Die Erfindung betrifft ferner eine Vorrichtung zur Durchführung des Verfahrens, welches mit dem Betriebsstromkreis gekoppelte Messwandler zur Erfassung von den Wert der elektrischen Größe repräsentierenden Messdaten, eine Zentrale zur Auswertung der Messdaten und ein System zur Übertragung der Messdaten von den Messwandlern zur Auswertungs zentrale aufweist. Hierdurch wird ein zuverlässiges und kostengünstiges Verfahren und Vorrichtung zur Erkennung von Schienenbrüchen bereitgestellt, die mit beliebigen Gleisfreimeldesystemen eingesetzt werden können.
    • 本发明涉及一种用于在轨道段的轨道检测铁轨断裂的方法。 在此,形成由驱动电路运行的轨道。 此外,与电路电量,在中的铁轨断裂的存在下可测量的变化,测得的连续的。 根据本发明,电路被操作电路,用于在轨迹截面电力牵引车辆运行形成。 本发明还涉及一种用于执行所述方法,其被耦合到所述操作电路换能器,用于检测表示测量数据,对测量数据的评价中心局并用于从所述换能器的测量数据的传输用于评估具有中央系统中的电量的值。 这提供了用于检测轨道断裂,其可以与任何火车检测系统中使用的可靠和具有成本效益的方法和装置。
    • 5. 发明申请
    • SYSTEM AND METHOD FOR DETECTING RAIL BREAK/VEHICLE
    • 用于检测断路器/车辆的系统和方法
    • WO2007067708A1
    • 2007-06-14
    • PCT/US2006/046763
    • 2006-12-07
    • GENERAL ELECTRIC COMPANYANDERSON, Todd, Alan
    • ANDERSON, Todd, Alan
    • B61L23/04B61L1/18
    • B61L23/044B61L1/181
    • A system for detecting a rail break or train occupancy includes a current source adapted to deliver a current to an isolated block of a rail track. A voltage sensor is coupled to the isolated block and configured to detect voltage across the isolated block. A shunt device is coupled to the isolated block and configured to receive a shunt current from the current delivered by the current source. A shunt current sensor is coupled to the shunt device and adapted to detect the shunt current flowing through the shunt device. A control unit is adapted to receive input from the voltage sensor and the shunt current sensor and to monitor a variation of the shunt current with respect to the voltage to detect the rail break or train occupancy.
    • 用于检测断路或火车占用的系统包括适于将电流传递到轨道的隔离块的电流源。 电压传感器耦合到隔离块并且被配置为检测跨隔离块的电压。 分流装置耦合到隔离块并且被配置为从由电流源传递的电流接收分流电流。 分流电流传感器耦合到分流装置并且适于检测流过分流装置的分流电流。 控制单元适于从电压传感器和分流电流传感器接收输入,并且监测分流电流相对于电压的变化以检测轨道断路或火车占用。
    • 6. 发明申请
    • METHOD FOR OPERATING A TRAIN MOVEMENT CONTROL UNIT WITH A CENTRALLY SUPPLIED TRACK CIRCUIT
    • 一种用于操作与动力轨道电路的列车控制装置CENTER
    • WO99047404A1
    • 1999-09-23
    • PCT/DE1998/002286
    • 1998-07-30
    • B61L1/18B61L3/24
    • B61L1/181B61L3/24
    • The aim of the invention is to provide a particularly fast method for operating a train movement control unit with a centrally supplied track circuit. For this purpose, the length of track of a track circuit is divided into two adjacent partial track sections at a transmitting point of a transmitter. According to said method, the partial track sections are supplied with track currents which are received respectively by means of a respective receiver per partial track section. Said receivers are placed on the outer edge of their respective partial track section. When a train occupies at least one partial track section, the transmitter is electrically connected to the receiving point of the receiver which is located upstream from the train, viewed in the direction of the train movement, as an output receiver. Said output receiver is connected to the initial transmitting point of the transmitter for continuously controlling the trains on the whole length of the track. The transmitter is then immediately re-connected to its initial transmitting point, as soon as the train leaves the track section with its first axle.
