会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • LIFTING JACK, METHOD OF COUPLING SUSPENDING RODS AND LIFT CONTROL METHOD
    • 提升夹具,联轴器悬挂方法和起重控制方法
    • WO1997038933A1
    • 1997-10-23
    • PCT/JP1997001284
    • 1997-04-14
    • HITACHI PLANT ENGINEERING & CONSTRUCTION CO., LTD.ISHIKAWA, YusukeKAWAGUCHI, ShigeyoshiFUKUSHIMA, ShigeruKOIDE, Hideo
    • HITACHI PLANT ENGINEERING & CONSTRUCTION CO., LTD.
    • B66F01/08
    • B66F3/46B66F1/08Y10T29/53039Y10T29/53061Y10T29/53687
    • A rod constituting a suspending rod is automatically connected or detached, and a rod is easily conveyed between a position where the rod is delivered to rod attaching/detaching means and a position where the rod is contained. A plurality of jacks are operated in synchronism. In the upper part of a boiler-side steel structure (58) is provided a boiler jack (60) for moving a boiler module (56) up and down via a suspending rod (52). Above the boiler jack is provided a device (68) for automatically attaching/detaching a rod. The device (68) is movable horizontally. The rod attaching/detaching device (68) grips a rod (52S) at the end of the suspending rod pushed up by the boiler jack, rotates it to remove, and transfers it to a rod conveyor device (70). Upon receiving the rod from the rod attaching/detaching device, the rod conveyor device conveys it to a rod container (54) provided on a working floor (42). A plurality of jacks (60) are driven by synchronous output operation, the displacements of stroke of all the jacks are measured to find the differences between the minimum displacements and the other displacements, and the outputs of the jacks (60) of which the differences are larger than a set value are decreased so that the displacements are equalized to the minimum displacement.
    • 构成悬挂杆的杆自动连接或拆卸,并且杆可以在杆被输送到杆安装/拆卸装置的位置和杆被容纳的位置之间容易地传送。 多个插孔同步运行。 在锅炉侧钢结构(58)的上部设置有锅炉千斤顶(60),用于经由吊杆(52)上下移动锅炉模块(56)。 在锅炉千斤顶之上设置有用于自动连接/拆卸杆的装置(68)。 装置(68)可水平移动。 杆安装/拆卸装置(68)在由锅炉千斤顶向上推动的悬挂杆的端部处握住杆(52S),将其旋转以移除,并将其传送到杆传送装置(70)。 在从杆安装/拆卸装置接收杆时,杆传送装置将其传送到设置在工作台面(42)上的杆容器(54)。 通过同步输出操作驱动多个千斤顶(60),测量所有千斤顶的行程位移,以找出最小位移与其他位移之间的差异,并且其间差异的插孔(60)的输出 大于设定值减小,使得位移与最小位移相等。