热词
    • 11. 发明申请
    • A PROCESS FOR PRODUCING A NUMBER OF PLINTHS, AND AN ARRANGEMENT FOR CARRYING OUT THE PROCESS
    • 生产数量的方法和执行方法的安排
    • WO1984000042A1
    • 1984-01-05
    • PCT/SE1983000239
    • 1983-06-10
    • AB GRYTS BRUKTHELBERG, Erik
    • AB GRYTS BRUK
    • E02D27/01
    • E02D27/01E02D27/14
    • Process for producing a number of plinths (1), particularly pile-type plinths, with a baseplate (7) or a similar construction element supported on the said plinths (1), and also to an arrangement for carrying out the said process. The invention makes possible the rational, quick, simple and economical production of a plurality of plinths (1) with a baseplate (7) etc. supported thereon. At least one casting mould (4) with a shape corresponding substantially to the said plinth (1) is designed to have its sides covered over with a filling material (5), such as macadam, for example, preferably up to the level (6) from which it is desired that the said plate (7) should extend, after which the plinth (1) and the plate (7) are cast, preferably in a single step.
    • 用于生产多个底座(1),特别是具有底板(7)的桩型底座或支撑在所述底座(1)上的类似结构元件)的工艺,以及用于执行所述工艺的装置。 本发明使得能够合理,快速,简单和经济地生产多个底座(1),其中支撑有底板(7)等。 至少一个具有与所述底座(1)基本相对应的形状的铸模(4)被设计成将其侧面用诸如碎石的填充材料(5)覆盖,例如优选地高达(6) ),期望所述板(7)应该延伸,之后浇铸底座(1)和板(7),优选地在单个步骤中。
    • 16. 发明申请
    • METHOD FOR INCREASING LOAD-BEARING CAPACITY OF SOIL
    • 增加土体承载能力的方法
    • WO2004005626A1
    • 2004-01-15
    • PCT/HU2002/000156
    • 2002-12-20
    • MÁTYÁS, Vilmos, BélaTELEKES, GáborSERES, György
    • MÁTYÁS, Vilmos, BélaTELEKES, GáborSERES, György
    • E02D5/44
    • E02D3/054E02D3/08E02D5/48E02D27/14E02D27/26
    • The invention relates to a method for increasing value of physical parameters and load-bearing capacity of soil as well as decreasing consolidation time and expectable settlement, during which a hollow is created by ramming or vibropressing in the soil and a grainy additive, preferably coarse gravel is put into the hollow, then this additive is compacted into the soil by ramming, which is characterized by that, during the ramming the additive compacted into the soil breaks down the original structure of soil and the additive is restructured with the local soil, then additional additive is put into the hollow by additional ramming and this process is repeated until the soil is filled with additive, by this an outer compacted local soil-zone and an inner compacted local soil-zone consisting of a mixture of the additive and the local soil are created, and on said soil a plane basement of a building is made.
    • 本发明涉及一种提高土壤物理参数价值和承载能力的方法以及减少固结时间和预期沉降,在此期间通过夯实或振动在土壤中形成中空部分,并提供颗粒状添加剂,优选粗砾石 放入中空,然后通过夯实将该添加剂压实到土壤中,其特征在于,在夯实期间,压实到土壤中的添加剂分解原始的土壤结构,并将添加剂与当地土壤重组,然后 通过额外的捣打将另外的添加剂放入中空,并且重复该过程直到土壤中充满添加剂,通过外部压实的局部土壤区域和由添加剂和局部混合物组成的内部压实的局部土壤区域 土壤被创建,在所述的土壤上,建立了一个建筑物的地下室。
    • 18. 发明申请
    • IMPROVED METHODS FOR PROVIDING FOUNDATIONS FOR BUILDING STRUCTURES
    • 提供建筑结构基础的改进方法
    • WO1992000425A2
    • 1992-01-09
    • PCT/GB1991001011
    • 1991-06-21
    • ROXBURY LIMITEDBULLIVANT, Roger, Alfred
    • ROXBURY LIMITED
    • E02D27/14
    • E02D27/14
    • A method of forming a building's foundation comprises providing in the ground in which the foundation is to be formed from the level of that ground (10) a trench (12) the depth of which is generally equal to the depth of a foundation beam to be subsequently formed in the trench and prior to forming the beam providing piles (14) extending from the trench bottom at spaced intervals therealong, the beam being formed by placing the reinforcement (14, 18) in the trench (12), connecting the reinforcement (16, 18) with the piles (14) and thereafter filling the trench (12) substantially to its top with concrete (22) which, on setting forms a beam integral with the piles (14). It is preferable that the trench sides converge downwardly.
    • 一种形成建筑物的基础的方法包括在该地面的水平面(10)的地面中设置基础的地面,该沟槽(12)的深度通常等于基础梁的深度 随后形成在沟槽中,并且在形成梁之前,在形成梁的同时提供从沟槽底部以间隔开的间隔延伸的桩(14),梁通过将加强件(14,18)放置在沟槽(12)中而形成, (14),然后用混凝土(22)将沟槽(12)基本上填充到其顶部,在混凝土(22)上,其形成与桩(14)成一体的梁。 沟槽侧部优选向下收敛。
    • 19. 发明申请
    • SADDLE AND HOOK SYSTEM
    • 三角和钩系统
    • WO2015093950A1
    • 2015-06-25
    • PCT/NL2014/050875
    • 2014-12-18
    • IHC NOREX B.V.
    • MULDERIJ, Klaas-Jan
    • B63B35/28
    • F03D13/25B63B9/065B63B35/003B63B35/28B66C1/56E02B2017/0047E02B2017/0065E02B2017/0091E02D27/14E02D27/425F03D13/10F03D13/22F05B2240/95Y02E10/727
    • The invention relates to a pile upending system for upending a pile such as a monopile for the foundation of offshore wind turbines, the pile upending system comprising; - a pivotally mounted pile support frame having a seat for engaging an outside wall of a pile, the pile support frame being pivotable around a support frame axis of rotation for allowing the seat to support the pile during upending, - a cable system for supporting an, in use outboard, end of a pile, comprising one or more tensioned or tensionable cables having an outboard end provided with a hoisting member for supporting the outboard end of the pile during upending of said pile, - an outboard support system comprising a frame member for, in use, extending outboard and supporting the hoisting member of the cable system, wherein the outboard support system is arranged with respect to the pile support frame such that the frame member extends transverse with respect to the support frame axis of rotation for arranging the hoisting member at a distance from the seat and aligned with the seat such that a pile may engage the hoisting member upon longitudinal movement of the pile along the seat.
    • 本发明涉及一种用于升高桩的上升系统,例如用于海上风力发电机的基础的单桩,桩升起系统包括: - 枢转安装的桩支撑框架,其具有用于接合桩的外壁的座,所述桩支撑框架围绕支撑框架旋转轴线可枢转,以允许座椅在升高期间支撑桩; - 缆索系统,用于支撑 包括一个或多个张紧或可张紧的电缆,其外侧端部设置有提升构件,用于在所述桩的上升期间支撑所述桩的外侧端; - 外侧支撑系统,包括框架构件 用于在使用中延伸外侧并支撑电缆系统的提升构件,其中外侧支撑系统相对于桩支撑框架布置,使得框架构件相对于支撑框架轴线方向横向延伸,以布置 提升构件距离座椅一定距离并与座椅对准,使得当桩沿着海洋的纵向运动时,桩可以接合提升构件 吨。