会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • PACKET SWITCHING COMMUNICATIONS SYSTEM
    • 分组交换通信系统
    • WO1992014320A1
    • 1992-08-20
    • PCT/US1992000718
    • 1992-01-29
    • REPUBLIC TELCOM SYSTEMS CORPORATION
    • REPUBLIC TELCOM SYSTEMS CORPORATIONCERNA, PavelHAY, Robert F.
    • H04L12/56
    • H04L49/505H04L47/10H04L47/2416H04L47/263H04L49/205H04L49/30H04L49/501Y02D50/10
    • A multi-channel telephonic communications system, (PBXA-PBXD), where voice, data, facsimile information is packetized and switched to the desired destination based upon a call number embedded in each packet which is based upon the digits dialed at the source. Aswitching architecture (44) is used to minimize the trunk line resource needed and to simplify system configuration and maintenance. Connection between the source and the desired destination are allowed if there is sufficient bandwidth to support the connection. Flow control is also provided, which dynamically varies the bandwidth provided. Flow control is also provided, which dynamically varies the bandwidth used by voice packets to adjust to changing traffic levels. Voice bandwidth is reduced when needed by the traffic volume, and voice bandwidth is increased when possible to improve voice quality.
    • 一种多通道电话通信系统(PBXA-PBXD),其中语音,数据,传真信息根据嵌入在每个分组中的呼叫号码分组化并切换到所需的目的地,该呼叫基于在源处拨打的数字。 开关架构(44)用于最小化所需的干线资源,并简化系统配置和维护。 如果有足够的带宽来支持连接,则允许源和所需目的地之间的连接。 还提供了流量控制,其动态地改变所提供的带宽。 还提供了流量控制,其动态地改变语音分组使用的带宽以适应不断变化的流量水平。 话音流量需要时语音带宽减少,语音带宽可以提高,以提高语音质量。
    • 9. 发明申请
    • REDUCING TRAFFIC OVERLOAD IN SOFTWARE DEFINED NETWORK
    • 在软件定义的网络中减少交通过载
    • WO2016177404A1
    • 2016-11-10
    • PCT/EP2015/059820
    • 2015-05-05
    • TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
    • GROSSO, Renato
    • H04L12/851H04L29/06H04L12/721H04L12/717
    • H04L45/38H04L47/11H04L47/2441H04L49/501H04L63/1458H04L2012/5684
    • For managing a traffic overload in a software defined network (70) having an SDN controller (10), when an indication of a traffic overload is received (200), there are steps of identifying (208) traffic flows which contribute to this, identifying (210) nodes (20, 21, 22) of the network controllable by the SDN controller and located along a path of the identified traffic flows before the location of the traffic overload. The SDN controller is used to control (220) the identified nodes to control the identified traffic flows to reduce the traffic overload. By using the SDN controller to control the reduction compared to diverting suspicious traffic flows to a separate external security server, the extra network resources used for carrying the diverted traffic flows are not needed, the separate security server is not needed, and the risk of such diverted traffic flows themselves causing overloads is reduced. It can be applicable to a range of causes of overload, including denial of service attacks.
    • 为了管理具有SDN控制器(10)的软件定义网络(70)中的业务过载,当接收到业务过载的指示(200)时,存在识别(208)有助于此的交通流量的步骤,识别 (210)节点(20,21,22),其可由SDN控制器控制并且沿着所识别的业务流的路径在流量过载的位置之前定位。 SDN控制器用于控制(220)所识别的节点,以控制识别的流量,以减少流量过载。 通过使用SDN控制器来控制与将可疑流量转向单独的外部安全服务器相比的减少,不需要用于承载转移流量的额外网络资源,不需要单独的安全服务器,并且存在这样的风险 转向流量本身导致过载减少。 它可以适用于一系列过载的原因,包括拒绝服务攻击。
    • 10. 发明申请
    • METHOD & DEVICE
    • 方法和设备
    • WO2012007766A1
    • 2012-01-19
    • PCT/GB2011/051336
    • 2011-07-15
    • GNODAL LIMITEDBEECROFT, JonHEWSON, David Charles
    • BEECROFT, JonHEWSON, David Charles
    • H04L12/56
    • H04L47/11H04L47/24H04L47/266H04L47/32H04L49/101H04L49/205H04L49/501
    • A method for controlling data packet routing through a switching element having a first plurality of input ports and a second plurality of output ports, the method comprising the steps of: detecting issuance of a first congestion indicator from an output port of the switching element, the first congestion indicator relating to a first routing request from a first input port of the switching element; allowing reassertion of the first routing request after a first time period; detecting issuance of a second congestion indicator from the output port of the switching element, the second congestion indicator relating to a second routing request from a second input port of the switching element; allowing reassertion of the second routing request after a second time period, wherein the first and second time periods are such that reassertions of the first and second connection requests occur substantially simultaneously. Also provided is a device for controlling such data packet routing.
    • 一种用于通过具有第一多个输入端口和第二多个输出端口的开关元件来控制数据分组路由的方法,所述方法包括以下步骤:从所述交换单元的输出端口检测第一拥塞指示符的发布, 与来自所述开关元件的第一输入端口的第一路由请求相关的第一拥塞指示符; 允许在第一时间段之后重新确定第一路由请求; 检测从所述交换单元的输出端口发出的第二拥塞指示符,所述第二拥塞指示符与所述交换元件的第二输入端口相关的第二路由请求; 允许在第二时间段之后重新确定第二路由请求,其中第一和第二时间段使得第一和第二连接请求的重新发生基本上同时发生。 还提供了一种用于控制这种数据分组路由的设备。