会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • WORK PLATFORM SYSTEM INCLUDING SUSPENDED PANELED PORTION AND METHOD OF IMPLEMENTING SAME
    • 包括悬挂式面板部分的工作平台系统及其实施方法
    • WO2014189539A1
    • 2014-11-27
    • PCT/US2013/063234
    • 2013-10-03
    • SAFWAY SERVICES, LLC
    • GRUMBERG, MathieuSCRAFFORD, RoyMEADE, Frederick, W.
    • E04G3/22
    • E04G3/22E01D19/106E01D22/00E04C3/08E04C3/09E04C2003/0491E04G1/152E04G1/154E04G5/145E04G7/26E04G7/28E04G2007/285
    • A work platform system (860) for implementation in relation to a structure (100), as well as subsystems and components thereof and methods of implementation and use relating thereto, are disclosed herein. In at least one embodiment, the work platform system (860) includes a first pair of flexible elements and a second pair of flexible elements, where a respective first end of each of the flexible elements is coupled at least indirectly to a first support component (132) and a respective second end of each of the flexible elements is coupled at least indirectly to a second support component (134). The work platform system can further include a plurality of panel structures supported upon the flexible elements, a suspension component, and a clamp structure coupled to at least one of the first pair of flexible elements and the second pair of flexible elements. The panel structures can include one or more support extension.
    • 本文公开了一种用于与结构(100)相关的实现的工作平台系统(860)及其子系统及其组件以及与之相关的实现和使用方法。 在至少一个实施例中,工作平台系统(860)包括第一对柔性元件和第二对柔性元件,其中每个柔性元件的相应第一端至少间接地联接到第一支撑部件( 132),并且每个柔性元件的相应的第二端至少间接耦合到第二支撑部件(134)。 工作平台系统还可以包括支撑在柔性元件上的多个面板结构,悬挂部件和联接到第一对柔性元件和第二对柔性元件中的至少一个的夹紧结构。 面板结构可以包括一个或多个支撑延伸部。
    • 3. 发明申请
    • WORK PLATFORM SYSTEM INCLUDING SUSPENDED PANELED PORTION AND METHOD OF IMPLEMENTING SAME
    • 包括悬挂式面板部分的工作平台系统及其实施方法
    • WO2014189498A1
    • 2014-11-27
    • PCT/US2013/042084
    • 2013-05-21
    • SAFWAY SERVICES, LLC
    • GRUMBERG, MathieuSCRAFFORD, RoyMEADE, Frederick, W.
    • E04G3/22E01D22/00
    • E04G3/22E01D19/106E01D22/00E04C3/09E04C2003/0491E04G1/152E04G1/154E04G5/145E04G7/26E04G7/28
    • A work platform system (860) for implementation in relation to a structure (100), as well as subsystems and components thereof and methods of implementation and use relating thereto, are disclosed herein. In at least one embodiment, the work platform system (860) includes a first pair of flexible elements and a second pair of flexible elements, where a respective first end of each of the flexible elements is coupled at least indirectly to a first support component (132) and a respective second end of each of the flexible elements is coupled at least indirectly to a second support component (134). The work platform system can further include a plurality of panel structures supported upon the flexible elements, a suspension component, and a clamp structure coupled to at least one of the first pair of flexible elements and-the second pair of flexible elements. The panel structures can include one or more support extension.
    • 本文公开了一种用于与结构(100)相关的实现的工作平台系统(860)及其子系统及其组件以及与之相关的实现和使用方法。 在至少一个实施例中,工作平台系统(860)包括第一对柔性元件和第二对柔性元件,其中每个柔性元件的相应第一端至少间接地联接到第一支撑部件( 132),并且每个柔性元件的相应的第二端至少间接耦合到第二支撑部件(134)。 工作平台系统还可以包括支撑在柔性元件上的多个面板结构,悬挂部件和联接到第一对柔性元件和第二对柔性元件中的至少一个的夹紧结构。 面板结构可以包括一个或多个支撑延伸部。
    • 6. 发明申请
    • WORK PLATFORM SYSTEM CONFIGURED FOR USE STRUCTURE WITH INTERNAL CAVITY, AND RELATED METHODS OF ASSEMBLY AND USE
    • 用于内部结构的工作平台系统,以及相关的组装和使用方法
    • WO2013002790A1
    • 2013-01-03
    • PCT/US2011/042414
    • 2011-06-29
    • SAFWAY SERVICES, LLCJOLICOEUR, PaulSCRAFFORD, RoyGRUMBERG, Mathieu
    • JOLICOEUR, PaulSCRAFFORD, RoyGRUMBERG, Mathieu
    • E04G3/30
    • E04G3/305E04G3/246E04G5/00Y10T29/49817
    • Work platform systems and related methods of assembly and use are disclosed herein. In one exemplary embodiment, a method of installing a work platform system into an internal cavity of a structure includes supporting a first platform portion at a first location, and adding a plurality of additional platform portions to the first platform portion, where successive ones of the additional platform portions are respectively positioned at respective locations that are successively farther outward away from the first platform portion. The method further includes coupling the additional platform portions to one or more other locations, and detaching the additional platform portions from one another. The method additionally includes lowering or raising one or more of the first and additional platform portions to one or more additional levels below or above the first level, where the work platform system includes the first and additional platform portions.
    • 本文公开了工作平台系统及相关组装和使用方法。 在一个示例性实施例中,将工作平台系统安装到结构的内部空腔中的方法包括在第一位置处支撑第一平台部分,并将多个附加平台部分添加到第一平台部分,其中连续的 另外的平台部分分别位于相对于第一平台部分相继更靠外的相应位置。 该方法还包括将附加平台部分联接到一个或多个其他位置,以及将附加平台部分彼此分开。 该方法还包括将第一和另外的平台部分中的一个或多个下降或升高到低于或高于第一水平的一个或多个附加水平,其中工作平台系统包括第一和另外的平台部分。