会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • METHOD FOR OPERATING A POWER GENERATION SYSTEM
    • 一种发电系统的运行方法
    • WO2012062327A2
    • 2012-05-18
    • PCT/DK2011/050425
    • 2011-11-10
    • VESTAS WIND SYSTEMS A/SGUPTA, Amit KumarNIELSEN, John GodskYANG, Liang
    • GUPTA, Amit KumarNIELSEN, John GodskYANG, Liang
    • F03D9/00
    • G01R19/16533F03D7/00F03D7/0284F03D7/042F03D9/255F03D9/257F05B2270/337G01R19/10H02J3/26H02J3/386H02J2003/001H02K7/183H02P9/04Y02E10/723Y02E10/725Y02E10/763Y02E40/50
    • A method for operating a power generation system coupled to a power grid during a grid unbalance event, a method for determining an injection current to be supplied into a power grid by a power generation system, and a method for addressing an asymmetric grid fault in a power grid connected to a power generation system are provided. The methods may be carried out based on a reactive or an active power/current priority. For reactive power/current priority, a positive sequence reactive current and a negative sequence reactive current may be first determined. The positive sequence reactive current and the negative sequence reactive current may be adjusted, and a positive sequence active current and a negative sequence active current may be determined such that a maximum current limit, a maximum allowed active power ripple and a maximum grid side converter voltage are not exceeded. For active power/current priority, a positive sequence active current and a negative sequence active current may be first determined. A positive sequence reactive current and a negative sequence reactive current may then be determined based on the positive sequence active current and the negative sequence active current. The positive sequence active current, the negative sequence active current, the positive sequence reactive current and the negative sequence reactive current may be determined such that a maximum current limit, a maximum allowed active power ripple and a maximum grid side converter voltage are not exceeded.
    • 一种用于在电网不平衡事件期间操作耦合到电网的发电系统的方法,用于确定由发电系统供应到电网中的注入电流的方法,以及用于解决电力系统中不对称电网故障的方法 提供连接到发电系统的电网。 这些方法可以基于无功或有功功率/电流优先级进行。 对于无功功率/电流优先级,可以首先确定正序无功电流和负序无功电流。 可以调整正序无功电流和负序无功电流,并且可以确定正序有功电流和负序有功电流,使得最大电流限制,最大允许有功功率纹波和最大电网侧转换器电压 不超过 对于有功功率/电流优先级,可以首先确定正序有功电流和负序有功电流。 然后可以基于正序有功电流和负序有功电流来确定正序无功电流和负序无功电流。 可以确定正序有功电流,负序有功电流,正序无功电流和负序无功电流,使得不超过最大电流限制,最大允许有功功率纹波和最大电网侧转换器电压。
    • 4. 发明申请
    • METHOD AND SYSTEM FOR OPERATING A WIND TURBINE
    • 用于运行风力涡轮机的方法和系统
    • WO2012062323A2
    • 2012-05-18
    • PCT/DK2011/050421
    • 2011-11-08
    • VESTAS WIND SYSTEMS A/STEODORESCU, RemusRODRIGUEZ, PedroALLOZA, Alvaro LunaGUPTA, Amit Kumar
    • TEODORESCU, RemusRODRIGUEZ, PedroALLOZA, Alvaro LunaGUPTA, Amit Kumar
    • F03D9/00
    • G01R19/16533F03D7/00F03D7/0284F03D7/042F03D9/255F03D9/257F05B2270/337G01R19/10H02J3/26H02J3/386H02J2003/001H02K7/183H02P9/04Y02E10/723Y02E10/725Y02E10/763Y02E40/50
    • A method for operating a wind turbine and a system for operating a wind turbine are provided. The wind turbine includes a grid side converter and the grid side converter is coupled to a grid via a power line. The method includes determining a wind turbine operation strategy; determining a first active power reference and a first reactive power reference indicating a requested amount of active power and reactive power, respectively, depending on at least the wind turbine operation strategy; measuring a grid voltage of the grid; determining a positive sequence component and a negative sequence component of the grid voltage i.e. a positive sequence voltage and a negative sequence voltage; determining a second active power reference and a second reactive power reference indicating an actual amount of active power and reactive power to be supplied by the grid side converter to the grid, respectively, depending on at least the first active power reference, the first reactive power reference, and the wind turbine operation strategy; generating, based on at least the wind turbine operation strategy, a first parameter and a second parameter which define a proportion of positive sequence current component and negative sequence current component to be injected by the grid side converter in order to supply active power and reactive power in accordance with the second active power reference and the second reactive power reference; generating a current reference based on at least the second active power reference, the second reactive power reference, the positive sequence voltage, the negative sequence voltage, the first parameter, and the 77 second parameter; and supplying, with the grid side converter, active and reactive power to the power line based on the current reference.
