会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 83. 发明申请
    • WIRED PIPE AUTO-STABBING GUIDE
    • 有线管道自动稳定指南
    • WO2017087453A1
    • 2017-05-26
    • PCT/US2016/062168
    • 2016-11-16
    • BAKER HUGHES INCORPORATED
    • MACPHERSON, John D.PRAMMER, Manfred G.
    • E21B19/16E21B19/24
    • E21B19/161E21B17/003E21B17/028E21B17/042E21B19/165
    • A wired pipe joining system for joining wired pipe segments having first end, a second end, a first coupler in the first end, a second coupler in the second end, and a transmission medium in communication with the first and second couplers. The system includes: a lower clamp configured to hold a top pipe segment; a top rotation arm to guide a first end of a new pipe segment into a second end of a top pipe segment; a top coupler measurement device configured to connect to a second end of the new pipe segment and receive a signal from a second coupler in the second end of the new pipe segment; and a controller that causes the top rotation arm to move the new pipe segment to cause the signal received by the top coupler measurement to be maximized.
    • 一种有线管道连接系统,用于连接具有第一端,第二端,第一端中的第一连接器,第二端中的第二连接器以及与第一端连接的传输介质的传输介质 第一和第二耦合器。 该系统包括:配置成保持顶管段的下夹具; 顶部旋转臂,用于将新管段的第一端引导至顶管段的第二端; 顶部耦合器测量装置,所述顶部耦合器测量装置被配置为连接到所述新管段的第二端并且接收来自所述新管段的第二端中的第二耦合器的信号; 以及使顶部旋转臂移动新管段以使由顶部耦合器测量接收到的信号最大化的控制器。
    • 85. 发明申请
    • DEPLOYABLE BOW SPRING CENTRALIZER
    • 可配套的弹簧中心
    • WO2017044560A1
    • 2017-03-16
    • PCT/US2016/050670
    • 2016-09-08
    • TOP-CO INC.
    • ANDRIGO, Gregory James Alexander
    • E21B17/10E21B17/16E21B19/24E21B23/00E21B23/01
    • E21B17/1078E21B17/1028
    • A centralizer sub, system, and method for enhanced access to subterranean zones from the surface as used in oil and gas wellbore installations to center a pipe or casing within a wellbore or previous casing string during run-in, installation, or cementing procedures. In under-reamed applications, casing strings and centralizers pass through a smaller casing string before opening up to a larger hole where repeated compressions and decompressions of bow strings of centralizers can compromise integrity and reliability. A centralizer sub, system, and method reduces and controls insertion and running forces to preserve centralizer integrity and down-bore surfaces and equipment.
    • 一种用于在油气井井装置中用于增强从表面进入地下区域的扶正器子系统和方法,以在入井,安装或固井程序期间将管道或套管置于井眼或先前套管柱内。 在未扩孔的应用中,套管柱和扶正器在打开到更大的孔之前穿过较小的套管柱,其中重复的压紧和减压的扶正器的弓弦的折叠可以损害完整性和可靠性。 扶正器子系统和方法减少并控制插入和运行力,以保持扶正器完整性和井下表面和设备。
    • 89. 发明申请
    • DEVICE FOR HANDLING DRILL STRING COMPONENTS IN RESPECT OF A ROCK DRILL RIG AND ROCK DRILL RIG
    • 钻石钻机钻机钻机钻机组
    • WO2015016757A1
    • 2015-02-05
    • PCT/SE2014/000092
    • 2014-06-26
    • ATLAS COPCO CRAELIUS AB
    • WASE, Lars
    • E21B19/20E21B19/16E21B19/24
    • E21B19/161E21B19/08
    • A device (2) for handling drill string components (10) in respect of a drill rig (1), said device including: - gripping means (9) for gripping a first drill string component (10) to be threaded on to or off from a second drill string component (12) being part of a drill string which is partly drilled into a rock formation, and - a handling unit (8) which includes said gripping means (9), and which is movable between a drill string position (D) and a loading position (L) wherein a drill string component can be brought into or taken out from said gripping means. The handing unit (8) includes auxiliary- engagement means (11) for aligning said gripped first drill string component (10) to essentially in line with an axial direction defined by said second drill string component (12). Said gripping means as well as said auxiliary engagement means (11) are adjustable for gripping drill string components of different dimensions with maintained alignment of gripped drill string components. The invention also relates to a rock drill rig including such a device.
    • 一种用于处理关于钻机(1)的钻柱部件(10)的装置(2),所述装置包括:夹紧装置(9),用于夹紧第一钻柱组件(10)以被螺纹连接或断开 从作为部分钻入岩层的钻柱的一部分的第二钻柱组件(12)和 - 包括所述夹紧装置(9)的操纵单元(8),并且其可在钻柱位置 (D)和装载位置(L),其中钻柱部件可以被带入或从所述夹持装置中取出。 处理单元(8)包括辅助接合装置(11),用于使所述夹持的第一钻柱组件(10)基本上与由所述第二钻柱组件(12)限定的轴向对准。 所述夹持装置以及所述辅助接合装置(11)是可调节的,用于夹持不同尺寸的钻柱部件,并保持夹持的钻柱部件的对准。 本发明还涉及包括这种装置的岩石钻机。