会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • GROUPED PRODUCTS SETTING SUSPENSION SCALE AND THEIR COMPONENT PARTS, AND METHOD OF CONSTRUCTING PLANTS UTILIZING SAID SUSPENSION SCALE
    • 分组产品设置悬挂尺寸及其组件部件,以及使用实例悬挂尺寸构建植物的方法
    • WO1997013716A1
    • 1997-04-17
    • PCT/JP1995002106
    • 1995-10-13
    • HITACHI, LTD.HITACHI NUCLEAR ENGINEERING CO., LTD.MATSUURA, TadashiYOSHINAGA, ToshiakiUSHIRODA, KouichiYAMANE, YouichiYOSHIDA, NaotoOIKAWA, TadaakiGOTOU, KaneoCHINEN, Masamichi
    • HITACHI, LTD.HITACHI NUCLEAR ENGINEERING CO., LTD.
    • B66C01/10
    • B66C1/10B66C1/12B66C1/16E04H5/02
    • The present invention, which relates to a plant construction work, employs a grouped products setting suspension scale structure provided with a first suspension scale capable of being supported freely on a building, a plurality of metal suspension members provided on the first suspension scale, and a second suspension scale supported on the first suspension scale so that the second suspension scale can be moved vertically and adapted to collectively suspend grouped products from the positions distributed in horizontal two-dimensional directions. The present invention employs a plant constructing method using suspension scales, comprising the steps of supporting the second suspension scale at a plurality of portions thereof on the first suspension scale so that the second suspension scale can be vertically moved, supporting in a suspended state a plurality of portions of the grouped products on a plurality of portions, which are distributed in horizontal two-dimensional directions, of the second suspension scale, suspending the first suspension scale by a crane while maintaining mutual positional relations between products, transferring the first suspension scale from the crane onto the building and supporting the suspension scale thereon, and then transferring the grouped products by lowering the second suspension scale, whereby the grouped products are installed in the position of installation thereof.
    • 涉及工厂建造工作的本发明采用分组的产品设置悬挂秤结构,其具有可在建筑物上自由地支撑的第一悬挂秤,设置在第一悬挂秤上的多个金属悬挂构件,以及 第二悬挂秤支撑在第一悬挂秤上,使得第二悬架秤可以垂直移动并适于将分组的产品从分布在水平二维方向上的位置中集中地悬挂下来。 本发明采用使用悬挂秤的工厂构造方法,包括以下步骤:在第一悬架秤上的多个部分处支撑第二悬挂秤,使得第二悬架秤可以垂直移动,以悬挂状态支撑多个 所述分组产品的部分在所述第二悬挂秤的水平二维方向分布的多个部分上,通过起重机悬挂所述第一悬架秤,同时保持产品之间的相互位置关系,将所述第一悬架秤从 起重机到建筑物上并在其上支撑悬挂秤,然后通过降低第二悬挂秤转移分组的产品,由此将分组的产品安装在其安装位置。