热词
    • 1. 发明授权
    • Managing power and performance
    • 管理权力和绩效
    • US08051156B1
    • 2011-11-01
    • US11495360
    • 2006-07-28
    • Ratnesh SharmaCullen E. BashChandrakant PatelChih C. Shih
    • Ratnesh SharmaCullen E. BashChandrakant PatelChih C. Shih
    • G06F15/173G05B15/00
    • G06F9/5094Y02D10/22
    • A method for integrating information technology (IT) data with non-IT data, comprising: first identifying a non-IT network for accessing non-IT data, second identifying an IT network from which to access the non-IT data from the non-IT network, first determining that the non-IT network is accessible via at least one interface based on Object Linking and Embedding for Process Control (OPC) for accessing at least one device in the non-IT network, second determining that the IT network includes an architecture for Simple Network Management Protocol (SNMP) or Web Based Enterprise Management (WBEM) for managing at least one device in the IT network, and providing the IT network with access to data of the at least one device in the non-IT network by accessing the at least one OPC-based interface via either the SNMP-capable architecture or the WBEM architecture of the IT network.
    • 一种用于将信息技术(IT)数据与非IT数据集成的方法,包括:首先识别用于访问非IT数据的非IT网络,第二识别从所述非IT数据访问所述非IT数据的IT网络, IT网络首先确定通过至少一个基于对象链接和嵌入用于过程控制(OPC)的接口来访问非IT网络,用于访问非IT网络中的至少一个设备,第二确定IT网络包括 用于简单网络管理协议(SNMP)或基于Web的企业管理(WBEM)的架构,用于管理IT网络中的至少一个设备,以及向IT网络提供对非IT网络中的至少一个设备的数据的访问 通过经由支持SNMP的架构或IT网络的WBEM架构访问至少一个基于OPC的接口。
    • 2. 发明申请
    • MANAGEMENT OF A VIRTUAL POWER INFRASTRUCTURE
    • 虚拟电力基础设施管理
    • US20110307110A1
    • 2011-12-15
    • US12813012
    • 2010-06-10
    • Ratnesh Kumar SharmaAmip J. ShahCullen E. BashChih C. ShihChandrakant Patel
    • Ratnesh Kumar SharmaAmip J. ShahCullen E. BashChih C. ShihChandrakant Patel
    • G06F1/26
    • G06F1/26
    • A virtual power infrastructure for managing distribution of power to a plurality of power demanding units from a plurality of power generators includes a demand manager having logical descriptions of the power demanding units, in which the demand manager is configured to determine power load demands of the power demanding units using the logical descriptions of the power demanding units, and a capacity manager having logical descriptions of the power generators. The capacity manager is configured to determine allocation of power capacity supplied to the power generators from one or more of the power generators to meet the power load demands of the power demanding units, while satisfying one or more predetermined constraints associated with at least one of the power demanding units and the power generators.
    • 用于管理来自多个发电机的多个功率需求单元的电力分配的虚拟电力基础设施包括具有对功率需求单元的逻辑描述的需求管理器,其中需求管理器被配置为确定电力的功率负载需求 使用功率要求单元的逻辑描述的要求苛刻的单元,以及具有发电机的逻辑描述的容量管理器。 容量管理器被配置为确定从一个或多个发电机提供给发电机的功率容量的分配,以满足功率需求单元的功率负载需求,同时满足与至少一个功率发生器相关联的一个或多个预定约束 电力要求单位和发电机。