    • 本发明具有的目的是用于与中心馈轨道电路操作列车控制装置提供了一种特别快速的方法。 这个目的是通过一种用于与轨道电路操作列车控制装置来实现,在轨道的区段中的两个相邻部分的轨道部分在一个发射器的发射站点,在轨道部的一部分的过程中跟踪电流供给被分开并且由每个接收者的每个磁道部分中,其中的一部分被接收 接收器分别安装在其各自的子轨道部的外边缘,并且其中,轨道的局部部分中的至少一个由所述发射器的列车到接收器的接收机构根据占用电连接,所考虑的是在列车行进方向出口接收器位于列车的前面,并 出口接收器连接到发射器的原始发送站,以确保在轨道的整个截面的连续的列车控制,并且其中,所述发送器立即返回到其原始艺术 车始发和出口接收器立即一旦列车离开其第一轴轨道段切换回原来的收货地。
    • 8. 发明申请
    • DETEKTION DES BELEGT- ODER FREIZUSTANDES EINES GLEISABSCHNITTS MIT ZUSTANDSBEWERTUNG DER ELEKTRISCHEN TRENNUNG ZUM BENACHBARTEN GLEISABSCHNITT
    • 与状态平平的电气隔离的轨道区段的忙或游离状态到邻近的轨道区段检测
    • WO2013131571A1
    • 2013-09-12
    • PCT/EP2012/054007
    • 2012-03-08
    • SIEMENS AKTIENGESELLSCHAFTBOHLMANN, PeerLUDE, GeraldRASCHKE, Bernd
    • BOHLMANN, PeerLUDE, GeraldRASCHKE, Bernd
    • B61L1/18
    • B61L1/181
    • Die Erfindung betrifft eine Auswerte-Einrichtung (A) für eine Vorrichtung zur Detektion des Belegt- oder Freizustandes eines Gleisabschnitts (G) anhand eines über die Fahrschienen (F) des Gleisabschnitts (G) empfangenen Empfangs-Signals. Um eine Detektion des Belegt- oder Freizustands des Gleisabschnitts (G) mit besonders hoher Zuverlässigkeit zu ermöglichen, ist die erfindungsgemäße Auswerte-Einrichtung (A) ausgebildet, zumindest eine Kenngröße für eine Änderungsgeschwindigkeit der Amplitude (U E ) des Empfangs-Signals zu bestimmen und anhand der zumindest einen Kenngröße für die Änderungsgeschwindigkeit der Amplitude (U E ) des Empfangs- Signals eine Zustandsbewertung einer elektrischen Trennung des Gleisabschnitts (G) von einem benachbarten Gleisabschnitt vorzunehmen. Die Erfindung betrifft des Weiteren ein Verfahren zum Betreiben einer Vorrichtung zur Detektion des Belegt- oder Freizustandes eines Gleisabschnitts (G).
    • 本发明涉及一种分析装置(A)为一个装置,通过对所述轨道部分(G)的行进轨道(F)的方式检测的轨道部分(G)的占用或自由状态下接收的接收信号。 轨道段的占用或自由状态的检测,以允许特别高的可靠性(G),根据本发明的评价装置中形成(A),对于振幅的接收信号的(UE)的变化率的至少一个参数来确定和基于 制造用于接收信号的振幅(UE),相邻的轨道段的轨道部分(G)的电分离的状态评估的变化率的至少一个参数。 本发明还涉及一种用于操作设备,用于检测一个轨道部分(G)的占用或自由状态的方法。
    • 10. 发明申请
    • SYSTEM AND METHOD FOR DETECTING RAIL BREAK OR VEHICLE
    • 用于检测轨道或车辆的系统和方法
    • WO2007075415A1
    • 2007-07-05
    • PCT/US2006/047915
    • 2006-12-14
    • GENERAL ELECTRIC COMPANYANDERSON, Todd, AlanWELLES, Kenneth, Brakeley, II
    • ANDERSON, Todd, AlanWELLES, Kenneth, Brakeley, II
    • B61L1/18B61L23/04
    • B61L23/044B61L1/181
    • A rail break or vehicle detection system includes a plurality of voltage sources, each coupled to one of the plurality of zones. A plurality of resistors are provided, each coupled in series with one of the plurality of voltage sources. A plurality of current sensors are provided, each coupled to one of the plurality of resistors and adapted to measure a first set of values and second set of values indicative of current flowing through the resistor. At least one control unit is adapted to receive input from the plurality of current sensors and to compare a difference between the second set of values and the first set of values to a predetermined threshold limit to detect presence of a rail vehicle on the block. The control unit is further adapted to switch a polarity of each voltage source.
    • 轨道断路或车辆检测系统包括多个电压源,每个电压源耦合到多个区域之一。 提供多个电阻器,每个电阻器与多个电压源中的一个串联耦合。 提供多个电流传感器,每个电流传感器分别耦合到多个电阻器中的一个并且适于测量指示电流流过电阻器的电流的第一组值和第二组值。 至少一个控制单元适于接收来自多个电流传感器的输入,并且将第二组值与第一组值之间的差值比较到预定阈值极限,以检测轨道车辆在该块上的存在。 控制单元还适于切换每个电压源的极性。