会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明申请
    • METHOD AND APPARATUS FOR CONSTRUCTION SIMULATION
    • 用于构造模拟的方法和装置
    • US20120005103A1
    • 2012-01-05
    • US13173167
    • 2011-06-30
    • Hiroshi SekiTakeshi Yokota
    • Hiroshi SekiTakeshi Yokota
    • G06Q10/00
    • G06Q10/103G06F17/5004G06F2217/34G06Q10/04G06Q50/08
    • In a construction simulation apparatus: a 3-D already-existing model, installation progress data, and a 3-D new-construction model are recorded in databases; a match determination unit determines similarity in one or more installation positions of one or more of pieces of equipment and piping components between the 3-D already-existing model and the 3-D new-construction model; and a progress selection unit selects, as portions of installation schedule data corresponding to the 3-D new-construction model, portions of the installation progress data corresponding to matching portions of the 3-D already-existing model, on the basis of data indicating a correspondence relationship between the 3-D already-existing model and the installation progress data, where the matching portions of the 3-D already-existing model are extracted by the match determination unit and respectively match the portions of the 3-D new-construction model.
    • 在建筑模拟装置中:数据库中记录了现有3-D模型,安装进度数据和3-D新建模型; 匹配确定单元确定3-D已经存在的模型和3-D新建模型之间的一个或多个设备和管道组件的一个或多个安装位置的相似性; 并且进度选择单元根据指示的三维数据的数据,选择与3-D新建模型相对应的安装进度数据的部分与安装进度数据的对应于3-D已存在模型的匹配部分的部分 3-D已经存在的模型与安装进度数据之间的对应关系,其中3-D已存在模型的匹配部分由匹配确定单元提取,并且分别匹配3-D新建模型的部分, 施工模式。
    • 9. 发明授权
    • Vehicle water drainage structure
    • 车辆排水结构
    • US07350855B2
    • 2008-04-01
    • US11480550
    • 2006-07-05
    • Hiroshi Seki
    • Hiroshi Seki
    • B60R27/00
    • B60H1/3233
    • A water drainage structure is provided to prevent drainage water from getting on hot components inside the engine compartment and suppress the occurrence of evaporation noise. At least one water drainage opening is provided in a bottom portion of a vehicle member arranged on the under surface of a floor panel of a vehicle. The downstream end portion of a water drainage pipe is arranged to communicate with the inside of a closed cross sectional structure formed by the floor panel and the vehicle member. Drainage water from a vehicle device flows out of the downstream end portion of the water drainage pipe and is discharged to the outside of the vehicle through the water drainage openings of the vehicle member. As a result, the drainage water is prevented from getting on hot components inside the engine compartment of the vehicle and the occurrence of evaporation noise is suppressed.
    • 提供排水结构,以防止排水从发动机舱内的热部件上排出,并抑制蒸发噪音的发生。 至少一个排水口设置在布置在车辆底板的下表面上的车辆构件的底部中。 排水管的下游端部布置成与由地板镶板和车辆构件形成的封闭横截面结构的内部连通。 来自车辆装置的排水从排水管的下游端部流出,通过车辆部件的排水口排出到车辆外部。 结果,能够防止排水在车内的发动机室内发热,能够抑制蒸发噪音的发生。