热词
    • 1. 发明申请
    • SYSTEMS AND METHODS FOR LAYING OUT AND INSTALLING A SOLAR PANEL ARRAY
    • 用于铺设和安装太阳能面板阵列的系统和方法
    • WO2012078549A1
    • 2012-06-14
    • PCT/US2011/063389
    • 2011-12-06
    • GROVER, Rick
    • GROVER, Rick
    • E02D11/00
    • E02D7/02E02D13/04E02D27/14G01C15/00G01C15/004
    • A system for installing an array of pilings for an array of solar panels is highly accurate and efficient. The system includes a horizontal laser and a rotating vertical laser that are mounted on a first piling and aligned with a target on a second piling on the opposite side of the array. An alignment template is placed against a piling and aligned with the vertical rotating laser. The aligned template provides a designated location where the next piling is driven. A hammer target on the pile driver allows the installer to precisely install the next piling. After installation, the next piling is measured for accuracy and if errors are found, an alignment bracket is used to correct the error. The process is repeated until the array of pilings is complete.
    • 用于安装太阳能电池板阵列的系列是高度准确和高效的。 该系统包括水平激光器和旋转的垂直激光器,其安装在第一堆叠上并与阵列的相对侧上的第二堆上与目标对准。 将对准模板放置在堆叠处并与垂直旋转激光器对准。 对齐的模板提供驱动下一个打桩的指定位置。 打桩机上的锤子目标允许安装人员精确安装下一个打桩。 安装后,下一次打桩是为了精确度量度,如果发现错误,使用对齐支架来纠正错误。 重复该过程直到打桩阵列完成。
    • 2. 发明申请
    • FOUNDATION ARRANGEMENT
    • 基金会安排
    • WO2007060291A1
    • 2007-05-31
    • PCT/FI2006/050509
    • 2006-11-22
    • RAUTARUUKKI OYJMOISIO, Marko
    • MOISIO, Marko
    • E02D27/14
    • E02D27/14
    • The invention relates to a foundation arrangement for a structure or building, in which columns (4) of the structure or building are supported on piles (2) set in the ground. According to the invention, the foundation arrangement comprises a column (4), a pile group comprising two or more piles (2), and support means (6) extending between each pile (2) and the column (4) in the vertical direction or at an angle relative to the vertical direction for supporting the column (4) on the piles (2), and connecting means (8) for supporting two or more piles (2) in the pile group to each other.
    • 本发明涉及一种用于结构或建筑物的基础装置,其中结构或建筑物的柱(4)支撑在设置在地面中的桩(2)上。 根据本发明,基础装置包括一列(4),一组包括两个或多个桩(2)的桩组和在垂直方向上在每个桩(2)和柱体(4)之间延伸的支撑装置(6) 或相对于垂直方向成一定角度,用于支撑桩(2)在桩(2)上;以及连接装置(8),用于将桩组中的两个或更多个桩(2)彼此支撑。
    • 7. 发明申请
    • SYSTEMS AND METHODS FOR INSERTING SUPPORT MEMBERS INTO THE GROUND
    • 将支持成员插入到地面的系统和方法
    • WO2012095785A1
    • 2012-07-19
    • PCT/IB2012/050113
    • 2012-01-10
    • BRIGHTSOURCE INDUSTRIES (ISRAEL) LTD.HUSS, Shmuel
    • HUSS, Shmuel
    • E02D5/80
    • F24S25/617E02D27/14E02D27/26E02D27/28
    • Support members for heliostats (or other components installed in a field) can be hollow and thin- walled, for example, to reduce construction and/or material costs. However, such support members may be relatively fragile and susceptible to buckling or other damage when driven into relatively rocky and/or hard-packed soil using pile-driving. To avoid damaging the support members, the soil may be pre-conditioned to loosen the soil prior to insertion of the support member therein. An auger can drill a hole in the soil and then be reversed such that soil remains in and/or is subsequently re-introduced into the hole after removal of the auger, thereby leaving a substantially loosened column of soil in the hole. Vibration hammering can cause temporary liquefaction of the soil around the support member to insert the support member into the column of soil while reducing the potential for damage to the support member.
    • 定日镜(或现场安装的其他部件)的支撑构件可以是中空和薄壁的,例如,以减少建筑和/或材料成本。 然而,这种支撑构件可能相对脆弱并且当使用打桩驱动进入相对岩石和/或硬填充土壤时易于屈曲或其它损坏。 为了避免损坏支撑构件,可以在将支撑构件插入其中之前对土壤进行预调节以松开土壤。 螺旋钻可以在土壤中钻一个孔,然后被倒转,使得土壤保留在和/或随后在除去螺旋钻之后重新引入孔中,从而在孔中留下基本松动的土壤柱。 震动锤击可导致支撑构件周围的土壤暂时液化,以将支撑构件插入土壤柱,同时减少对支撑构件的损坏的可能性。
    • 10. 发明申请
    • PILE FOUNDATION STRUCTURE
    • 桩基础结构
    • WO00046451A1
    • 2000-08-10
    • PCT/JP1999/000447
    • 1999-02-03
    • E02D27/14E02D27/16E02D27/34
    • E02D27/14E02D27/34
    • A pile foundation structure employing as a joint structure of head portions of a plurality of piles (1) and a lower portion of a footing (2) a complex structure of a roller support structure (Y) including slip members (12) and a pin support structure (X) including slip members (32), a complex structure of a rigid joint structure (Z) and a roller support structure (Y), or a complex structure of a rigid joint structure (Z) and a pin support structure (X), whereby the occurrence of stress concentration on a joint portion and bending moment on the piles (1) at the time of exertion thereon of a large external force, such as an earthquake force is reduced as the rotation of an upper structure (A) is restricted, to prevent damage to and breakage of the joint portion and piles, and enable the position restoration performance for returning the upper structure (A) to an initial position after the occurrence of the earthquake to be improved.
    • 一种桩基础结构,其采用多个桩(1)的头部和基部的下部(2)的接合结构,所述桩基(2)是包括滑动构件(12)和销的支撑结构(Y)的复合结构 支撑结构(X),包括滑动构件(32),刚性接头结构(Z)和辊支撑结构(Y)的复合结构,或刚性接头结构(Z)和销支撑结构 X),由于随着上部结构(A)的旋转,在施加大的外力(例如地震力)时,在接合部处的应力集中的发生和在桩(1)上的弯曲力矩的减小 )被限制,以防止接头部分和桩的损坏和破损,并且使得能够改善在发生地震之后使上部结构(A)返回到初始位置的位置恢复性能。