会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明授权
    • Outer pipe sleeve for sea floor mooring pile
    • 海底系泊套管外套管
    • US08465229B2
    • 2013-06-18
    • US12741853
    • 2008-11-07
    • Alasdair MaconocieJohn OliphantPierre-Armand Thomas
    • Alasdair MaconocieJohn OliphantPierre-Armand Thomas
    • E02D5/64
    • B63B21/26E21B7/20
    • The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.
    • 本公开提供了一种用于增加桩上的锚定力的改进的系统和方法。 关于桩的概念可以适用于桩是否退化并且不再能够支撑其预期载荷,或者桩上的载荷已经增加到可能过度施加桩的水平。 即使在海底条件下也可以安装套筒,并且可以用于为现有桩提供额外的固定力。 套筒可以包括用于将锚定线或其它联接构件联接到要固定的结构的自己的垫。 套筒还可包括与至少一个纵向构件联接在一起的环组件。 具有彼此隔开一定距离的环的组件可以有助于减小套筒上安装在海底上的安装摩擦力。
    • 6. 发明申请
    • OUTER PIPE SLEEVE FOR SEA FLOOR MOORING PILE
    • 用于海面运动桩的外管套管
    • US20110002742A1
    • 2011-01-06
    • US12741853
    • 2008-11-07
    • Alasdair MaconocieJohn OliphantPierre-Armand Thomas
    • Alasdair MaconocieJohn OliphantPierre-Armand Thomas
    • E02D5/00
    • B63B21/26E21B7/20
    • The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.
    • 本公开提供了一种用于增加桩上的锚定力的改进的系统和方法。 关于桩的概念可以适用于桩是否退化并且不再能够支撑其预期载荷,或者桩上的载荷已经增加到可能过度施加桩的水平。 即使在海底条件下也可以安装套筒,并且可以用于为现有桩提供额外的固定力。 套筒可以包括用于将锚定线或其它联接构件联接到要固定的结构的自己的垫。 套筒还可包括与至少一个纵向构件联接在一起的环组件。 具有彼此隔开一定距离的环的组件可以有助于减小套筒上安装在海底上的安装摩擦力。