会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • ACCESS STRUCTURE INTEGRATION ASSEMBLY AND INTEGRATED ACCESS SYSTEMS AND METHODS OF USING THE SAME
    • 访问结构集成组合和集成访问系统及其使用方法
    • WO2015020662A8
    • 2016-01-21
    • PCT/US2013054170
    • 2013-08-08
    • SAFWAY SERVICES LLC
    • GRUMBERG MATHIEUSCRAFFORD ROYMEADE FREDERICK W
    • E04G5/02E04G7/22
    • E04G5/02E01D19/106E04G1/34E04G3/30E04G5/14E04G7/22
    • The invention includes an access structure integration assembly (300) and an integrated system using the assembly (300). An access structure integrated assembly (300) includes at least one channeled structure (50) and at least one joist socket (60) slidingly engaged with the channeled structure (50). The channeled structure (50) is configured to secure to a base structure (100), such as a suspended work platform system, and the joist socket (60) is configured to secure to a second structure (200), such as a supported work platform system. An integrated system includes a base structure (100), a second structure (200) and at least two integration assemblies (300), each assembly including a channeled structure (50) secured to the base structure (100) and a joist socket (60) secured to the second structure (200) and slidingly engaged with the channeled structure (50).
    • 本发明包括访问结构集成组件(300)和使用组件(300)的集成系统。 进入结构集成组件(300)包括至少一个通道结构(50)和与通道结构(50)滑动接合的至少一个托梁插槽(60)。 引导结构(50)被配置为固定到基础结构(100),例如悬挂的工作平台系统,并且托梁插槽(60)被配置为固定到第二结构(200),例如被支撑的工件 平台系统 集成系统包括基部结构(100),第二结构(200)和至少两个整合组件(300),每个组件包括固定到基部结构(100)的通道结构(50)和托架插座(60) )固定到所述第二结构(200)并且与所述通道结构(50)滑动接合。
    • 3. 发明申请
    • WORK PLATFORM SYSTEM INCLUDING SUSPENDED PANELED PORTION AND METHOD OF IMPLEMENTING SAME
    • 包括悬挂式面板部分的工作平台系统及其实施方法
    • WO2014189539A1
    • 2014-11-27
    • PCT/US2013/063234
    • 2013-10-03
    • SAFWAY SERVICES, LLC
    • GRUMBERG, MathieuSCRAFFORD, RoyMEADE, Frederick, W.
    • E04G3/22
    • E04G3/22E01D19/106E01D22/00E04C3/08E04C3/09E04C2003/0491E04G1/152E04G1/154E04G5/145E04G7/26E04G7/28E04G2007/285
    • A work platform system (860) for implementation in relation to a structure (100), as well as subsystems and components thereof and methods of implementation and use relating thereto, are disclosed herein. In at least one embodiment, the work platform system (860) includes a first pair of flexible elements and a second pair of flexible elements, where a respective first end of each of the flexible elements is coupled at least indirectly to a first support component (132) and a respective second end of each of the flexible elements is coupled at least indirectly to a second support component (134). The work platform system can further include a plurality of panel structures supported upon the flexible elements, a suspension component, and a clamp structure coupled to at least one of the first pair of flexible elements and the second pair of flexible elements. The panel structures can include one or more support extension.
    • 本文公开了一种用于与结构(100)相关的实现的工作平台系统(860)及其子系统及其组件以及与之相关的实现和使用方法。 在至少一个实施例中,工作平台系统(860)包括第一对柔性元件和第二对柔性元件,其中每个柔性元件的相应第一端至少间接地联接到第一支撑部件( 132),并且每个柔性元件的相应的第二端至少间接耦合到第二支撑部件(134)。 工作平台系统还可以包括支撑在柔性元件上的多个面板结构,悬挂部件和联接到第一对柔性元件和第二对柔性元件中的至少一个的夹紧结构。 面板结构可以包括一个或多个支撑延伸部。
    • 4. 发明申请
    • WORK PLATFORM SYSTEM INCLUDING SUSPENDED PANELED PORTION AND METHOD OF IMPLEMENTING SAME
    • 包括悬挂式面板部分的工作平台系统及其实施方法
    • WO2014189498A1
    • 2014-11-27
    • PCT/US2013/042084
    • 2013-05-21
    • SAFWAY SERVICES, LLC
    • GRUMBERG, MathieuSCRAFFORD, RoyMEADE, Frederick, W.
    • E04G3/22E01D22/00
    • E04G3/22E01D19/106E01D22/00E04C3/09E04C2003/0491E04G1/152E04G1/154E04G5/145E04G7/26E04G7/28
    • A work platform system (860) for implementation in relation to a structure (100), as well as subsystems and components thereof and methods of implementation and use relating thereto, are disclosed herein. In at least one embodiment, the work platform system (860) includes a first pair of flexible elements and a second pair of flexible elements, where a respective first end of each of the flexible elements is coupled at least indirectly to a first support component (132) and a respective second end of each of the flexible elements is coupled at least indirectly to a second support component (134). The work platform system can further include a plurality of panel structures supported upon the flexible elements, a suspension component, and a clamp structure coupled to at least one of the first pair of flexible elements and-the second pair of flexible elements. The panel structures can include one or more support extension.
    • 本文公开了一种用于与结构(100)相关的实现的工作平台系统(860)及其子系统及其组件以及与之相关的实现和使用方法。 在至少一个实施例中,工作平台系统(860)包括第一对柔性元件和第二对柔性元件,其中每个柔性元件的相应第一端至少间接地联接到第一支撑部件( 132),并且每个柔性元件的相应的第二端至少间接耦合到第二支撑部件(134)。 工作平台系统还可以包括支撑在柔性元件上的多个面板结构,悬挂部件和联接到第一对柔性元件和第二对柔性元件中的至少一个的夹紧结构。 面板结构可以包括一个或多个支撑延伸部。