会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • APPARATUS & METHOD
    • 装置与方法
    • WO2012004600A1
    • 2012-01-12
    • PCT/GB2011/051272
    • 2011-07-07
    • GNODAL LIMITEDBEECROFT, JonHEWSON, David Charles
    • BEECROFT, JonHEWSON, David Charles
    • H04L12/56
    • H04L47/32H04L47/11H04L47/12H04L47/193
    • A method of controlling data packet congestion in a data packet network comprises determining a reference flow condition that results in data packet congestion at a node of a data packet network, and identifying a data packet flow having a flow condition substantially equal to the reference flow condition. For such an identified data packet flow the following actions are taken causing a data packet to be dropped from the identified data packet flow, allowing a predetermined number of data packets from the identified data packet flow to proceed, and dropping data packets from the identified data packet flow subsequent to the predetermined number of data packets, until the packets that were not dropped have been delivered to the egress ports of the network.
    • 一种控制数据分组网络中的数据分组拥塞的方法包括:确定导致数据分组网络的节点处的数据分组拥塞的参考流条件,以及识别具有基本上等于参考流条件的流条件的数据分组流 。 对于这种识别的数据分组流,采取以下动作,导致从所识别的数据分组流中丢弃数据分组,从而允许来自所识别的数据分组流的预定数量的数据分组继续进行,并且从所识别的数据丢弃数据分组 在预定数量的数据分组之后的分组流,直到未丢弃的分组已经被传送到网络的出口端口。
    • 2. 发明申请
    • METHOD & DEVICE
    • 方法和设备
    • WO2012007766A1
    • 2012-01-19
    • PCT/GB2011/051336
    • 2011-07-15
    • GNODAL LIMITEDBEECROFT, JonHEWSON, David Charles
    • BEECROFT, JonHEWSON, David Charles
    • H04L12/56
    • H04L47/11H04L47/24H04L47/266H04L47/32H04L49/101H04L49/205H04L49/501
    • A method for controlling data packet routing through a switching element having a first plurality of input ports and a second plurality of output ports, the method comprising the steps of: detecting issuance of a first congestion indicator from an output port of the switching element, the first congestion indicator relating to a first routing request from a first input port of the switching element; allowing reassertion of the first routing request after a first time period; detecting issuance of a second congestion indicator from the output port of the switching element, the second congestion indicator relating to a second routing request from a second input port of the switching element; allowing reassertion of the second routing request after a second time period, wherein the first and second time periods are such that reassertions of the first and second connection requests occur substantially simultaneously. Also provided is a device for controlling such data packet routing.
    • 一种用于通过具有第一多个输入端口和第二多个输出端口的开关元件来控制数据分组路由的方法,所述方法包括以下步骤:从所述交换单元的输出端口检测第一拥塞指示符的发布, 与来自所述开关元件的第一输入端口的第一路由请求相关的第一拥塞指示符; 允许在第一时间段之后重新确定第一路由请求; 检测从所述交换单元的输出端口发出的第二拥塞指示符,所述第二拥塞指示符与所述交换元件的第二输入端口相关的第二路由请求; 允许在第二时间段之后重新确定第二路由请求,其中第一和第二时间段使得第一和第二连接请求的重新发生基本上同时发生。 还提供了一种用于控制这种数据分组路由的设备。