    • 提供了一种用于操作风力涡轮机的方法和一种用于操作风力涡轮机的系统。 风力涡轮机包括电网侧转换器并且电网侧转换器经由电力线耦合到电网。 该方法包括确定风力涡轮机操作策略; 至少取决于风力涡轮机操作策略,确定分别指示所请求的有功功率和无功功率量的第一有功功率基准和第一无功功率基准; 测量电网的电网电压; 确定电网电压的正序分量和负序分量,即正序电压和负序电压; 根据至少第一有功功率参考值,确定第二有功功率参考值和第二无功功率参考值,所述第二无功功率参考值指示要由电网侧转换器分别向电网供应的有功功率和无功功率的实际量, 参考,以及风机运行策略; 至少基于风力涡轮机操作策略生成第一参数和第二参数,该第一参数和第二参数定义由电网侧变流器注入的正序电流分量和负序电流分量的比例,以便提供有功功率和无功功率 根据所述第二有功功率基准和所述第二无功功率基准; 至少基于所述第二有功功率参考,所述第二无功功率参考,所述正序电压,所述负序电压,所述第一参数以及所述第七参数来生成电流参考; 并且利用电网侧转换器基于电流基准向电力线提供有功功率和无功功率。
    • 6. 发明申请
    • METHOD OF CONTROLLING A GRID SIDE CONVERTER OF A WIND TURBINE AND SYSTEM SUITABLE THEREFORE
    • 控制风力发电机组的三轮转换器及其适用的系统的方法
    • WO2012022353A2
    • 2012-02-23
    • PCT/DK2011/050310
    • 2011-08-16
    • VESTAS WIND SYSTEMS A/SGUPTA, Amit KumarANSHUMAN, TripathiCAO, Shu Yu
    • GUPTA, Amit KumarANSHUMAN, TripathiCAO, Shu Yu
    • H02J3/00
    • H02M7/539H02J3/386H02M7/483H02M7/53875H02P9/00H02P2101/15Y02E10/763
    • According to an embodiment of the present invention, a method of controlling a grid side converter of a wind turbine is provided, wherein an output of the grid side converter is connected or connectable via a power line to an input of a grid transformer, the method comprising: determining a converter volt-sec occurring at the output of the grid side converter based on a converter voltage occurring at the output of the grid side converter; determining a volt-sec error between the determined converter volt-sec and a converter volt-sec reference, wherein the converter volt-sec reference is determined based on active power reference, reactive power reference, line current and a line voltage occurring at the input of the grid transformer (or at wind turbine terminals); and controlling, based on the determined volt-sec error, the grid side converter such that the volt-sec error is partly or fully compensated. The method is capable of supporting the demanded power quality even during abnormal voltage conditions, and is easy to realize. The method can seamlessly transit from linear to non-linear region of converter operation.
    • 根据本发明的一个实施例,提供了一种控制风力涡轮机的电网侧转换器的方法,其中电网侧转换器的输出通过电力线连接或连接到电网变压器的输入端,该方法 包括:基于在所述电网侧转换器的输出处出现的转换器电压,确定在所述电网侧转换器的输出处出现的转换器电压 - 秒; 确定所确定的转换器伏特和转换器伏秒参考之间的伏特 - 秒误差,其中转换器伏特参考基于有功功率参考,无功功率参考,线电流和在输入端产生的线电压来确定 的电网变压器(或风力涡轮机端子); 以及基于所确定的伏特 - 秒误差来控制所述电网侧转换器,使得所述伏秒误差被部分地或完全地补偿。 该方法即使在异常电压条件下也能够支持要求的电力质量,并且容易实现。 该方法可以从转换器工作的线性到非线性区域无缝转换。