    • ZONE MODULE CONSTRUCTION METHOD OF STEEL STRUCTURE CONSTRUCTION
    • 钢结构施工区域模块施工方法
    • WO1994027003A1
    • 1994-11-24
    • PCT/JP1994000777
    • 1994-05-13
    • MITSUBISHI JUKOGYO KABUSHIKI KAISHATAKAHASHI, TsukasaHORI, MitsumasaYOSHIOKA, HideyukiYAMASHITA, KazukuniHIKIZI, ShigetoshiTAKANO, TamotsuOHAMA, NaomichiTANAKA, YoshiyukiTSUKIYAMA, Tominari
    • MITSUBISHI JUKOGYO KABUSHIKI KAISHA
    • E04H05/02
    • E04B1/24E04B1/35E04B2001/3588
    • The method comprises the steps of: erecting trussed column assemblies (1A, 1B) which are constructed by arranging and joining a plurality of struts, beams and braces; installing trussed beam assemblies (1C) between the tops of the trussed column assemblies (1A, 1B) which have been erected in parallel with each other, to form a portal truss assembly (1D); mounting portal truss assemblies (1D) lengthwise and breadthwise in conformity with a configuration of a steel structure being built; and carrying a first module (6A) into a construction zone, which module being among modules being mounted in the construction zones between the oppositely arranged portal truss assemblies (1D) and being to be arranged at a position higher than those for the other modules, lifting the first module (6A) above a second module (6B), which is to be arranged immediately below the first module (6A), by means of a first lifting device provided on the sides of the portal truss assemblies 1D, carrying in the second module (6B) immediately below the first module (6A), joining the both modules (6A, 6B), further carrying in third modules (6C) below the second module (6B) and joining the both modules (6B, 6C), and repeating the above sequences to mount the modules (6A, 6B, 6C, ---) between the portal truss assemblies (1D).
    • 该方法包括以下步骤:架设通过布置和连接多个支柱,梁和支架构造的桁架柱组件(1A,1B); 将桁架梁组件(1C)安装在彼此平行竖立的桁架柱组件(1A,1B)的顶部之间,以形成门桁架组件(1D); 根据正在建造的钢结构的构造,纵向和纵向安装门架桁架组件(1D) 并且将第一模块(6A)运载到建筑区域中,该模块在模块之间安装在相对布置的门架式桁架组件(1D)之间的构造区域中,并被布置在比其他模块的位置更高的位置, 通过设置在门架桁架组件1D的侧面上的第一提升装置将第一模块(6A)提升到第二模块(6B)上方,该第二模块(6B)将被布置在第一模块(6A)的正下方, 第二模块(6B)紧接在第一模块(6A)的下方,连接两个模块(6A,6B),进一步承载在第二模块(6B)下方的第三模块(6C)并连接两个模块(6B,6C) 并重复上述顺序以将模块(6A,6B,6C,...)安装在门桁架组件(1D)之间。