会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • NETWORK SYSTEM
    • 网络系统
    • WO2011162552A3
    • 2012-05-03
    • PCT/KR2011004574
    • 2011-06-22
    • LG ELECTRONICS INCAHN JUNHOKIM YANGHWANLEE HOONBONGLEE KOONSEOKGO SEOGHOHAN JONGHEEKIM DONGHYUN
    • AHN JUNHOKIM YANGHWANLEE HOONBONGLEE KOONSEOKGO SEOGHOHAN JONGHEEKIM DONGHYUN
    • G06Q50/00G06Q10/06
    • G06F1/26G06Q10/04G06Q10/06G06Q50/06
    • One embodiment of the present invention relates to a network system. The network system according to said embodiment of the present invention comprises at least one component selected from an energy demand/supply unit to which energy is supplied and an energy management unit which manages an energy demand/supply component. The energy demand/supply unit or the energy management unit receives information relating to energy charge. The amount of energy used or energy charged when the component is controlled on the basis of at least the information relating to the energy charge can be smaller than the amount of energy used or energy charged when the component is not controlled on the basis of at least the information relating to the energy charge. If the information relating to the energy charge is high-cost information, the function of one component of the energy demand/supply unit is limited, and the operating time or output of the energy demand/supply unit is adjusted after the completion of the high-cost information period in accordance with the limited function of one component.
    • 本发明的一个实施例涉及网络系统。 根据本发明的所述实施例的网络系统包括从供应能量的能量需求/供应单元和管理能量需求/供应部件的能量管理单元中选择的至少一个部件。 能源需求/供应单元或能源管理单元接收与能量费用有关的信息。 当基于至少与能量电荷有关的信息来控制组件时所使用的能量或能量的量可以小于当该组件至少基于至少控制组件而被控制时所使用的能量或能量的量 有关能源费用的资料。 如果与能源费有关的信息是高成本信息,则能量需求/供给单元的一个部件的功能受到限制,能量需求/供应单元的运行时间或输出在高电平完成后被调整 - 根据一个组件的功能有限的信息周期。