会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Unloading system for unloading a circuit board automatically
    • 自动卸载电路板卸载系统
    • US09095086B2
    • 2015-07-28
    • US14084594
    • 2013-11-19
    • Wistron Corporation
    • Hai-Jun PengYu-Hsi LanSui-Kuan SunChun-Kai Wang
    • H05K13/00B65G17/12
    • H05K13/0061B65G17/12H05K13/0069
    • An unloading system includes a casing, a conveying device, a capturing device and a control device. A first entrance, a first exit and a second exit are formed on the casing. The conveying device is for conveying a carrying component and a circuit board disposed on the carrying component from the first entrance. The capturing device is for capturing the circuit board and then conveying the circuit board to the first exit. The control device is electrically connected to the conveying device and the capturing device. The control device is for controlling the capturing device to capture the circuit board entering from the first entrance and then to convey the circuit board to the first exit. The control device is further for controlling the conveying device to convey the carrying component from which the circuit board is unloaded to the second exit.
    • 卸载系统包括壳体,输送装置,捕获装置和控制装置。 第一入口,第一出口和第二出口形成在壳体上。 输送装置用于从第一入口传送设置在承载部件上的承载部件和电路板。 捕获装置用于捕获电路板,然后将电路板传送到第一出口。 控制装置电连接到输送装置和捕获装置。 控制装置用于控制捕获装置捕获从第一入口进入的电路板,然后将电路板传送到第一出口。 控制装置还用于控制输送装置将输送组件从电路板卸载到第二出口。
    • 3. 发明授权
    • Automatic test equipment and a testing method thereof
    • 自动测试设备及其测试方法
    • US09151796B2
    • 2015-10-06
    • US13897954
    • 2013-05-20
    • Wistron Corporation
    • Chun-Kai WangHai-Jun Peng
    • G01R31/28G11C29/56
    • G01R31/2834G01R31/2806G01R31/2886G01R31/2889G11C29/56
    • An automatic test equipment includes a test apparatus, a first control device, a first assisting device, and a second control device. The test apparatus is applied for testing a first object, wherein the test apparatus has a first cover. The first control device has an activating device. The first assisting device is electrically connected to the first control device. The second control device is electrically connected to the first control device and the test apparatus. When the activating device is activated, the first control device controls the first assisting device to lower the first cover and then the first control device transmits a first control signal to the second control device for allowing the test apparatus to test the first object.
    • 自动测试设备包括测试设备,第一控制设备,第一辅助设备和第二控制设备。 测试装置用于测试第一物体,其中测试装置具有第一盖。 第一控制装置具有启动装置。 第一辅助装置电连接到第一控制装置。 第二控制装置电连接到第一控制装置和测试装置。 当启动装置被激活时,第一控制装置控制第一辅助装置降低第一盖,然后第一控制装置向第二控制装置发送第一控制信号,以允许试验装置测试第一物体。
    • 4. 发明申请
    • UNLOADING SYSTEM FOR UNLOADING A CIRCUIT BOARD AUTOMATICALLY
    • 卸载电路板自动卸载系统
    • US20140271056A1
    • 2014-09-18
    • US14084594
    • 2013-11-19
    • Wistron Corporation
    • Hai-Jun PengYu-Hsi LanSui-Kuan SunChun-Kai Wang
    • H05K13/00
    • H05K13/0061B65G17/12H05K13/0069
    • An unloading system includes a casing, a conveying device, a capturing device and a control device. A first entrance, a first exit and a second exit are formed on the casing. The conveying device is for conveying a carrying component and a circuit board disposed on the carrying component from the first entrance. The capturing device is for capturing the circuit board and then conveying the circuit board to the first exit. The control device is electrically connected to the conveying device and the capturing device. The control device is for controlling the capturing device to capture the circuit board entering from the first entrance and then to convey the circuit board to the first exit. The control device is further for controlling the conveying device to convey the carrying component from which the circuit board is unloaded to the second exit.
    • 卸载系统包括壳体,输送装置,捕获装置和控制装置。 第一入口,第一出口和第二出口形成在壳体上。 输送装置用于从第一入口传送设置在承载部件上的承载部件和电路板。 捕获装置用于捕获电路板,然后将电路板传送到第一出口。 控制装置电连接到输送装置和捕获装置。 控制装置用于控制捕获装置捕获从第一入口进入的电路板,然后将电路板传送到第一出口。 控制装置还用于控制输送装置将输送组件从电路板卸载到第二出口。
    • 5. 发明授权
    • Manufacturing system and manufacturing method
    • 制造系统及制造方法
    • US09022204B2
    • 2015-05-05
    • US14059470
    • 2013-10-22
    • Wistron Corporation
    • Chun-Kai WangHsueh-Yen LaiXin-Hua Wang
    • B65G47/26B65G47/64
    • B65G47/643H01L21/67715
    • A manufacturing system includes a first conveyer apparatus, a second conveyer apparatus and a manufacturing apparatus. The first conveyer apparatus has a first conveyer unit and a first elevator unit. The first elevator unit is adapted to drive the first conveyer unit to move upward or downward between first and second positions. The second conveyer apparatus has a second conveyer unit and a second elevator unit. The second elevator unit is adapted to drive the second conveyer unit to move upward or downward between third and fourth positions. The manufacturing apparatus disposed between the first and second conveyer apparatuses has a manufacturing unit, a third conveyer unit and a fourth conveyer unit. A conveying path of the third conveyer unit passes through the manufacturing unit. The first and third positions are aligned to the third conveyer unit. The second and fourth positions are aligned to the third conveyer unit.
    • 制造系统包括第一输送装置,第二输送装置和制造装置。 第一输送装置具有第一输送单元和第一升降单元。 第一电梯单元适于驱动第一输送单元在第一和第二位置之间向上或向下移动。 第二输送装置具有第二输送单元和第二升降单元。 第二升降机单元适于驱动第二输送单元在第三和第四位置之间向上或向下移动。 设置在第一和第二输送设备之间的制造设备具有制造单元,第三输送单元和第四输送单元。 第三输送单元的输送路径通过制造单元。 第一和第三位置与第三输送单元对准。 第二和第四位置与第三输送单元对准。
    • 7. 发明申请
    • MANUFACTURING SYSTEM AND MANUFACTURING METHOD
    • 制造系统和制造方法
    • US20140311857A1
    • 2014-10-23
    • US14059470
    • 2013-10-22
    • Wistron Corporation
    • Chun-Kai WangHsueh-Yen LaiXin-Hua Wang
    • B65G47/64
    • B65G47/643H01L21/67715
    • A manufacturing system includes a first conveyer apparatus, a second conveyer apparatus and a manufacturing apparatus. The first conveyer apparatus has a first conveyer unit and a first elevator unit. The first elevator unit is adapted to drive the first conveyer unit to move upward or downward between first and second positions. The second conveyer apparatus has a second conveyer unit and a second elevator unit. The second elevator unit is adapted to drive the second conveyer unit to move upward or downward between third and fourth positions. The manufacturing apparatus disposed between the first and second conveyer apparatuses has a manufacturing unit, a third conveyer unit and a fourth conveyer unit. A conveying path of the third conveyer unit passes through the manufacturing unit. The first and third positions are aligned to the third conveyer unit. The second and fourth positions are aligned to the third conveyer unit.
    • 制造系统包括第一输送装置,第二输送装置和制造装置。 第一输送装置具有第一输送单元和第一升降单元。 第一电梯单元适于驱动第一输送单元在第一和第二位置之间向上或向下移动。 第二输送装置具有第二输送单元和第二升降单元。 第二升降机单元适于驱动第二输送单元在第三和第四位置之间向上或向下移动。 设置在第一和第二输送设备之间的制造设备具有制造单元,第三输送单元和第四输送单元。 第三输送单元的输送路径通过制造单元。 第一和第三位置与第三输送单元对准。 第二和第四位置与第三输送单元对准。